Hotel maintenance software from the guest room to the boiler room.
A CMMS for hotels that the front desk and housekeeping can use on day one. They report a room problem in one line, an Admin approves it from one queue, and the quarterly room rotation comes round floor by floor.
The front desk and housekeeping get the Requester role, report a slow drain in one line and see when it is fixed. An Admin, often the chief engineer, approves it into a work order or declines it with a reason.
Build the room visit once: room unit, lamps, drain, door latch, caulk. A tub that drains slowly gets a finding, a photo and a follow-up work order while the engineer is still in the room.
A floor's room air conditioners sit under one asset, each unit named for its room. Room 312's repairs stay on Room 312's unit, and the rest of the floor stays Operational.
In a made-up 120-room hotel, a quarterly rotation is about 2 rooms a weekday. Set a floor's inspections to repeat every three months and work them through the week as rooms come vacant. The next job is created with its filters and its assignee.
In hospitality
Built around what a hotel's engineers look after.
Room visits wait for a vacant room, and the plant behind them never stops.
Guest roomsA room is a location inside its floor, so a slow drain is written against that room, and the room lists the work open there.
Room air conditionersKeep a floor's through-the-wall units as one asset with a unit for each room. A monthly filter route can repeat apart from the quarterly visit, where the maker's manual asks for it.
Kitchen equipmentThe walk-in cooler, the dish machine and the hood each keep their own record, and hood filter cleaning repeats on its own date.
Pool and spa plantA plant check records the water temperature and the filter pressure, and chemistry readings can be steps too. The shortest repeat is daily, so several tests a day take a repeating job for each. Your pool code stays yours.
Boilers and hot waterThe boiler room walk repeats with its checklist. If your water management program calls for flushing taps in empty rooms, that can repeat too.
What the front desk hearsHousekeeping often finds the dripping tap first. They and the front desk report it in one line with the room, and follow it until it is fixed.
It is software that keeps a hotel's maintenance in one place: what the front desk and housekeeping report, the work orders, the inspections that repeat, the rooms and the equipment, the spare parts and the history of what was done. Maintensor covers the engineering side. Reservations and room status stay in your property management system.
Can the front desk and housekeeping report problems?
Yes. Give them the Requester role. They describe the problem in a short form, name the room or the equipment, and follow the request until it is fixed. Only an Admin sees the queue, so a leak or a guest locked out still goes by phone or radio first. Requesters cost nothing in any plan, but cannot run checklists: anyone who runs a room inspection needs a Full user seat.
Can guests send requests themselves?
No. A request needs a signed-in requester, so it comes through your staff. There is no guest link or public form, and a room's QR label opens only for someone signed in.
Does it connect to a property management system?
No. Maintensor has no integrations and no API. The app records the work on a room. Whether the room can be sold stays in your own system, and the app does not know which rooms are vacant, so book the next day's room visits with the front desk.
How does it handle hundreds of rooms?
Rooms are locations inside their floor, so a job can be for one room. Identical room equipment can be kept as units of one asset, each with its own status, and one job can be created for several units in a single step, with a work order for each. A quarterly rotation can be one repeating job per floor, or one per room to keep each room's findings apart. At 120 rooms that is 120 recurring work orders, and the Free plan holds 5.
Does it work on a phone?
Yes, in the browser, so there is nothing to install. On a phone a checklist runs full screen, one step at a time. It needs a network connection: there is no offline mode, so check the signal in the guest rooms and the boiler room first.
Start the trial, add one floor's rooms and give housekeeping the Requester role. Time five room visits, and you will know what rotation your crew can hold.