Maintenance schedule maker

Type or paste what needs doing and how often, and get a year plan to print, a calendar file and a CSV.

Free, no sign-up. Nothing you type leaves your browser.

See it filled in for a small plant's six assets.

What needs doing

One row for each asset or job: how often, and when it is next due. Leave the date blank to start with the plan's first month. For anything less often than once a year, give the date it was last done.

The year plan

How many times each one falls due in each month, and the total for the month at the foot.

Add a row with how often it is done to see the plan.

Nothing is saved, so print or download before you close the page. Printing and the calendar file work best on a computer.

How to read the plan for workload

The total at the foot of each month is that month's load. A month with far more than its neighbors is where work starts to slip.

Spread what comes round less often
If three quarterly jobs share a month, move one to the next month and one to the month after. Give each yearly job a quiet month.
Count time as well as checks
A 10-minute look and a day-long service each count as one. The schedule template has a column for how long each takes.
Expect weekly jobs to wobble
A weekly job falls 4 or 5 times a month, depending on how the weeks fall. A month with five is not a slip.

The example, read through

"Show an example" fills the list with six assets of a made-up plant. Most months hold 6 or 7 checks, and no month is far above the rest, which is the point of spreading the dates.

The six assetsWhat each one shows about how the plan works.
  • Two air compressors, each serviced monthly, one on the 5th and one on the 19th, so they never take the same day.
  • A conveyor, walked every week from the 2nd. That puts 4 or 5 checks in every month, depending on how the weeks fall.
  • A forklift, serviced every 3 months from the second month, so it shows in the plan four times.
  • A boiler, serviced once a year in the fourth month.
  • The floor line markings in the warehouse, repainted every 3 years and last done a year before the plan starts. They are not due in these 12 months, so they are listed under the plan with their next date instead of in it.

Read the totals at the foot: the conveyor's 4 or 5 and the two compressors make 6 or 7. Every third month the forklift adds one, and the boiler adds one in its month.

What it does not do

Run hours or miles
It schedules by the calendar only. A job due after so many hours, miles or cycles needs those readings, and this page never sees them.
Remember
Nothing is saved in the page or anywhere else. Print the plan or download the files before you close it.
Send reminders
The calendar file puts each job in your own calendar app, and that app does any reminding.
About the filesThe calendar file, the CSV, and a job due on the 31st.

The calendar file follows the iCalendar standard, RFC 5545: one repeating all-day event for each row. The CSV has one line for each date a job falls due in the 12 months, with the date written out, such as Nov 3, 2026, and a cell that starts with =, +, - or @ is written so a spreadsheet does not run it as a formula.

A job due on the 29th, 30th or 31st falls on the last day of a month that is shorter. The plan and the CSV count it that way, and the calendar file asks for the same dates with a standard repeat rule. Check the first few dates after you import it.

Questions

Is this maintenance schedule maker free?

Yes. It needs no sign-up and nothing to install. It runs in your browser: what you type is sent nowhere and is gone when you close the page, so print the plan or download the files first.

How do I get the schedule into my calendar?

Press Download calendar file, then import the file in your calendar app. In Google Calendar on a computer that is Settings, then Import and export. Each row becomes one repeating all-day event, so the calendar shows every future date, not only the next 12 months.

Can I paste my asset list from Excel?

Yes. Copy the cells, press Paste from a spreadsheet and paste them into the box. The columns are the asset, then the location, how often and the next due date if you have them. A header row such as Asset, Location, How often is read and skipped, and blank lines are left out.

Can it schedule by run hours or mileage?

No. It works by the calendar only: every week, every 3 months, every year. A job that comes due after so many hours or miles needs those readings, and this page never sees them.

What happens to a job on the 31st in a shorter month?

It falls on that month's last day: Feb 28, or Feb 29 in a leap year, then back to the 31st in March. The year plan, the CSV and the calendar file all count it the same way.

More free tools

All tools
  • Inspection calendar

    Fire and safety checks by month

    Year plan to print, calendar file, CSV

  • PM compliance calculator

    Preventive jobs done on time

    Done on time รท jobs due

  • QR code labels for equipment, each with its name, location and asset code, as they will print on the first sheet

    QR code label maker

    A label for each asset code, ready to print

    Letter and A4 sheets, or a label printer

Let the next date come round by itself.

Start the trial and turn each row into preventive maintenance in the app: it repeats on the calendar, and completing one job creates the next.

30-day free trial. No credit card.