Free maintenance tools.

Planners, worksheets and calculators for the maintenance desk. No sign-up, and nothing you type leaves your browser.

Planners and worksheets

Fill one in, then print it or take a file away.

  • Inspection calendar

    Tick what your building has and get the usual fire and safety checks for ten common items by month, for the United States or Canada.

  • Root cause worksheet

    Work back from a failure with the 5 whys and a fishbone diagram, write the actions with an owner and a date, and print it on one page.

  • Maintenance schedule maker

    Type or paste what needs doing and how often, and get a year plan to print, a calendar file and a CSV.

  • QR code labels for equipment, each with its name, location and asset code, as they will print on the first sheet

    QR code label maker

    Paste your asset codes and print a QR code label for each, on standard label sheets or a label printer.

Calculators

Type your numbers and read the answer, with the sum shown.

Reliability

  • MTBF calculator

    Mean time between failures

    Operating hours ÷ failures

  • MTTR calculator

    Mean time to repair

    Hours down ÷ failures

  • MTTF calculator

    Mean time to failure, for parts you replace

    Total hours ÷ failures

  • OEE calculator

    Overall equipment effectiveness

    Availability × performance × quality

  • First-time fix rate calculator

    Repairs that held on the first attempt

    Fixed first time ÷ repairs closed

Planning and crew

Stock, cost and safety

Try it on the work you have this week.

Start the trial, add one asset and write one work order. By the end of the afternoon you will know whether it fits.

30-day free trial. No credit card.