What is time-based maintenance?

Time-based maintenance is preventive work done at fixed intervals of calendar time (every month) or running time (every 500 hours), whatever condition the equipment is in. It is also called periodic maintenance.

By MaintensorUpdated

Time-based maintenance and its two clocks

NASA’s reliability-centered maintenance guide (2008, section 5.2) describes preventive maintenance at “pre-defined intervals (time, operating hours, or cycles)” and adds that “it is performed regardless of equipment condition.”

  • Calendar time: every day, week, month or year.
  • Running time or use: every so many hours, cycles or miles, also called usage-based or meter-based maintenance.

Where it works

  • Parts that wear with age or use: filters, belts, brushes, lubricant, wear strips.
  • Intervals a rule or maker sets, such as the monthly visual inspection and yearly maintenance check OSHA’s 29 CFR 1910.157 requires on portable fire extinguishers.
  • Cheap checks and small crews: a two-minute look at a gauge costs less than deciding whether it is needed, and a calendar is all it takes.

Its limits

A fixed interval works only if failure follows age, and often it does not. The NASA guide (section 4) cites three studies, from 1968 to 1982, in which random failures made up 77 to 92 percent of all failures. No interval picks the right moment for those.

Taking a healthy machine apart on a schedule can also break it: the guide warns that scheduled overhaul can bring “a high infant mortality rate into an otherwise stable system.”

Time-based example: 2,000 running hours as a calendar repeat

A compressor’s manual calls for an oil and filter change every 2,000 running hours (made up: use your manual’s figure). It runs two 8-hour shifts, five days a week.

weeks between services = interval in running hours ÷ running hours a week

80 hRunning hours a week
16 h × 5 days
25 weeksLongest gap allowed
2,000 ÷ 80
5 monthsCalendar repeat
about 1,740 h between changes

In the slow season the plant drops to one shift, and the same 5 months is about 870 hours: the oil comes out with less than half its life used. Safe, but wasteful, so write the hour meter down at every service and stretch the repeat if it keeps coming in short.

The numbers, line by lineBoth seasons, from the manual's 2,000 hours.
Item Figure
Maker’s interval 2,000 running hours
Running hours a week, two shifts 16 × 5 = 80
Weeks to 2,000 hours 2,000 ÷ 80 = 25
Calendar repeat chosen 5 months, about 21.7 weeks
Hours between changes, two shifts 21.7 × 80 ≈ 1,740
Hours between changes, one shift 21.7 × 40 ≈ 870

Every number is made up.

Time-based vs condition-based maintenance, clock by clock

  • On the calendar: due on a date. Simple, but blind to how hard the machine worked.
  • On running time: due after so many hours, cycles or miles. Someone must read the meter.
  • Condition-based: due when a reading passes its limit. Someone must take and judge it.
  • Scheduled maintenance is what a time-based rule produces: a date and a person.

Setting the first interval from the maker’s figure and adjusting it after a few cycles is in the preventive maintenance schedule guide.

Calendar repeats in Maintensor, and no run-hour triggers

Maintensor repeats preventive maintenance work on the calendar only: daily, weekly on chosen weekdays, monthly on a date or a weekday, or yearly, each every N, so “every 5 months” is a monthly repeat every 5. The next work order is created when the current one is completed, due on the schedule’s next date.

Preventive maintenance software in Maintensor: a work order's repeat form set to every 4 weeks on Wednesday, with its next five due dates.
A work order's repeat form set to every 4 weeks on Wednesday, with its next five due dates.

There are no run-hour, meter or mileage triggers. A Number step can record the hour meter on the checklist, but the reading stays on that work order and triggers nothing, so convert a usage interval to a calendar repeat as above.

Questions

What people also ask.

More in the glossary, or see the whole product on the features page.

Is periodic maintenance the same as preventive maintenance?

Periodic maintenance is one kind of preventive maintenance: the kind done at fixed intervals. Preventive maintenance is broader, and also includes condition-based work that is triggered by an inspection or a reading rather than by the calendar. In everyday use, though, most people say preventive maintenance and mean periodic work on a calendar.

How do you set a time-based maintenance interval?

Start with the interval in the equipment maker's manual, or the one a regulation sets if there is one. If the manual gives run hours, divide them by the hours the equipment runs in a typical week to get a calendar interval, and round down. Then record what each service finds, and stretch or shorten the interval after a few cycles.