What is a CMMS? A plain guide for the maintenance manager

CMMS stands for computerized maintenance management system: software that keeps a maintenance team's work in one shared record. It replaces the whiteboard, the paper work order and the spreadsheet.

By MaintensorUpdated 8 min read

Key points

  • A CMMS holds the jobs, the equipment, the preventive schedule, the spare parts and the history of what was done.
  • It stores information and does not make decisions: it shows a gearbox's jobs, not when to replace it.
  • A spreadsheet is enough while one person keeps it and nobody asks for numbers.
  • A CMMS is not an ERP, an EAM suite or a predictive maintenance system.
  • Prices run per user per month, per asset or site, as a license plus support, or as a free plan.

What does a CMMS do?

A CMMS is where a maintenance team writes down the work as it happens, so anyone on the crew can see what broke, who is on it, what is due this week, when a machine was last serviced and whether the part is in stock.

A work order with its status, priority, asset, assignee, due date and checklist.
One work order: its status, priority, asset, assignee, due date and checklist.

ExampleA made-up Monday at a small plant

Three technicians, about 40 machines and a whiteboard by the shop door.

Without a CMMS With a CMMS
Friday’s leftover jobs are still on the board Each is a work order with a person and a due date
The compressor’s quarterly service lives in a spreadsheet only the manager opens The service comes due on its own
A line supervisor stops the manager, Maria Chen, in the hallway about a leak The leak is a request typed on the floor
A conveyor that tripped twice last week is on a sticky note When it trips again, its record shows the jobs before it

So what is a CMMS used for? To know what work there is, get it done on time, and remember it afterward.

What a CMMS does not do

The U.S. Department of Energy’s Operations and Maintenance Best Practices guide (chapter 4) adds the limit: a CMMS stores information, and it does not make decisions. It will not tell you to replace a gearbox. It will show you the gearbox’s four jobs this year.

What does a CMMS keep track of?

A CMMS usually keeps track of eight things, under different names. Each links to its guide.

Part What it holds The question it answers
Work orders Each job: what, where, who, when, and what was done What is open, and who has it?
Preventive maintenance Jobs that come back on a schedule, by the calendar or by usage What is due, and was it done?
Procedures and checklists The steps of a job, answered at the machine Was it done the same way every time?
Requests Problems reported by people outside the crew What was reported, and what happened to it?
Assets and locations The equipment, where it sits, and its history What do we look after?
Parts and purchasing Stock, reorder levels, orders to vendors Do we have it, and is it on order?
Planning the week Who does what, on which day Is anyone overbooked? What has no date?
Reporting Counts and times added up from the records How much was planned? What breaks most?

When you set one up, start with the equipment that stops production, or guests, when it fails. Every part of Maintensor has its own page, with real pictures: work orders, preventive maintenance, procedures, requests, assets and locations, parts and purchasing, the planner and reporting.

Who uses a CMMS?

Four kinds of people use a CMMS, in plants, food and beverage plants, warehouses, buildings, fleets and hotels alike.

The maintenance manager or lead
Sets it up, approves requests and plans the week.
Technicians
Work their jobs from a phone.
Requesters
Report problems and want to know they were fixed.
The plant manager or owner
Reads the numbers.

When a whiteboard and a spreadsheet stop being enough

A spreadsheet is a fine system while one person keeps it and nobody asks for numbers. If that is you, keep it. It stops being enough when:

  • two people edit it, and there are two versions: the shared one and “PM schedule FINAL (2)”;
  • a service is missed because nobody opened the sheet that week;
  • “when was this last done?” means scrolling, asking around or digging out a binder;
  • your manager asks how much of last month’s work was planned, and the answer takes an afternoon;
  • the person who built it goes on vacation, and the system goes with them.

Not sure? The maintenance spreadsheet guide has a ten-question test.

What are the benefits of a CMMS?

A CMMS makes maintenance work harder to lose and easier to see. What changes:

  • Preventive work stops depending on memory. It comes due by itself, and a late job shows as late.
  • Repairs start with history. The technician sees the last three jobs on this pump.
  • Fewer requests get lost. Everything reported lands in one queue.
  • Fewer jobs stop for parts. A low shelf shows before the job, not during it.
  • The week is visible. An overbooked person shows on Friday, not on Wednesday.

Percentages quoted for what a CMMS saves are left out here: the result depends on where your team starts and whether the crew uses it. To work out your own, see CMMS ROI.

How a CMMS fails

The DOE guide names how a CMMS fails: the wrong system, too little training, and nobody committed to using it. Successful installations, it notes, usually have a “champion”. In a small crew, that is the manager.

CMMS vs ERP and EAM, and what else a CMMS is not

A CMMS runs the maintenance work; ERP and EAM software cover much more.

Not an ERP
ERP (enterprise resource planning) is a company’s business system: accounting, purchasing, payroll, production planning. Some have a maintenance module, but they are built for finance first. A CMMS is built for the crew.
Not an EAM suite
EAM (enterprise asset management) covers an asset’s whole life, often across many sites: buying it, maintaining it, budgeting its replacement, disposing of it. It is usually installed as a project, with consultants. A CMMS is the maintenance part.

It is not predictive maintenance either, which bases work on a machine’s measured condition instead of a preset schedule. A CMMS records the work that follows. The DOE guide advises against buying predictive equipment without a serious commitment to training, and suggests contracting the service out.

How to choose a CMMS: questions to ask any vendor

Ask every vendor the same questions, see each answer in the product, then try the best one on real work for two weeks. Start with these five:

  1. Can a technician learn it without training? Hand it to one of yours for an hour with no help, and watch.
  2. What happens with no signal?
  3. How does preventive work come due? By date, by meter reading, or both?
  4. Who has to pay, and can you get your records out if you leave?
  5. What does it not do? A vendor that answers this one plainly is easier to trust on the rest.

How to choose a CMMS has all ten questions, a scorecard and the trial plan. After you choose, the first two weeks cover the rollout.

How much does a CMMS cost?

There is no one market price: CMMS products charge per user per month, per asset or site, or for a license, and many have a free plan. Maintensor charges per user per month, with a Free plan for up to 3 users and free accounts for people who only report problems. The pricing page has the prices and what each plan includes.

Per user per month
Common for web-based products. Some charge less, or nothing, for people who only report problems.
Per asset or per site
The price follows how much equipment or how many buildings you have.
A license plus yearly support
For software installed on your own servers.
Free plans
With limits on users, assets or features.

A vendor’s listed price is not the whole cost. Add any setup fee, training, add-on modules, tablets and the hours spent entering your records.

Maintensor, and a week in it

Maintensor is a CMMS for small and mid-size maintenance teams, made to be learned without training. It is one web app that runs in the browser on a desk and on a phone. Admins run the account and approve requests. Admins and Full users plan and do the work. Requesters report problems for free.

  1. Approve. Maria Chen, the manager, approves Monday’s requests into work orders.
  2. Plan. She puts them on people’s days in the planner.
  3. Work. Ben Carter opens a job on his phone and answers the checklist one step at a time.
  4. Complete. The parts come off stock, and if the job repeats, the next one is created on its schedule.
The planner from Monday to Wednesday, with five people in two teams, a late job, two jobs that run over several days, a job that is short of parts and a day marked over capacity.
The planner from Monday to Wednesday: people down the side, days across, and a late job in a column of its own.

Free is limited to 3 users, 3 procedures and 5 recurring work orders. Pro adds the planner and reporting; Max adds cost tracking and purchase orders. Every new team starts with 30 days of Pro.

What it does not do

  • No preventive work by meter, mileage or run hours: repeats run by the calendar only.
  • Nothing predictive, and no sensor connections.
  • No export. Import, on Pro and Max, covers only locations, assets, parts, vendors, work orders and users.
  • No API or integrations with other systems.
  • No offline mode and no native app, so a technician needs a connection.
  • No public request form, because requesters sign in.

Two numbers to read closely: a part’s shortage compares each work order on its own, not all of them added up, and Reporting’s mean time to repair runs from creating a reactive work order to completing it, so it is not hands-on time.

See every part of the product, or compare the plans on the pricing page.

Questions

What people also ask.

More in the blog, or see the whole product on the features page.

Is Excel a CMMS?

Excel is not a CMMS, though plenty of teams use a spreadsheet as one. It can hold an asset list and a preventive schedule, but it does not create the next job when one is finished, take used parts off stock, or keep a record of each job unless someone types it in.

What is the difference between a CMMS and CAFM software?

CAFM (computer-aided facility management) software manages a building as space: floor plans, room bookings, moves, leases and occupancy. A CMMS manages the maintenance work on the equipment inside it. Some CAFM products include maintenance features, and a facilities team that mostly services equipment should judge them on those.

Can a CMMS help with inspections and audits?

A CMMS keeps a dated record of each inspection: who did it, what each step found, and any follow-up work. That is the record an auditor usually asks to see. The software does not make a site compliant; the inspections still have to meet whatever rule applies.

How long does it take to set up a CMMS?

Setting up a CMMS takes as long as entering what you want it to track, so start small: your locations, the equipment that stops work when it fails, and its recurring jobs. Add the rest as work orders touch it, so the crew works in it from the start.

Do technicians need a special device to use a CMMS?

Most CMMS products run on an ordinary phone or tablet, in the browser or in an app. Ask whether the product works without a signal, because basements, walk-in coolers and yards often have none.

Try it on the work you have this week.

Start the trial, add one asset and write one work order. By the end of the afternoon you will know whether it fits.