What is fleet maintenance? A program for a small fleet

Fleet maintenance is the program that keeps a company's vehicles safe and working: daily driver inspections, preventive service at set intervals, a full inspection at least yearly, a repair for every reported defect, and a file for each vehicle.

By MaintensorUpdated 11 min read

Key points

  • Drivers check the vehicle before driving each day and report defects at the end of the day.
  • Most fleets group preventive service into levels, usually A, B and C, each a bigger visit than the last.
  • Every commercial motor vehicle, each trailer included, must pass a periodic inspection at least once every 12 months.
  • A reported defect likely to affect safe operation must be repaired before the vehicle is driven again.
  • To schedule by date, divide the maker's interval by miles a month, round down, and check the busiest month.

What a fleet maintenance program includes

A small fleet’s program has five parts. The rules named here are US federal rules, with the Canadian standard in brackets. They are information, not legal advice: check the rules that apply to your vehicles, and each vehicle maker’s manual.

Part Where the rule is
Daily inspection 49 CFR 392.7, 396.11, 396.13 (NSC Standard 13)
Defect repair 396.11(a)(3) (NSC Standard 13)
Preventive service 396.3(a), a systematic program (NSC Standard 11)
Periodic inspection 396.17 to 396.21 (NSC Standard 11)
Records 396.3(b) and (c) (NSC Standard 11)

It matters because a breakdown on the road turns a planned repair into a tow and a missed delivery, a roadside inspector can park a truck until a defect is repaired, and a complete service file lets a buyer trust its history.

Which vehicles the rules cover

In US interstate commerce, 49 CFR Part 396 sets out much of the program. 49 CFR 390.5 defines the commercial motor vehicles it covers mainly by weight: a vehicle or combination rated at 10,001 pounds (4,536 kg) or more.

Vehicles that carry more than 8 passengers for pay, or more than 15 without pay, counting the driver, and those hauling placarded hazardous materials also count. States set the rules for trucks that never leave the state, so check yours.

In Canada, the National Safety Code covers trucks and trailers over 4,500 kg registered weight, and each province and territory puts it into its own rules.

Preventive and corrective fleet maintenance

Preventive work is done on a schedule, before anything fails: the A, B and C services, the annual inspection, and tires and brakes replaced at the shop’s own limits.

A truck's oil and filter service: it started yesterday and is due on Thursday, repeats every 3 months on the 15th, and is estimated at an hour and a half.
A truck's service on the calendar: due on Thursday, repeating every 3 months on the 15th, with its estimate, the truck and its yard.

Corrective maintenance repairs what someone found: a defect on a driver’s report, a worn part found during a service, a roadside violation, a breakdown.

Every service turns up repair jobs, and a repair that keeps coming back on the same truck says the service is missing something.

Daily inspections by drivers

In the US, before driving, the driver must be satisfied that the vehicle’s brakes, steering, lights, tires, coupling and emergency equipment, among others, are in good working order (392.7). The pre-trip inspection checklist has the driver’s checks area by area, with what counts as a defect and a layout for the report.

The driver vehicle inspection report, the DVIR, has rules of its own:

  • Before driving, the driver reviews the last report, if it listed defects, and signs it (396.13).
  • At the end of the day, the report is written only when a defect was found or reported (396.11).
  • On a screen or on paper. Since March 23, 2026, the rule also says outright that the report may be made and kept electronically, under 390.32.

In Canada, NSC Standard 13 asks for a trip inspection of trucks, tractors and trailers every 24 hours, with a written report even when nothing is found.

Preventive service: A, B and C

Most fleets group preventive work into levels, usually called A, B and C, each a bigger visit than the last. The names are common practice, not a rule.

The pattern in NSC Standard 11

Canada’s NSC Standard 11 describes it in its introduction: an A inspection monthly or by distance (its example is 1,600 km), a B every two or three months or every 10,000 to 30,000 km, and a C every six months or 50,000 km, often just before the periodic inspection.

Level Typical contents Typical trigger
A Lights, tires and pressures, leaks, fluid levels, chassis grease, and whatever drivers reported Monthly, or a short distance
B All of A, plus oil and filters, brake lining and pushrod stroke measured, belts, hoses, air dryer The engine maker’s oil interval
C All of B, plus every system the periodic inspection covers: frame, suspension, steering, exhaust, fuel system, wheel bearings, coupling Yearly, just before the annual inspection

The truck and engine makers’ manuals set the real intervals and fluids. If a manual has a heavier schedule for short trips, idling or dust, and that is your trucks’ work, use it.

Tires and brakes

Tires
49 CFR 393.75 sets the minimum tread: 4/32 inch (about 3.2 mm) on the front tires of a truck or tractor and 2/32 inch (about 1.6 mm) on the others. It also forbids running a tire below the cold pressure for its load. Set the shop’s replacement point above the minimum, and check pressures with a gauge.
Brakes
Measure lining thickness and pushrod stroke at every B service and write the numbers down; 393.47 sets the limits. Appendix A to Part 396 says an automatic slack adjuster may not be adjusted by hand without first correcting the underlying problem.

The annual inspection

In the US, every commercial motor vehicle, including each trailer and converter dolly in a combination, must pass a periodic inspection at least once every 12 months (396.17), to the minimum standards in Appendix A to Part 396.

Who inspects
The inspector must be qualified under 396.19: someone who understands those standards and holds a state or provincial certificate, or has at least a year of training or experience as a mechanic or inspector.
The report
It names the inspector, the carrier, the date, the vehicle and the result for each component (396.21). Keep it 14 months where the vehicle is housed or maintained, and keep the report or a decal on the vehicle.
Other inspections that count
A state inspection, or one under a Canadian province’s program, that meets Appendix A counts for 12 months (396.17(f)).

In Canada, Standard 11’s periodic motor vehicle inspection is yearly for trucks and trailers and every six months for buses, at a government-approved facility. Some provinces inspect some trucks every six months, so check yours. The trailer inspection checklist covers a trailer’s own daily and yearly checks.

Defects and out of service

Three US rules decide when a vehicle stays in the yard:

  • A defect on a driver’s report that is likely to affect safe operation must be repaired before the vehicle is driven again. The carrier signs the report to show the defect was repaired or that repair is unnecessary (396.11(a)(3)).
  • A condition likely to cause trouble. No vehicle may be operated in a condition likely to cause an accident or a breakdown (396.7).
  • Out of service at the roadside. A roadside inspector can declare a vehicle out of service, and it may not be driven until the repairs are done. Within 15 days the carrier signs the report to show the violations were corrected, returns it if the state asks, and keeps a copy for 12 months (396.9).

Roadside inspectors in both countries work from the North American Standard Out-of-Service Criteria, published by the Commercial Vehicle Safety Alliance and revised each year.

In Canada, Standard 13 sorts defects into minor ones, reported and corrected before the next trip inspection or within the time your province allows, and major ones, with which no one may drive.

A simple shop rule: a defect likely to affect safe operation parks the truck until it is repaired, and that includes anything that would stop it at a roadside inspection.

Records to keep

US rules set how long each record is kept.

Record US rule Keep it for
Vehicle file: identification, what is due and when, every inspection, repair and service with its date and nature 396.3(b) 1 year where the vehicle is housed or maintained, and 6 months after it leaves your control (396.3(c))
Driver vehicle inspection reports, with the repair sign-off and the next driver’s review 396.11(a)(4) 3 months
Annual inspection report 396.21(b) 14 months
Proof of each annual inspector’s qualifications 396.19(b) While they inspect for you, and 1 year after
Roadside inspection reports 396.9(d)(3) 12 months

In Canada, Standard 11 asks for a file on each vehicle that includes the odometer reading at every service, kept at least two years, and six months after the vehicle leaves. It notes that many jurisdictions want brake repair invoices kept four or five years. Standard 13 trip reports are kept at least six months.

The vehicle maintenance log is a printable vehicle file, with a filled example.

Fleet PM schedule example: a calendar plan for 12 trucks

Many intervals in a truck’s manual are given in miles. A fleet that schedules by the calendar has to turn miles into months, then check the guess at every service.

Take Cedar Valley Delivery, a made-up yard with 8 box trucks on local routes, 3 tractors on regional runs and a service pickup, with Chris Walsh as its mechanic. All the numbers are made up.

1. Estimate miles a month

For each truck, subtract the odometer reading from three months ago from today’s, and divide by 3. Fuel receipts or old service records can supply the earlier reading. Note the busiest month too: peak season, or a truck covering for one in the shop.

2. Turn the interval into months, and round down

Divide the B service interval by the usual miles a month, round down, then check that the busiest month still fits. At Cedar Valley, that puts box trucks at every 3 months, tractors at every 2 and the pickup at every 5.

The working for each groupMiles a month, the interval and the busiest-month check
Group Trucks Miles a month, usual and busiest B service interval Interval ÷ usual miles Busiest-month check Repeat
Box trucks 8 2,500 and 3,200 10,000 miles 4.0 months 4 × 3,200 = 12,800, too far; 3 × 3,200 = 9,600, fits Every 3 months
Tractors 3 9,000 and 11,000 25,000 miles 2.8 months 2 × 11,000 = 22,000, fits Every 2 months
Pickup 1 1,200 and 1,400 7,500 miles 6.3 months 6 × 1,400 = 8,400, too far; 5 × 1,400 = 7,000, fits Every 5 months

Rounding down costs a few early oil changes a year, which is cheaper than finding out a truck ran far past its interval.

3. Fill in the rest of the plan

Add the A and C services and the plan comes to about 32 shop hours a month, or four of Chris’s working days. Drivers’ daily inspections come on top, on the driver’s time, not the shop’s.

The plan, job by jobFive jobs: 12 + 8 + 6 + 0.3 + 6 shop hours a month
Job Trucks Repeat Shop hours each Shop hours a month
A service 12 Monthly 1 12
B service, box trucks 8 Every 3 months 3 8
B service, tractors 3 Every 2 months 4 6
B service, pickup 1 Every 5 months 1.5 0.3
C service and annual inspection 12 Yearly, one truck a month 6 6

The rest of Chris’s month is left for repairs, tires and what drivers report. To keep the load even:

  • Stagger the yearly C services so one truck comes due each month.
  • Give each box truck’s B service a different week.
  • When a truck’s A and B fall in the same month, write the B checklist as only what B adds, and do both in one visit.

The preventive maintenance schedule guide covers spreading the load across weeks.

4. Check the estimate at every service

Write the odometer reading on every service. Say truck 7’s B service shows 11,800 miles since the last one: its route has grown past the estimate, so it gets a repeat of its own, every 2 months. A spare tractor that covered 4,000 miles in two months gets its service early, which is the cheap side of the error.

A calendar plan stops fitting when trucks in the same group cover very different miles, or one truck’s miles swing from month to month. That fleet is better served by scheduling from the odometer, with software that reads it or someone who collects every truck’s reading each week. Time-based maintenance covers where calendar intervals fit and where they do not.

Fleet maintenance in Maintensor: services by date, defects as requests

Maintensor schedules by the calendar only. If a plan has to follow the odometer week by week, it is the wrong tool for that part. The fleet maintenance software page shows what it does for a fleet shop:

  • Each service is a repeating work order: Monthly for the A, Monthly every 3 for a box truck’s B, Yearly for the C. Completing one creates the next.
  • Each checklist is a procedure, with a Number step for the odometer, a Text step for the driver’s or mechanic’s name and a Signature step (it stores the drawing and the time, not which user signed).
  • Drivers can be Requesters, free on every plan, and report a defect from a phone’s browser, picking the truck.

The plan above is 36 repeating work orders (48 with a daily inspection per truck), more than the Free plan’s 5, so it needs Pro or Max (plans).

What it does not do

There are no odometer, mileage or engine-hour triggers, no telematics and no fuel log. An odometer reading in a Number step stays on that work order: it does not show on the truck’s record, and nothing comes due from it.

Answering a daily inspection checklist in the app takes a Full user seat, and there is no built-in DVIR form: you build one as a procedure. The records are not printed or exported; they are read in the app.

Questions

What people also ask.

More in the blog, or see the whole product on the features page.

What are A, B and C services in fleet maintenance?

They are levels of preventive service, each bigger than the last. An A service is a short monthly check of lights, tires, leaks and fluids with a chassis grease. A B service adds oil, filters and brake measurements. A C service checks every system, often just before the annual inspection. The names are common practice, not a rule; the truck maker's manual sets the intervals.

How often does a commercial truck have to be inspected?

In the US, the driver checks the truck before driving each day, and every commercial motor vehicle, each trailer included, must pass a periodic inspection at least once every 12 months under 49 CFR 396.17. In Canada, trucks and trailers get a trip inspection every 24 hours and a periodic inspection at least yearly, buses every six months. Your state or province may ask for more.

Can fleet preventive maintenance be scheduled by date instead of mileage?

Yes, when each truck covers steady miles. Estimate miles a month from past odometer readings, divide the maker's interval by it, round down, and check that the busiest month still fits. Record the odometer at every service and shorten a truck's repeat when its miles grow. When miles swing widely from month to month, schedule from the odometer instead.

Do vans and pickups need the same maintenance program?

The federal Part 396 rules apply to commercial motor vehicles, which for most fleets means a rating of 10,001 pounds or more, so most vans and pickups fall outside them unless they tow a trailer that brings the combination to that rating. They still need daily checks, scheduled service and a record for each vehicle. Check your state's or province's rules too.

Put your trucks and trailers on the calendar.

Start the trial, add each vehicle with its VIN, set its services to repeat by date, and keep every repair on its record. Services come due by the calendar, not by mileage.

30-day free trial. No credit card.