QR code label maker

Paste your asset codes and print a QR code label for each, on standard label sheets or a label printer.

Free, no sign-up. Nothing you type leaves your browser.

See it with six pumps, fans and compressors.

The codes

One label a line: the code, then a name and a second line if you want them, separated by tabs or commas. Cells copied from a spreadsheet paste straight in. Up to 1,000 labels.

No labels yet.

What the code holds

A phone's camera shows what a QR code holds: the code as text, or a web address to open. The labels Maintensor prints itself (on Pro and Max) open the record in the app for an Admin or a Full user who signs in.

What the code holds

The sheet

The sheet

The first sheet

Each label as it will print, on the first sheet.

Type or paste a code to see the labels.

Nothing is saved, so print before you close the page. In the print window, set the scale to 100% or Actual size, never Fit to page, so each label lands on its label. Printing is a desk task.

What to put in the code

Keep codes short and unique
PUMP-01 beats "the pump by the north door". A short code makes larger squares, which read from further away and survive a scuff.
Use the code you already have
If the assets carry a number in a spreadsheet or another system, print that, so a label and a record match without a second list.
A code or a web address
A plain code shows as text when scanned. A web address opens a page. If that address could change, a plain code lasts longer.

Every code here is made at error correction level M, which, as the QR code's maker puts it, can restore about 15% of the code and is the level most often chosen (DENSO WAVE, QRcode.com). A label with a small scuff or a smear of grease still reads.

Printing labels that line up

Print at 100%
The print window's Fit to page shrinks the sheet and moves every label. Choose 100% or Actual size.
Try plain paper first
Hold one printed sheet against a label sheet up to the light. If the labels sit on their labels, load the label sheets.
Match the labels to the printer
Sheets are made for laser printers or for inkjet printers, and the wrong kind smears or peels.
For a label printer
Choose it in the print window, along with its 1⅛ × 3½ in label. Each label prints on a page of its own.

Where to stick them

Put the label in the same place on every asset of a kind, at a height a person can scan without reaching, and away from hot surfaces, spray and the spot people wipe. A label on a guard that comes off for service leaves with the guard.

The example, read throughSix labels for a made-up plant.

"Show an example" fills in six labels: two pumps in the boiler room, a supply fan and an exhaust fan on the roof, an air compressor and a conveyor. Each line is the code, the name and where it stands:

PUMP-01, Feed pump, Boiler room

On Small the six take the first two rows of one sheet, and the rest of the sheet stays blank. The labels always start at the sheet's first label, so start each batch on a fresh sheet rather than one already used. Each label shows the name in bold, where it is under the name, and the code at the foot, beside a QR code that holds PUMP-01.

How this differs from labels in Maintensor

A phone's camera shows what these codes hold. In Maintensor, on Pro and Max, every asset, part and location has a QR label to print, on a Letter sheet of 30 or of 12, or on a label printer: the same sizes as Small, Square and Label printer here. The camera opens the label's link and the person signs in. Admins and Full users get the record, and a requester who scans an asset or a location gets the report form with it filled in. The app has no scanner of its own; the phone's camera does it.

Questions

Is this QR label maker free?

Yes. It needs no sign-up and nothing to install, and it puts no mark of ours on your labels. It runs in your browser: the codes you paste are sent nowhere and are gone when you close the page.

Which label sheets does it print on?

Four: Small, 1 × 2⅝ in, 30 to a Letter sheet, the size of Avery 5160; Square, 2 × 2 in, 12 to a Letter sheet; a label printer's 1⅛ × 3½ in label, one a page; and A4, 63.5 × 38.1 mm, 21 to a sheet, the size of Avery L7160. Any sheet of the same size works.

Do people need an app to scan the labels?

Most phones read a QR code with the camera they already have: point it at the label and tap what appears. A code that holds plain text shows the text; one that holds a web address offers to open it.

Why do my labels not line up with the sheet?

Almost always the print scale. In the print window, set it to 100% or Actual size and turn off Fit to page. Then print one sheet on plain paper and hold it against a label sheet up to the light before you use the labels.

Can I print more than 1,000 labels?

One go makes up to 1,000, which is 34 sheets of Small. For more, print the first 1,000, then paste the next part of your list.

More free tools

All tools
  • Maintenance schedule maker

    A year plan from your list of jobs

    Year plan to print, calendar file, CSV

  • Inspection calendar

    Fire and safety checks by month

    Year plan to print, calendar file, CSV

  • Root cause worksheet

    The 5 whys and a fishbone on one page

    One page to print, or save as a PDF

Let a scan open the asset itself.

Start the trial: in Maintensor, on Pro and Max, every asset, part and location has a QR label to print. An Admin or a Full user who scans one and signs in gets its record; a requester gets the report form.

30-day free trial. No credit card.