Key points
- Preventive maintenance is work done because it is due, not because something broke.
- Most small teams schedule it by the calendar: every day, week, month or year.
- Not everything needs it: run cheap, non-critical items to failure, on purpose.
- Start with ten to twenty assets that stop work or can hurt someone, not the whole site.
What preventive maintenance means
Preventive maintenance (PM) is work you do on equipment because it is due, not because it broke. Most of it is one of six things:
The official definition
The U.S. Department of Energy’s O&M Best Practices Guide (Release 3.0, 2010, section 5.3) calls it “actions performed on a time- or machine-run-based schedule that detect, preclude, or mitigate degradation of a component or system”.
In the shop, each job is also called a PM. When one comes due, it becomes a work order like any other. The whole set of jobs is a preventive maintenance program.

Preventive vs reactive maintenance
Preventive work happens on a schedule, before a failure. Reactive maintenance, also called breakdown maintenance, happens after one. Every team does some reactive work: the question is how much, and whether you chose it. Types of maintenance sets out all eleven types and how they relate.
| Reactive | Preventive | |
|---|---|---|
| When the work happens | After a failure | On a schedule, before a failure |
| Labor | Interrupted days, often overtime | Planned into the week |
| Parts | Bought in a hurry, or a big shelf of spares | Known ahead and ordered in time |
| Side damage | A failed part can take others with it | Wear is caught while it is one part |
| What it costs | Little until something breaks, then a lot at once | Steady labor, including visits that find nothing |
As much as 12% to 18%
The U.S. Department of Energy’s O&M Best Practices Guide says studies put a preventive program’s savings at as much as 12% to 18% on average over a purely reactive one. It is just as plain about the downsides: preventive work takes a lot of labor, some of it turns out to be unneeded, and catastrophic failures still happen.
When running to failure is the right call
Not everything deserves a PM. The same guide (table 5.5.1, adapted from NASA) puts reactive work on small parts, non-critical equipment, equipment unlikely to fail and redundant systems. Run an item to failure only when all three answers point that way:
An office light fixture (not the emergency lights) or the break room microwave usually passes. A standby only counts if it works: when the duty pump runs to failure, the standby pump needs a PM.
Types of preventive maintenance: by the calendar, by use, by condition
Preventive work comes due in one of four ways. The last two are often counted as strategies of their own, and the types guide shows where each sits among the rest.
A usage interval can sit on a calendar when equipment runs steadily: the schedule guide works one out. Maintensor schedules by the calendar only.
Preventive maintenance examples by setting
Ten jobs in a plant, a warehouse, a building, a fleet shop and a hotel show what preventive work looks like. Every interval is a starting point for illustration: your equipment’s manual and your own history set the real ones.
Ten jobs, by settingPlant, warehouse, building, fleet shop and hotel: the task and how often
| Setting | Equipment | Task | How often |
|---|---|---|---|
| Plant | Air compressor | Check oil, drain the receiver, listen for leaks | Daily |
| Plant | Conveyor | Walk the line: belt tracking and tension, rollers, guards, pull cords | Weekly |
| Warehouse | Forklifts | Examination before use | Every shift, at least daily |
| Warehouse | Dock doors and levelers | Lubricate; check springs, cables, seals, hydraulics | Quarterly |
| Building | Rooftop units | Filters, belts, condensate drains | Quarterly |
| Building | Boiler | Shut down, clean and inspect, plus any inspection your state or province requires | Yearly |
| Fleet shop | Trucks | PM service: oil, filters, grease, brakes, tires, lights | Every 3 months (from miles) |
| Fleet shop | Trucks | Periodic inspection | Every 12 months |
| Hotel | Guest rooms | Fixtures, caulk, lock and door closer, smoke alarm | Each room quarterly |
| Hotel | Kitchen | Walk-in cooler: condenser coil, door gaskets | Monthly |
Where the rules set the interval
In the US, OSHA requires forklifts to be examined before being placed in service, at least daily, and after each shift where they run around the clock (29 CFR 1910.178(q)(7)).
Also in the US, each commercial motor vehicle must pass a periodic inspection at least once every 12 months (49 CFR 396.17), and carriers must keep a means of showing when each inspection and service is due (396.3). In Canada, National Safety Code Standard 11 covers maintenance and periodic inspection, through each province’s and territory’s rules.
Benefits and costs of preventive maintenance
Preventive maintenance gives a small crew fewer surprise stops, days it can plan, longer equipment life, safety devices tested on a schedule and a dated record of each job.
It costs labor every time, including visits that find nothing wrong. It can also cause faults, because opening a machine can leave it worse (a pinched gasket, a guard left off). A part that fails at random fails whatever the calendar says, which is why preventive work suits equipment that wears out.
How a small team starts preventive maintenance
Start with a short list the crew will keep up, not every asset on day one.
- Pick the assets. Start with what stops production, can hurt someone, or broke twice this year: ten to twenty assets.
- Pick the tasks. Start from the manual and a checklist, then ask what check would have caught your last ten breakdowns.
- Set how often. Use the manual’s interval, put tasks on one asset with the same interval into one job so the panel comes off once, and lay out the dates across the year.
- Decide who. Every job gets a named person or team and an estimate, so it has real time in somebody’s week.
- Record it. A PM nobody recorded cannot be proved later, so use a checklist with readings and a sign-off.
A schedule the crew finishes every month is worth more than a complete one that is always late. The program guide counts the hours for a rollout. When jobs start slipping off the spreadsheet, a CMMS earns its place.
How to tell it is working
Two counts from your work orders tell you most of it, and the KPI guide has the rest.
- Preventive share: preventive work orders divided by all work orders. It should rise as breakdowns fall. Adding PMs raises it without fixing anything, so read it next to the second count.
- PM compliance: PMs done by their due date divided by all PMs due. When it drops, the schedule is bigger than the crew or breakdowns are eating the week.
Then ask whether the assets with PMs are breaking down less. If a machine keeps failing the same way, the tasks are wrong, not only the interval.
Four mistakes that sink a PM program
Preventive maintenance in Maintensor: repeats, checklists and counts
In Maintensor, a preventive job is a work order with a repeat on it. The preventive maintenance software page shows the whole feature.
- The schedule. A job repeats daily, weekly on the weekdays you pick, monthly on a date or a weekday, or yearly, and can skip, as in every 3 months.
- The next job. When a job is completed, the next one is created with the same details and a blank checklist. If it was late, the next is due on the first date of its schedule after today, so the schedule does not slide.
- The checklist. A failed inspection check asks for a note and a photo, and offers a follow-up work order and to mark the asset down.
- Counting it. Set the work type to Preventive, because a new work order starts as Reactive. On Pro and Max, Reporting shows admins the preventive ratio and how much was done on time.
What it does not do
There are no meter readings, and nothing comes due from hours, miles or cycles. Nothing is condition-based or predictive, and no sensors connect to it. One work order of a series is open at a time, so there is no calendar of the year ahead. It is a web app on a desk and a phone, with no offline mode.
The Free plan includes 5 recurring work orders; Pro and Max have no such limit. A record shows what was done and when; it certifies nothing.