Key points
- Before the first demo, write down the three problems you are buying it to fix.
- Ask every vendor the same ten questions, and see each answer in the product.
- A product that needs a training course, or will not run on a phone, is out.
- Then try the best one or two for two weeks on your own assets and jobs.
- Prices per user mean little until you ask who counts as a user.
Start with your own list, not theirs
Before the first demo, write three things on one page. Every vendor will show you forty features. You are checking whether it fixes your three problems.
- The problems you are buying it to fix. Name them as they happen: “the quarterly compressor service was missed twice this year”. Three is enough.
- Who will touch it. Count the people who do the work and, separately, the people who only report problems. The price usually turns on the first number, and whether problems get reported turns on the second.
- What you need this year, and what you might need someday. Meter-based schedules, purchase orders, single sign-on. Put each in one column or the other, and be strict.
Feature overload
The U.S. Department of Energy’s O&M Best Practices Guide (Release 3.0, chapter 4) calls “feature overload” a common complaint of people already using a CMMS, and asks whether you are buying more than you need or can manage.
If you are still deciding whether you need one at all, start with what a CMMS does and when it is worth it, or the honest test of whether a spreadsheet is still enough.
Ten questions to put to any vendor, with a scorecard
Ask every vendor the same ten, in the same words, and ask to see each answer in the product rather than on a slide. Score each answer 0, 1 or 2, and double the score of the questions that match the three problems you wrote down.
- Can a technician use it without a training course? A CMMS is only as good as the work orders closed in it, and technicians close them on their feet. The DOE guide lists inadequate training among the common pitfalls, and its first question for choosing a system is whether field staff helped judge how usable it is.
- Does it work on a phone at the machine, and with no signal? A note written at the end of the shift says “fixed”. Basements, walk-in coolers, steel buildings and yards often have no signal, so ask what works without one: nothing, reading only, or full work that catches up later.
- How does preventive work come due? Schedules run on the calendar, on use (every 500 run hours, every 10,000 miles) or both. If your manuals give hours or miles, a calendar-only system means turning them into an average and living with the error. Ask too what a late job does to the next date.
- Who has to pay? Many products are priced per user, and the people who report problems often outnumber the crew. If every operator or desk clerk needs a paid seat to send a request, requests go back to the hallway and the text message.
- What will it cost in a year, all in? The price per user is one line of the bill. Add any minimum seats, the contract length, a setup fee, add-on modules, the plan that holds the one feature you need, and your own hours to set it up, which no quote includes.
- How do our records get in? Entering locations, assets and preventive schedules is the biggest cost of starting, and it lands on you. Some products import a spreadsheet, some need typing, and some vendors do it for a fee.
- How do our records get out? After a few years, the history is the most valuable thing in the system. An auditor, an insurer, a new owner or a move to another product may need it.
- What does it connect to, and do you need that this year? Accounting, an ERP, building controls, sensors, single sign-on. The DOE guide asks how well a system works with your other systems “if needed”, and the qualifier is the point. A crew of under 15 often needs none of these on the first day.
- What happens after the trial, on a lower plan, or if we stop paying? Records can be deleted, turned read only or held until you pay, and recurring jobs can stop coming due.
- What does it not do? Every product has gaps. A vendor who names them saves you from finding them in the third month.
The scorecard
What a good answer (2) and a bad one (0) sound like; anything between is a 1.
| Question | Scores 2 | Scores 0 |
|---|---|---|
| 1. Technician use | Your technician, for an hour with nobody helping, found a job, started it and closed it | Needs training before anyone can use it |
| 2. On a phone, no signal | Works on your phones, in the browser or an installed app, and with no signal if your site has none, tested in the worst spot you have | Desk only, or “it depends” |
| 3. How work comes due | Comes due the way your manuals say, shown in the product: by date, or by a meter reading if you need it | Cannot express your intervals |
| 4. Who pays | People who only report problems are free, and it says in writing which roles are paid and when a user starts and stops counting | Every requester is a paid seat |
| 5. Yearly cost | Published, no minimum, a monthly option, and the feature you asked about named on a specific plan | Price on request, minimum seats, setup fee |
| 6. Records in | An honest estimate in hours for your number of assets, and a way to start small | “Our team will scope it” |
| 7. Records out | An export of work orders, assets and history in a common format, that you can run yourself. A plain “no” scores 1: it lets you weigh the gap | No export and no straight answer. |
| 8. Connections | The ones you need this year work today, not on a roadmap, and each one’s cost is stated | Your must-have is “coming soon” |
| 9. After the trial | Nothing deleted, and in writing: what is kept, what turns read only, what stops, and for how long | Records held until you pay |
| 10. What it does not do | A short, specific list | “Nothing, really”, or “it’s on the roadmap” after every item |
Three guides go further on these: the schedule guide on fixed dates against dates counted from the last completion, working out a CMMS’s return on setting the yearly cost against what it saves, and a small crew’s first two weeks on starting with 20 assets instead of 400.
The last questions on the DOE guide's list
Finish with how the vendor gives technical help, and how upgrades arrive and at what cost. Ask, too, where your records are kept and whether anyone outside the company has reviewed its security.
Two rules sit above the total
A product that scores 0 on question 1 or 2 is out, however well it does elsewhere: a system the crew does not use returns nothing. A 0 on anything in your “this year” column is out too.
Then try the top one or two on real work
Run the top one or two for two weeks on your own data. A demo is the vendor’s data and the vendor’s clicks.
- Enter a little. Your locations and five real assets: the ones that make the most work.
- Set up recurring jobs. Two or three that come due inside the two weeks.
- Run one technician’s week. Every job your most skeptical technician does goes through it for a week, start to close, on that technician’s own phone.
- Send a real request. Have one person from outside the crew send one, and answer it in the product.
- Plan a week. Plan one week in it, and see whether it shows who is overbooked.
- Score it again. If the crew opened it in the second week without being told to, it fits.
Maintensor’s answers to the same ten
Answered for Maintensor as it is today, gaps included.
- 1. No course needed. Judge it on the trial. A work order needs only a title.
- 2. Phone at the machine. It runs in the phone’s browser, with nothing to install. There is no offline mode and no native app, so a technician needs a signal or Wi-Fi.
- 3. Preventive work. By the calendar only: every so many days, weeks, months or years. The next work order is created when the current one is completed, and its date counts from the last due date, not the day the job was done; a job finished very late skips to the first date after today. Nothing comes due from meters, mileage or run hours.
- 4. Who pays. Admins and Full users, and anyone who runs a checklist needs a Full user seat. Requesters, who report problems and follow them to the end, are free on every plan.
- 5. Cost. Per user per month, on the pricing page, billed monthly or yearly. Free allows 3 users, 3 procedures and 5 recurring work orders, with unlimited work orders, requests, assets and parts. Every new team starts with 30 days of Pro.
- 6. Records in. Import from Excel or CSV on Pro and Max: locations, assets, parts, vendors, work orders and users, with a repeat for schedules. Every row is shown before anything is saved. Procedures are typed in. Max on a yearly plan includes assisted setup.
- 7. Records out. No export and no API. Reporting shows its figures on screen only.
- 8. Connections. None: no integrations and no single sign-on.
- 9. Lower plan. Nothing is deleted. The team moves to Free, and what keeps working is set out below this list.
- 10. What it does not do. Meters, sensors or anything predictive; failure codes; a scanner inside the app (a QR label, on Pro and Max, opens with the phone’s camera); a printable work order; a public request form or a photo on a request; custom roles. Also: only Admins see the request queue, a failed check or a skipped required step never stops a job being closed, and a requester’s picker lists every location and asset.
After the trial, or on a lower planWhat keeps working, what locks and what stays read only
- When the 30-day trial ends, or a canceled plan runs out, the team is on Free unless an Admin chose a plan. Nothing is deleted.
- Recurring work orders and procedures that exist keep working; only new ones stop at Free’s limits.
- The planner, reporting, email notifications and import lock until you move back up. Costs and purchase orders made on Max stay, read only.
- QR labels already printed keep opening their records when scanned; printing labels waits until you move back up.
- With more than 3 Admins and Full users, Full users cannot work in the app until an Admin keeps up to 3 users (the rest become Requesters) or chooses a plan.

If several of those gaps sit in your “this year” column, keep looking. If they do not, the trial is the test, and thirty days is longer than the two weeks above.