The three things condition-based maintenance needs
Condition-based maintenance replaces “change it every six months” with “change it when it shows it needs changing.”
act when reading ≥ limit
- A condition
- something you can measure or see: temperature, vibration, pressure, wear, a crack or a leak
- A limit
- the reading at which you act, set early enough to leave time to plan the work
- An interval
- checks often enough to catch the change before the machine fails
Add a second, lower limit at which you look closer and check more often. CBM only works for failures that give warning, checked more often than the time from the first sign to the failure; the predictive maintenance guide covers that interval, and when instruments and sensors pay.
Condition-based maintenance example: a fan bearing’s two limits
The numbers are made up. A technician reads a supply fan’s drive-end bearing with an infrared thermometer once a month, at the same spot, at full load. In a 70 °F (21 °C) room it normally reads about 110 °F (43 °C).
At 130 °F (54 °C), grease it, look for a cause and read it weekly. At 150 °F (66 °C), plan a bearing change for the next stop.
January to March
May: greased, read weekly
May, week 4
replaced on a planned Saturday
The numbers, line by lineMonthly readings, then weekly once the first limit was crossed.
| Reading | Temperature | What happened |
|---|---|---|
| January to March, monthly | 109 to 112 °F | Nothing: normal |
| April | 118 °F | Noted, still under the first limit |
| May | 131 °F | First limit: greased, old grease found hard; weekly readings start |
| May, week 2 | 136 °F | Still rising; bearing ordered |
| May, week 3 | 144 °F | Change planned for Saturday |
| May, week 4 | 152 °F | Bearing replaced Saturday; outer race found pitted |
The bearing was changed on a planned day, with the part on hand, instead of on the night it seized. NASA’s RCM guide for facilities backs the move to weekly readings (section 4.1).
Act far below what the part can stand
Compare readings taken under similar load and room temperature, and keep the action limit well under the material limit: NASA’s guide lists 125 °C (257 °F) for a rolling bearing’s races (section 7.2.3), far above where you should already have acted. The machine’s maker sets the real ceiling.
Condition-based vs time-based, predictive and condition monitoring
- Time-based maintenance works on a date or after a number of hours, whatever the condition. It suits parts that wear out at a predictable age, like filters.
- Predictive maintenance is condition-based maintenance with instruments and trends, read by a trained person who estimates the time left.
- Condition monitoring is the measuring itself; condition-based maintenance is the decision to act on it.
- The P-F interval, from the first sign to the failure, sets how often a check must run.
Condition routes in Maintensor, with no triggers or sensors
Maintensor has no condition triggers: nothing comes due because a reading crossed a limit, and no sensors connect to it. A route is a recurring work order with a procedure as its checklist.
A Number step records the reading, with no unit or limit of its own and no trend across work orders, so write both into the step’s wording and pair it with an Inspection check, such as “Bearing under 130 °F”, answered Pass, Flag or Fail.
A Fail asks for a note and a photo, then offers a follow-up work order.