Preventive maintenance checklists your crew follows step by step.
Write a procedure once, from fourteen kinds of step. Attach it to any work order, and the technician follows it one step at a time, at a desk or on a phone.
Twelve take an answer: a checkbox, text, a number, an amount, one choice or several, yes or no, an inspection check, a photo, a file, a signature and a date. The other two, a heading and an instruction, keep a long procedure in order.
On the job
A failed check does not get lost.
Run mode shows one step to a screen. When a check fails, the app asks for a finding and a photo before the next step, and offers a follow-up work order on the spot, with the choice to mark the asset down.
The builder
Write it the way you would say it.
Type the step, pick its type, and mark it required if the job is not finished without it. Drag steps into order and group them under headings. On a wide screen the builder shows what the technician will see beside what you write.
Versions
Improve a checklist without changing a job half way through.
Publishing makes a new version. A work order keeps the version it was given and says Update available when a newer one exists. Taking the update is a choice, and it removes the answers to steps that were removed or changed to another type.
History
Every version is on the record.
A procedure's history lists when it was created and each version that was published, and by whom. Attach it to a repeating job and every new one is created with the version that is current that day.
How it fits
A procedure is written once and used everywhere.
The same checklist serves a breakdown today and the monthly service next week.
It is the list of steps a routine service takes, in order: what to isolate, what to inspect, what to measure and what to record. It makes the job the same whoever does it. In Maintensor a checklist is a procedure: you build it once and attach it to the work orders that need it.
What kinds of step can a checklist have?
Fourteen. Checkbox, text, number, amount, multiple choice, checklist, yes or no or not applicable, inspection check, photo, file, signature and date take an answer. Heading and instruction lay the procedure out. A procedure holds up to 350 steps and headings.
Can a step be required?
Yes, any step that takes an answer. Required steps do not block the job: a work order can be completed with exceptions, and the app lists the required steps left open at sign-off and writes them to the work order's history.
What happens when a check fails?
An inspection check is answered Pass, Flag or Fail. On Fail, run mode asks for a note and a photo before moving on, and offers to create a follow-up work order with a priority and to mark the asset down.
What happens to open work orders when I change a procedure?
Nothing, until someone chooses. A work order keeps the version it was given and shows Update available. Updating applies the new version and deletes the answers to steps that were removed or changed to another type. The other answers are kept.
Can technicians run a checklist on a phone?
Yes, in the browser, with nothing to install. Run mode shows one step at a time with the buttons at the bottom of the screen. It needs a network connection: Maintensor has no offline mode.