A maintenance yard at first light, with a row of parked lift trucks, a street sweeper and a towable generator outside a workshop.

Fleet maintenance software for the shop that keeps the trucks out.

Maintenance software for a fleet's shop: services, pre-trip inspections, the parts room and one record for every vehicle. Services repeat by the calendar only: nothing comes due from miles or engine hours, and no odometer is read for you.

What it does there

The service, the pre-trip, the yard, the parts room: four parts of the app.

Preventive maintenance

Services that come due by the calendar.

Set a truck's oil and filter service to repeat every three months, worked out from its mileage interval. Completing it creates the next, with its checklist, parts and assignee. Miles driven change nothing.

A truck's oil and filter service: it started yesterday and is due on Thursday, repeats every 3 months on the 15th, and is estimated at an hour and a half.

Procedures

A brake light out, caught before the truck leaves the yard.

Tires, lights and the liftgate are each answered Pass, Flag or Fail. A fail asks for a finding and a photo, and offers a follow-up work order and to mark the truck down.

The start of a pre-trip inspection: tires and wheels passed, and brake lights failed with the finding that the right brake light is out and the lens is cracked.

Assets and locations

Which truck is down, which trailer is in the bay.

The list shows each vehicle under the yard it is kept in, with its open work. One that is down or in the bay is marked, and a job past its date shows as overdue.

The assets list for the main yard: a tractor, two trailers and four trucks, with one trailer in maintenance, one with an overdue job and one truck down.

Parts and purchasing

Two oil services due, and no oil filter in the parts room.

Each oil service compares its own need with the parts room, so two services each show 1 short when the shelf is empty. The shortfall is not added up across jobs.

An oil filter's stock: none on hand in the parts room against a reorder level of 4, and two oil services that each need one and are 1 short.

In fleet

Built around what a fleet shop works on.

The calendar fits trucks on steady routes, where a maker's mileage interval can be turned into months. If your services must follow the odometer week by week, this is the wrong tool.

  • Trucks and vansEvery vehicle has one record: its open work, its last service and what it has taken in parts this year. A liftgate or reefer repair stays on that truck's record.
  • TrailersMark a trailer In maintenance while it is in the bay, and Down when it must not leave the yard. A yearly inspection can repeat on it, and shows as overdue if it slips.
  • Services by the calendarTurn the maker's mileage interval into months, checked against the busiest month. Completing one service creates the next, with its filter and its oil on the job.
  • Pre-trip inspectionsA failed check asks for a finding and a photo, and offers a follow-up work order and to mark the vehicle down. The driver who answers it needs a Full user seat.
  • The parts roomOil filters by engine, trailer brake shoe kits and marker lamps are counted against a reorder level, and a service that will run short says so.
  • Generators and shop equipmentThe bay lift's monthly check and the yard generator's monthly run repeat beside the trucks' services, on records of their own.

Questions

Fleet, in plain answers.

See every module on the features page. Lay out the year's services, truck by truck, with the free maintenance schedule maker.

What is fleet maintenance software?

It is software that keeps a fleet's maintenance in one place: each vehicle's record, the services that repeat, the inspections, the repairs, the parts room and the history of what was done. Maintensor covers the shop's side of that, by the calendar. It does not do dispatch or routing.

Does it schedule service by mileage or engine hours?

No. Services repeat by the calendar only: daily, weekly, monthly or yearly. A checklist step can record the odometer as a number, and it is kept with the job, but the app does not add it up or schedule from it. To use the calendar, divide the maker's mileage interval by the truck's miles a month, round down and check the busiest month. If a truck's miles swing too much for that, this is the wrong tool for it.

Does it track fuel, GPS or telematics?

No. Maintensor is maintenance software: work orders, services, inspections, parts and vehicle records. It has no fuel log and connects to no telematics device.

Can drivers report defects?

Yes. Give drivers the Requester role and they report a defect in one line, from a phone, in words only: a request carries no photo. Requesters cost nothing in any plan, but cannot run checklists: a driver who answers a pre-trip checklist needs a Full user seat.

Does it keep the records an inspection program needs?

It keeps what was done on each vehicle, who completed it and when, with each checklist's answers and sign-off. In the US, for example, 49 CFR 396.17 requires every commercial motor vehicle, each one in a combination included, to pass an inspection at least once in the preceding 12 months; that can be a job repeating yearly on each truck and trailer. The next date counts from the last due date, not the day it was done, so after an early inspection move the next due date to stay inside the 12 months. There is no driver vehicle inspection report built in: you build your own checklist and check that it meets your rules. Maintensor does not certify compliance with any transport regulation, and it has no export, so the records are read in the app.

Does it work on a phone in the yard?

Yes, in the browser, so there is nothing to install. It needs a network connection: there is no offline mode, so a driver out of signal cannot open a checklist or report a defect until back in range.

Start with the truck that is in the shop most.

Start the trial, add that truck and turn its mileage interval into a number of months. Its last few odometer readings will tell you whether the calendar can hold it.

30-day free trial. No credit card.