The maintenance glossary.
The words a maintenance team uses, each defined in one sentence and then explained with an example. Terms with a guide of their own link to it.
Terms from A to Z
- Asset criticality
- A score for how much an asset's failure would matter, usually the consequence of a failure multiplied by its likelihood, used to decide where maintenance effort goes first.
- Asset hierarchy
- The way a site's equipment is arranged in levels, from the whole site down to the components maintained on their own, so that each job lands at the right level.
- Asset lifecycle management
- Looking after a piece of equipment through every stage of its life, from deciding it is needed and buying it to running, maintaining and finally disposing of it, at the lowest total cost.
- Autonomous maintenance (jishu hozen)
- The pillar of total productive maintenance in which machine operators clean, inspect, lubricate and tighten their own equipment to a written standard, and report what they find.
- Bill of materials (maintenance BOM)
- The list of spare parts that fit one asset, with their part numbers and how many the asset holds, so the right part can be found, stocked or ordered when it needs work.
- Condition monitoring
- Measuring a sign of a machine's health, such as vibration, temperature or oil condition, at regular intervals and watching the trend, so a developing fault is found before it causes a failure.
- Condition-based maintenance (CBM)
- Maintenance done when a measured or inspected condition of a machine, such as a temperature, a vibration level or the wear on a part, crosses a limit set in advance, instead of on a fixed date.
- Corrective maintenance
- Maintenance that restores equipment once a fault is found, whether an inspection found it before anything failed or a breakdown revealed it.
- Economic order quantity (EOQ)
- The order size that makes the yearly cost of placing orders plus the yearly cost of holding stock as small as possible, for an item used at a steady rate.
- Failure codes
- Short, fixed codes recorded when a repair is closed, saying what the problem was, what caused it and what was done, so that repeat failures can be counted.
- Fault tree analysis (FTA)
- A top-down method that starts from one unwanted event and maps, through AND and OR gates, every failure or combination of failures that could cause it.
- First-time fix rate (FTFR)
- The share of repair jobs fixed on the first attempt, with no return visit, no callback and no reopened work order for the same fault.
- Infrared thermography
- Using a thermal imaging camera to see surface temperatures, so heat from a loose electrical connection, an overloaded circuit, a failing bearing or a stuck steam trap shows up before it causes a failure.
- Maintenance backlog
- All the maintenance work that has been approved but not yet done, usually counted in hours and turned into weeks of work for the crew.
- Mean time between failures (MTBF)
- The average operating time a repairable machine runs between one failure and the next: its operating hours over a period divided by the number of failures.
- Mean time to failure (MTTF)
- The average operating time a non-repairable item, such as a bearing, seal or lamp, runs before it fails: the total operating hours of a group of identical items divided by the number that failed.
- Mean time to repair (MTTR)
- The average time it takes to get a failed asset working again: the total hours from failure to back in service over a period, divided by the number of failures.
- MRO inventory
- The maintenance, repair and operations supplies a site keeps to run its equipment and buildings: spare parts, maintenance supplies such as grease and filters, and operating supplies such as gloves.
- Oil analysis
- Testing samples of a machine's lubricating or hydraulic oil in a lab for wear metals, contamination, water and the oil's own condition, to find wear and its causes before they lead to a failure.
- Overall equipment effectiveness (OEE)
- The share of planned production time that turns into good output at the ideal rate, found by multiplying availability, performance and quality; 100% means no stops, no slow running and no defects.
- P-F curve (P-F interval)
- A graph of a machine's condition over time, from the point P where a developing fault can first be detected to the point F where the machine fails; the time between them is the P-F interval.
- Pencil whipping
- Marking an inspection or checklist as done without doing the checks, usually by ticking every box at once at the end of a shift.
- Planned maintenance
- Maintenance work prepared before it starts, with the scope, parts, tools, time and safety steps worked out in advance, whether the job is preventive or a repair.
- Planned maintenance percentage (PMP)
- The share of all maintenance labor hours spent on work that was planned before it started, rather than on breakdowns: planned hours divided by total maintenance hours, times 100.
- PM compliance
- The share of preventive maintenance jobs due in a period that were completed on time, by the due date or within a grace window the team sets.
- Precision maintenance
- Doing the basic mechanical work, such as shaft alignment, balancing, lubrication and fastening, to a measured tolerance with the right tools, and recording the result.
- Proactive maintenance
- Maintenance aimed at finding and removing the causes of failure, such as misalignment, contamination or poor installation, rather than only repairing the failures.
- Risk-based maintenance (RBM)
- Setting maintenance priorities and intervals by risk: how likely each failure is, multiplied by how bad it would be, so the riskiest equipment gets the most attention.
- Routine maintenance
- Small, frequent maintenance tasks done on a regular round, such as cleaning, lubricating, topping up, tightening and looking for problems, usually minutes rather than hours.
- Run to failure (RTF)
- A deliberate choice to do no preventive work on an item and to repair or replace it only when it fails, used where failure is cheap, safe and quickly fixed.
- Schedule compliance
- The share of the work on a week's maintenance schedule that was done that week as scheduled, counted in hours or in jobs.
- Scheduled maintenance
- Maintenance work that has been given a date and a person to do it, whether it is a recurring service or a one-off repair booked for a set day.
- Time-based maintenance (TBM)
- Preventive maintenance done at fixed intervals of calendar time or running time, such as every month or every 500 hours, whatever condition the equipment is in.
- Unplanned downtime
- Time an asset is stopped when nobody scheduled it to stop: breakdowns, trips and the wait for repair, as opposed to planned stops for maintenance.
- Useful life
- How long a piece of equipment is expected to stay in service doing its job at a reasonable cost. Engineers, tax rules and reliability charts each use the term in a different way.
- Vibration analysis
- Measuring and studying the vibration of rotating machines, as an overall level and by frequency, to find faults such as imbalance, misalignment, looseness and bearing wear before they cause a failure.
- Wrench time
- The share of a technician's paid hours spent on hands-on maintenance work, as opposed to waiting, walking, looking for parts or doing paperwork.