Equipment maintenance software that knows every machine and where it stands.

Every machine has one record, under the place it stands: what it is, the work open on it, when it was last serviced, and what it has taken in parts this year.

Equipment maintenance software in Maintensor: a conveyor's record, with its open work, last service, this year's work orders and parts cost, its nameplate, location and vendor.

What it does

One record for each machine. One place for each record.

The list

Every machine, under the place it stands.

The assets list is grouped by location and shows the work each machine has open. Two views cut it down to what is not running: Down and In maintenance.

The assets list grouped by location: a boiler, a conveyor with four jobs open, a CNC machine with ten units of which one is down, a dust collector, a mixer with an overdue job and an air handler.

Locations

Places inside places.

A location can sit inside another: a site, a building, a line, a room. Each one lists the assets in it and the work open there, and can carry its own address.

The locations list: the plant at the top, three areas under it, and under Building services a boiler room, a lab and two roof wings with their asset and open work counts.

Units

Ten identical machines are one asset.

Keep identical machines as units of one asset. Each unit has its own status and its own last service, and one job can be made for several units at once, with a work order for each.

The Units tab of a CNC machine: ten bays, each with its last service date, one marked Down and one In maintenance.

Its work

Open a machine and see its work.

The record lists the open jobs and the finished ones, with what each took in parts. When the same part has been listed on three or more of a machine's work orders this year, the record says so and suggests checking for a recurring fault.

A conveyor's work orders: four open with their due dates, a note that a V-belt has been used on it 10 times this year, and the latest finished jobs with their parts cost.

Its parts

Know which parts fit which machine.

Link parts to the machines they are used on. The record shows each one with what is on hand across all storerooms, and marks a part that is below its reorder level. The next service does not start with a search for the right belt.

The parts a conveyor uses: bearings and grease in stock, and a V-belt marked Below reorder level with 7 on hand.

Questions

Assets and locations, in plain answers.

More on the whole product on the features page. The free QR label maker prints labels from your own list, on the same sheets.

What is equipment maintenance software?

It is software that keeps a record of every machine you maintain and of the work done on it: what it is, where it is, what is open, what was done and when. In Maintensor that record is the asset, and it is part of a CMMS that also covers work orders, preventive maintenance, parts and reporting.

What does an asset record hold?

A name, a location, a type, the manufacturer, model and serial number, a description and a status: Operational, In maintenance, Down or Retired. It also shows the open work, the last service, this year's work orders and their parts cost, the parts the machine uses and the vendors linked to it.

Can I group identical machines?

Yes. An asset can be created with 2 to 100 units, such as one CNC machine asset with ten bays, and more units can be added later. Each unit has its own status and its own work orders. The asset that holds them has no status of its own.

How do locations work?

A location can sit inside another: a site, a building, a floor, a room. Every asset is in one location. A location lists its assets and its open work, and can have its own address.

Can I import my assets and locations from a spreadsheet?

Yes, on Pro and Max. An Admin selects an Excel or CSV file of up to 10 MB and 5,000 rows, and Maintensor matches its columns to the asset's fields, which you check and change. An asset needs a name and a location, and a location that is not in the app yet can be created from the file. Every row is shown before anything is saved, and a row for an asset that is already there is skipped unless you choose to update it.

Does it track downtime?

Yes. Mark an asset, or one unit of it, Down or In maintenance with a reason, and the change is kept in its history. The time until it is back to Operational is its downtime: unplanned while it is Down, planned while it is In maintenance. On Pro and Max, Reporting adds it up, with each asset's MTBF and the assets with the most unplanned downtime.

Does it print QR code labels?

Yes, on Pro and Max. Press Print label on an asset, or Print labels on the Assets list to print many at once, and choose a size: Small (30 to a Letter sheet, like Avery 5160), Square (12 to a sheet) or Label printer. A phone's camera opens the label, and the person signs in: Admins and Full users land on the asset, and a requester gets Report a problem with the asset and its location filled in. An asset that holds units gets no label; each unit gets its own. There is no scanner inside the app.

Add your first machine today.

Start the trial, add one location and the machine in it, and write its first work order.

30-day free trial. No credit card.