How condition monitoring compares each reading with a baseline
A machine on its way to failing usually shows it. A bearing gets louder and warmer, a gearbox’s oil picks up metal, a pump draws more current for the same flow. Condition monitoring measures one of these signs on a schedule and compares each reading with the machine’s own normal, its baseline.
The readings come from manual rounds, where a person takes them with a temperature gun or a vibration pen, or from online sensors that send them all day. Rounds are cheap and only as good as their discipline; sensors cost more and suit a few critical, always-running machines. ISO 17359 sets out the general procedure for a monitoring program.
Condition monitoring example: a compressor’s rising temperature
ExampleOne reading a week, off the compressor's panel
A made-up plant reads its air compressor’s discharge temperature at full load on the weekly round. The first eight weeks set the baseline at 180 to 184 °F (82 to 84 °C). The alert: any reading above 190 °F (88 °C), or three in a row, each higher than the last.
| Week | 9 | 10 | 11 | 12 |
|---|---|---|---|---|
| Discharge temperature | 182 °F | 185 °F | 188 °F | 191 °F |
The trend trips the alert at week 11, a week before the fixed limit would have. The cooler fins are packed with dust, and an hour with a brush and compressed air, on a planned day, brings the reading back to 183 °F. Every number is made up; the compressor’s manual gives the real range.
Five machines, one reading each
Pick the five machines that would hurt most to lose, and one reading on each. Mark the spot, take it under the same load on every round, and agree in advance what change turns into a job. A reading never compared with the last one is only a ticked box.
The main techniques
- Vibration analysis: imbalance, misalignment, looseness and bearing wear in motors, pumps, fans and gearboxes.
- Oil analysis: wear metals, dirt and water in gearboxes, hydraulics, compressors and engines.
- Infrared thermography: hot connections, overloaded circuits and hot bearings.
- Ultrasound: air and steam leaks, early bearing wear and electrical discharge.
- Process readings and the senses: pressure, flow and current draw, and the leaks, noises and smells a round picks up.
The predictive maintenance guide sets out each technique, its tools and who reads the results.
Condition monitoring vs inspection, condition-based and predictive work
- An inspection asks pass or fail, now; monitoring records a number to compare with last month’s.
- Condition-based maintenance is acting on the readings: the work is done when they say so.
- Predictive maintenance forecasts when the failure will come, usually with instruments and software.
- The P-F curve draws the warning time each technique gives, which sets how often to take the readings.
Readings on a round in Maintensor, with the trend kept elsewhere
Maintensor has no sensors, meters or condition monitoring. In a procedure, a Number step records a reading on the work order, and an Inspection check records Pass, Flag or Fail, with a follow-up work order offered on a Fail. The reading shows only on that work order’s checklist. It is not trended or charted, so keep the trend in a spreadsheet.