Hotel room inspection checklist

A hotel room inspection checklist is what an engineer works through in a vacant guest room: door and lock, bathroom, bed and furniture, PTAC, lights, windows, smoke alarm and accessible features. An unsafe Fail keeps the room off sale.

Free, no sign-up. Print it, or type into the Word file.

By MaintensorUpdated

Page 1 of the blank hotel room inspection checklist: the room and visit, then the checks of the entry door and locks, the bathroom, and the sleeping area and furniture, each with a box for OK and Fail and a line for a note.
Page 1 of 3

The checks, area by area

One sheet per room, worked through by an engineer while the room is vacant. Anything that fails is fixed on the spot or gets a work order with a photo. Add the items from your PTAC, lock and safe makers’ manuals, and cut what your rooms do not have.

Entry door, locks and security7 checks

  • Door closing
  • Card lock
  • Deadbolt and security latch
  • Door viewer
  • Connecting door, if any
  • Evacuation plan
  • Closer, frame, strike

Bathroom11 checks

  • Toilet
  • Sink
  • Tub and shower drain
  • Shower valve
  • Shower head
  • Caulk and grout
  • Exhaust fan
  • Towel bars, hooks, shelves
  • GFCI outlet
  • Hair dryer
  • Mirror and vanity

Sleeping area and furniture6 checks

  • Bed frame and headboard
  • Mattress and box spring
  • Chairs, desk, nightstands
  • Carpet and hard floors
  • Closet and safe
  • Walls and ceiling

PTAC or room heating and cooling8 checks

  • Cooling and heating
  • Supply air temperature
  • Filters
  • Noise
  • Condensate
  • Wall sleeve
  • Controls
  • Cord and plug

Electrical and lighting5 checks

  • Lamps and switches
  • Outlets and USB ports
  • TV, remote, clock
  • Cords
  • Room phone

Windows, drapes and balcony4 checks

  • Window locks and stops
  • Glass
  • Drapes and blackout
  • Balcony door and railing

Smoke alarm and life safety4 checks

  • Smoke alarm, stand-alone
  • Smoke detector on the fire alarm system
  • Carbon monoxide alarm, if the room has fuel-burning equipment
  • Sprinkler head, if fitted

Accessible rooms: add these7 checks

  • Grab bars
  • Hand-held shower
  • Shower water temperature
  • Shower or tub seat
  • Door lever, faucets, thermostat
  • Clear floor space
  • Door knock and phone signals, in rooms with communication features
What counts as a fail, check by checkThe full tables: what passes and what fails, area by area.

Entry door, locks and security

Check Pass Fail if
Door closing From fully open, the door swings shut and latches with no push It stops short or does not latch
Card lock Opens on the first try with a guest key; no low battery signal It takes several tries, or signals a low battery
Deadbolt and security latch Both engage fully from inside Either one binds, is loose or is missing
Door viewer Clear view of the corridor Cracked, missing or painted over
Connecting door, if any Locked, and opens from neither side without a key It opens from either side
Evacuation plan On the back of the door, readable, right for this room Missing or for another room
Closer, frame, strike Closer not leaking; frame sound; strike plate tight Oil on the closer, split frame, loose strike

Bathroom

Check Pass Fail if
Toilet Flushes fully, refills and stops; seat tight; no rock at the base Runs on, leaks at the base or tank, rocks
Sink Drains in seconds; no drip at the spout or below; stopper works Standing water, drip, wet cabinet floor
Tub and shower drain Keeps up with the shower running Water rises while the shower runs (slow but keeping up is a Flag)
Shower valve Hot water reaches your set temperature; nothing drips when off Scalding or lukewarm water, drip
Shower head Full, even spray Clogged or spraying sideways
Caulk and grout Continuous, no mold Gaps or dark growth (Flag); water getting behind the wall (Fail)
Exhaust fan Runs quietly and holds a tissue to the grille Silent, noisy, or does not pull
Towel bars, hooks, shelves Tight Loose or pulling out of the wall
GFCI outlet Test cuts the power; Reset restores it Does not trip, or will not reset
Hair dryer Cord and plug intact; runs on both settings Damaged cord or plug
Mirror and vanity Secure, no cracks or sharp edges Loose or cracked

Sleeping area and furniture

Check Pass Fail if
Bed frame and headboard Tight, no wobble, no sharp edges Loose or broken
Mattress and box spring Seams, piping and tags clean Any sign of bed bugs (see below): out of order, call pest control
Chairs, desk, nightstands Stable; drawers run Wobbles, broken drawer or leg
Carpet and hard floors No lifted seams or trip edges A trip edge or tear
Closet and safe Rod and shelf secure; safe opens and locks Loose rod; safe fault
Walls and ceiling No stains A new water stain: find the leak above

For bed bugs, EPA’s how to find bed bugs lists the signs: rusty or reddish stains, dark spots like marker dots, tiny pale eggs and shed skins, and live bugs, around mattress piping, seams and tags, and in cracks in the bed frame and headboard.

PTAC or room heating and cooling

Check Pass Fail if
Cooling and heating Each mode runs on command, and the air changes temperature No change, or one mode dead
Supply air temperature Recorded, and close to last quarter’s reading A big change from last time
Filters Clean, both in place Torn, missing or clogged
Noise Fan and compressor run without rattle or squeal Rattle, squeal or buzz
Condensate Drains outside; wall and floor below are dry Water inside the room
Wall sleeve Sealed to the wall; outdoor grille clear Draft or daylight around the sleeve
Controls Buttons or thermostat respond; display readable Dead controls
Cord and plug Intact and seated; no heat marks Scorching or a damaged cord: Fail and unplug

Electrical and lighting

Check Pass Fail if
Lamps and switches Every lamp lights from its switch Dead or flickering (replace the lamp on the spot)
Outlets and USB ports Cover plates on; plugs hold; ports charge Loose outlet, scorch marks, missing plate
TV, remote, clock Work Not working
Cords Not pinched under furniture or across walkways Pinched or damaged
Room phone Dial tone; reaches the front desk Dead

Windows, drapes and balcony

Check Pass Fail if
Window locks and stops Lock engages; any opening limiter stops the window where it should Lock or stop broken or missing
Glass Intact; no fog between double panes Cracked glass (Fail); fog between panes (Flag)
Drapes and blackout Run end to end; panels overlap Off the track; light gap at the overlap
Balcony door and railing Door locks; railing solid Loose railing: out of order

Smoke alarm and life safety

Check Pass Fail if
Smoke alarm, stand-alone Sounds when tested Silent, chirping, or older than 10 years from the date on it
Smoke detector on the fire alarm system Tested only under your fire alarm contractor’s procedure Damaged, covered or missing
Carbon monoxide alarm, if the room has fuel-burning equipment Sounds when tested Silent or past its end-of-life date
Sprinkler head, if fitted Nothing hung on it; not painted or damaged Anything hung on it, paint or damage: call your sprinkler contractor

The US Fire Administration’s smoke alarm guidance, written for homes, says to replace alarms 10 years from the manufacture date printed on them.

Accessible rooms: add these

Check Pass Fail if
Grab bars Tight; do not turn in their fittings Loose or turning
Hand-held shower Works both mounted and in the hand; hose intact Hose split, holder broken
Shower water temperature No hotter than 120°F (49°C) at the spray unit Hotter
Shower or tub seat Folds, locks and holds Loose or will not lock
Door lever, faucets, thermostat Work with one hand, no tight grasping or twisting A knob has replaced a lever; a control is stiff
Clear floor space Turning space and the space beside the bed are clear Furniture has crept into them
Door knock and phone signals, in rooms with communication features Light up when tested No signal

What Pass, Flag and Fail mean

The line between Flag and Fail is the guest. A tub that drains in a minute is a Flag; a tub that fills while the shower runs is a Fail.

PassWorks as it should, nothing to do.
FlagWorks and is safe now, but will need work: worn caulk, a slow drain, a sticky drawer. A planned work order; the room stays on sale.
FailBroken, unsafe, or something a guest would complain about. Fixed now or a work order today; out of order if unsafe or unusable.

The printed form has boxes for OK and Fail only: for a Flag, tick OK and write the work it will need on the note line.

Before you start

Who
An engineer, in a vacant room, as part of the room PM rotation. Housekeeping’s daily check is about clean; this one is about what works. Between visits, housekeepers report faults as they find them.
How often
Each room once a quarter is a common rotation; the hotel maintenance guide works one out for 120 rooms. Run it again after a renovation, a flood or a long closure, before the room is sold again.
Panel detectors
Do not press the test button on a detector that reports to the building’s fire alarm panel unless your contractor’s procedure says so: it can send an alarm.

When a check fails

Fix it on the spot if it takes minutes and the part is on the cart. Otherwise write a work order with what was found and a photo.

If it is unsafe, or a guest would not accept the room as it is, tell the front desk to take the room out of order, and tell them when it is back.

This list is a starting point. It does not replace your fire code, your fire alarm contractor or the training your engineers need.

What federal law asks

Two federal rules touch a room inspection: one sets the smoke detectors a hotel needs to be on FEMA’s list for federal travelers, the other asks that accessible features be kept working. Your state or local fire code sets what your building needs and how detectors are tested.

What the rules sayThe Hotel and Motel Fire Safety Act, the ADA rules and Standards, and Canada.
  • Smoke detectors. Under the federal Hotel and Motel Fire Safety Act, to be on FEMA’s National Master List (where federal employees on travel are expected to stay) a property needs hard-wired, single-station smoke detectors in each guest room, and an automatic sprinkler system unless it is three stories or lower (15 U.S.C. 2225).
  • Accessible features. A public accommodation must keep the features required for accessibility in working condition, though isolated or temporary interruptions for repairs are allowed (28 CFR 36.211).
  • What those features are. The 2010 ADA Standards set them, among them operable parts usable with one hand and no more than 5 pounds of force (309.4), grab bars that do not rotate in their fittings (609.6), hand-held shower spray units delivering water at 120°F (49°C) maximum (608.6), and visible notification devices for door knocks and phone calls in rooms with communication features (806.3.2).
  • Canada. Provinces have their own building, fire and accessibility rules.

This is information, not legal advice: check the codes that apply to your property.

The room inspection in Maintensor, repeating every 3 months

Build the checklist once as a procedure, attach it to the room PM work order and set that to repeat every 3 months. There is no ready-made library, so it is typed in from this page. The hospitality page shows a room inspection like this on a demo hotel.

  • The steps. A Heading step for each area, an Inspection check for each row, a Number step for the supply air temperature, a Photo step for anything to repair and a Signature step at the end. Split it into a standard room and an accessible room version if that suits you.
  • A Fail. The engineer cannot move on until a note and a photo are added, and is then offered a follow-up work order and, if the work order is on the room’s PTAC unit, Mark asset down.
  • A Flag. Once the work order is done, its Checklist tab counts the steps flagged or failed and offers a follow-up work order from those findings, so a Flag still turns into planned work. Required steps left open are listed at completion and written to the history, one guard against pencil whipping.
Run mode on a failed check: Fail is chosen for the pulley alignment, the finding is written, a photo is asked for, and a follow-up work order is offered.
Run mode on a failed check: the finding is written, a photo is asked for, and a follow-up work order is offered.

Only Full users and Admins answer checklists. Housekeepers who are Requesters report what they find as requests instead, one line per problem with the room picked under Where is it?; a request process people will use covers the rest. For an apartment turnover rather than a hotel room, the make-ready checklist fits better.

Questions

What people also ask.

More in the checklists, or see the whole product on the features page.

How often should hotel rooms be inspected?

Housekeeping looks at every occupied room each day for cleanliness, and a supervisor usually inspects some rooms after cleaning. The engineering inspection on this page is a fuller, slower check of what breaks, and once a quarter per room is a common interval. Items with their own makers' intervals, such as PTAC filters, may need visits in between.

What is the difference between a housekeeping inspection and a maintenance room inspection?

A housekeeping inspection asks whether the room is clean and ready: beds made, bathroom spotless, supplies stocked. A maintenance inspection asks whether everything in it works and is safe: the lock, the PTAC, the drains, the smoke alarm, the grab bars. Housekeepers report what they notice; engineers test it.

What should happen when a hotel room fails inspection?

Fix it on the spot if it takes a few minutes and the part is on the cart. Otherwise write a work order with what was found and a photo. If the fault is unsafe or a guest would not accept the room, tell the front desk to put it out of order, and tell them again when it is fixed.

Can I print this hotel room inspection checklist?

Yes. The form at the top of this page comes as a PDF to print and a Word file to change. In the Word file, cut the sections your rooms do not have, add the items from your PTAC and lock makers' manuals, and put the Pass, Flag and Fail meanings at the top so every engineer reads them the same way.

Run one hotel's maintenance through it.

Start the trial, add the rooms, the pool plant and the kitchen, invite the front desk and housekeeping as requesters, free on every plan, and set each check to repeat.

30-day free trial. No credit card.