What is preventive maintenance?

Preventive maintenance is maintenance done on a schedule before equipment fails: inspecting, cleaning, lubricating, adjusting and replacing worn parts. It is the opposite of reactive maintenance, where work starts only after something breaks.

By MaintensorUpdated 8 min read

Key points

  • Preventive maintenance is work done because it is due, not because something broke.
  • Most small teams schedule it by the calendar: every day, week, month or year.
  • Not everything needs it: run cheap, non-critical items to failure, on purpose.
  • Start with ten to twenty assets that stop work or can hurt someone, not the whole site.

What preventive maintenance means

Preventive maintenance (PM) is work you do on equipment because it is due, not because it broke. Most of it is one of six things:

InspectCleanLubricateAdjustReplace wear partsTest safety devices

The official definition

The U.S. Department of Energy’s O&M Best Practices Guide (Release 3.0, 2010, section 5.3) calls it “actions performed on a time- or machine-run-based schedule that detect, preclude, or mitigate degradation of a component or system”.

In the shop, each job is also called a PM. When one comes due, it becomes a work order like any other. The whole set of jobs is a preventive maintenance program.

A quarterly check's details: due on Friday, a repeat every 3 months on the 16th with the next due date in January, a 1 hour 30 minute estimate, and the dock leveler it is for.
A quarterly check: due on Friday, repeating every 3 months on the 16th, with its estimate and the dock leveler it is for.

Preventive vs reactive maintenance

Preventive work happens on a schedule, before a failure. Reactive maintenance, also called breakdown maintenance, happens after one. Every team does some reactive work: the question is how much, and whether you chose it. Types of maintenance sets out all eleven types and how they relate.

Reactive Preventive
When the work happens After a failure On a schedule, before a failure
Labor Interrupted days, often overtime Planned into the week
Parts Bought in a hurry, or a big shelf of spares Known ahead and ordered in time
Side damage A failed part can take others with it Wear is caught while it is one part
What it costs Little until something breaks, then a lot at once Steady labor, including visits that find nothing

As much as 12% to 18%

The U.S. Department of Energy’s O&M Best Practices Guide says studies put a preventive program’s savings at as much as 12% to 18% on average over a purely reactive one. It is just as plain about the downsides: preventive work takes a lot of labor, some of it turns out to be unneeded, and catastrophic failures still happen.

When running to failure is the right call

Not everything deserves a PM. The same guide (table 5.5.1, adapted from NASA) puts reactive work on small parts, non-critical equipment, equipment unlikely to fail and redundant systems. Run an item to failure only when all three answers point that way:

Question 1If it fails, does work stop or can anyone get hurt?Yes: it needs a PM.
Question 2Will it damage something else when it goes? A seized bearing can score a shaft.Yes: it needs a PM.
Question 3Can you replace it quickly, from stock, for less than its PMs would cost over its life?Yes: running it to failure may be the cheaper choice.

An office light fixture (not the emergency lights) or the break room microwave usually passes. A standby only counts if it works: when the duty pump runs to failure, the standby pump needs a PM.

Types of preventive maintenance: by the calendar, by use, by condition

Preventive work comes due in one of four ways. The last two are often counted as strategies of their own, and the types guide shows where each sits among the rest.

Time-based (calendar)
Due every day, week, month or year. It needs nothing but a calendar, so most small teams start here.
Usage-based (meter)
Due after a number of hours, miles or cycles. It matches wear more closely, but someone has to read the meters.
Condition-based
Done when an inspection or a reading shows it is needed: a belt shows cracks, a bearing runs hot.
Predictive
Vibration, oil and infrared readings flag a failure before it happens. See predictive maintenance.

A usage interval can sit on a calendar when equipment runs steadily: the schedule guide works one out. Maintensor schedules by the calendar only.

Preventive maintenance examples by setting

Ten jobs in a plant, a warehouse, a building, a fleet shop and a hotel show what preventive work looks like. Every interval is a starting point for illustration: your equipment’s manual and your own history set the real ones.

Ten jobs, by settingPlant, warehouse, building, fleet shop and hotel: the task and how often
Setting Equipment Task How often
Plant Air compressor Check oil, drain the receiver, listen for leaks Daily
Plant Conveyor Walk the line: belt tracking and tension, rollers, guards, pull cords Weekly
Warehouse Forklifts Examination before use Every shift, at least daily
Warehouse Dock doors and levelers Lubricate; check springs, cables, seals, hydraulics Quarterly
Building Rooftop units Filters, belts, condensate drains Quarterly
Building Boiler Shut down, clean and inspect, plus any inspection your state or province requires Yearly
Fleet shop Trucks PM service: oil, filters, grease, brakes, tires, lights Every 3 months (from miles)
Fleet shop Trucks Periodic inspection Every 12 months
Hotel Guest rooms Fixtures, caulk, lock and door closer, smoke alarm Each room quarterly
Hotel Kitchen Walk-in cooler: condenser coil, door gaskets Monthly

Where the rules set the interval

In the US, OSHA requires forklifts to be examined before being placed in service, at least daily, and after each shift where they run around the clock (29 CFR 1910.178(q)(7)).

Also in the US, each commercial motor vehicle must pass a periodic inspection at least once every 12 months (49 CFR 396.17), and carriers must keep a means of showing when each inspection and service is due (396.3). In Canada, National Safety Code Standard 11 covers maintenance and periodic inspection, through each province’s and territory’s rules.

Benefits and costs of preventive maintenance

Preventive maintenance gives a small crew fewer surprise stops, days it can plan, longer equipment life, safety devices tested on a schedule and a dated record of each job.

It costs labor every time, including visits that find nothing wrong. It can also cause faults, because opening a machine can leave it worse (a pinched gasket, a guard left off). A part that fails at random fails whatever the calendar says, which is why preventive work suits equipment that wears out.

How a small team starts preventive maintenance

Start with a short list the crew will keep up, not every asset on day one.

  1. Pick the assets. Start with what stops production, can hurt someone, or broke twice this year: ten to twenty assets.
  2. Pick the tasks. Start from the manual and a checklist, then ask what check would have caught your last ten breakdowns.
  3. Set how often. Use the manual’s interval, put tasks on one asset with the same interval into one job so the panel comes off once, and lay out the dates across the year.
  4. Decide who. Every job gets a named person or team and an estimate, so it has real time in somebody’s week.
  5. Record it. A PM nobody recorded cannot be proved later, so use a checklist with readings and a sign-off.

A schedule the crew finishes every month is worth more than a complete one that is always late. The program guide counts the hours for a rollout. When jobs start slipping off the spreadsheet, a CMMS earns its place.

How to tell it is working

Two counts from your work orders tell you most of it, and the KPI guide has the rest.

  • Preventive share: preventive work orders divided by all work orders. It should rise as breakdowns fall. Adding PMs raises it without fixing anything, so read it next to the second count.
  • PM compliance: PMs done by their due date divided by all PMs due. When it drops, the schedule is bigger than the crew or breakdowns are eating the week.

Then ask whether the assets with PMs are breaking down less. If a machine keeps failing the same way, the tasks are wrong, not only the interval.

Four mistakes that sink a PM program

Too many PMs
A schedule bigger than the crew makes everything late, and then nobody trusts it.
PMs nobody does
A job with no name or no time loses to the first breakdown. A checklist ticked without the work done is worse than no PM, and readings that never change are the tell.
No checklist
“Service RTU-3” means a filter change to one technician and a full inspection to another. A checklist makes the job the same every time.
Ignoring what the PM found
Every finding needs a follow-up work order, or a note saying why not.

Preventive maintenance in Maintensor: repeats, checklists and counts

In Maintensor, a preventive job is a work order with a repeat on it. The preventive maintenance software page shows the whole feature.

  • The schedule. A job repeats daily, weekly on the weekdays you pick, monthly on a date or a weekday, or yearly, and can skip, as in every 3 months.
  • The next job. When a job is completed, the next one is created with the same details and a blank checklist. If it was late, the next is due on the first date of its schedule after today, so the schedule does not slide.
  • The checklist. A failed inspection check asks for a note and a photo, and offers a follow-up work order and to mark the asset down.
  • Counting it. Set the work type to Preventive, because a new work order starts as Reactive. On Pro and Max, Reporting shows admins the preventive ratio and how much was done on time.

What it does not do

There are no meter readings, and nothing comes due from hours, miles or cycles. Nothing is condition-based or predictive, and no sensors connect to it. One work order of a series is open at a time, so there is no calendar of the year ahead. It is a web app on a desk and a phone, with no offline mode.

The Free plan includes 5 recurring work orders; Pro and Max have no such limit. A record shows what was done and when; it certifies nothing.

Questions

What people also ask.

More in the blog, or see the whole product on the features page.

Is it preventive or preventative maintenance?

Preventive maintenance and preventative maintenance mean exactly the same thing. They are two spellings of one word, and both are in common use.

How often should preventive maintenance be done?

Preventive maintenance should start at the interval in the equipment's manual, then be adjusted from your own records. If a check finds nothing for a year, consider stretching the interval, unless it is a safety check, a test of standby or protective equipment, or an interval a rule sets. If the equipment fails between checks, shorten it or change the task.

What does PM stand for in maintenance?

In maintenance, PM stands for preventive maintenance. One scheduled job is also called a PM, as in "the monthly PM on the compressor", and a PM work order is the work order for that job.

Is preventive maintenance the same as planned maintenance?

Planned maintenance is any maintenance work planned before it starts, including a repair booked for next Tuesday. Preventive maintenance is the part of planned work done on a schedule to keep failures from happening, so all preventive maintenance is planned, but not all planned maintenance is preventive.

Do you need software for preventive maintenance?

Preventive maintenance does not need software to start: a list of jobs, dates and names in a spreadsheet works for a few assets. Software such as a CMMS helps once the list is long enough that jobs get missed, because it creates each job when it is due and keeps the record.

Set up your first recurring job.