What is oil analysis?

Oil analysis is sending a sample of a machine's oil to a lab on a schedule to read what it holds: metal from wearing parts, dirt and water that got in, and whether the oil is still fit to use.

By MaintensorUpdated

Oil analysis tests: wear metals, viscosity, water, particle count and acid number

A lab report answers three questions, as NASA’s reliability-centered maintenance guide for facilities (2008, section 6.6) frames them: is the machine wearing, is the oil still good, and has something got in? A standard package covers:

Test What it reports What a change can mean
Viscosity at 40 °C, in centistokes (cSt) How thick the oil is Thicker: oxidation or the wrong oil. Thinner: fuel or solvent
Elements, in parts per million (ppm) Wear metals such as iron and copper, silicon from dirt, sodium from coolant Which part is wearing, and what got in
Water Water dissolved or mixed in Rust and poor lubrication
Acid number How far the oil has oxidized The oil is wearing out
Particle count, as an ISO 4406 code Solid particles by size How clean the oil is, which matters most in hydraulics

The lab flags results outside its limits, but your own trend is the better guide. A gearbox that always reads 20 ppm iron is not one that just went from 20 to 60.

Oil analysis example: a mixer gearbox, four quarterly samples

A made-up mixer gearbox on ISO VG 220 gear oil is sampled quarterly. Iron creeps up a few ppm each time: normal wear. Then the fourth sample:

226 cStViscosity
inside its 198 to 242 band
62 ppmIron
24 last quarter: nearly triple
25 ppmSilicon
6 last quarter: dirt is getting in

Iron rising with silicon means dirt is getting in and grinding the gears. The crew finds a cracked breather cap, replaces it, changes the oil and samples again a month later for a new baseline. Its vibration had not yet changed.

The four samples, line by lineQ1 to Q4, and the viscosity band.
Sample Q1 Q2 Q3 Q4
Iron, ppm 18 21 24 62
Silicon, ppm 6 7 6 25
Water, ppm 150 170 160 180
Viscosity at 40 °C, cSt 221 223 222 226

ISO VG 220 means 220 cSt at 40 °C, within 10% either way (ISO 3448). Every number is made up.

Taking a good sample

Same point, same way, every time

A bad sample gives a confident wrong answer. Take it from moving oil at operating temperature, mid-reservoir or before the filter, never from the drain. Use the lab’s clean bottle, and label it with the machine, date, running hours and any top-up since the last one.

The hydraulic system maintenance checklist covers sampling a hydraulic unit and reading its ISO 4406 code.

Oil analysis vs vibration analysis and calendar oil changes

  • Not vibration analysis. Vibration sees a fault once the machine shakes differently; oil often sees wear sooner, and sees its cause, such as dirt or water.
  • Not a calendar oil change. That replaces the oil whatever its state; analysis says whether it needs replacing.

Oil and vibration analysis are both condition monitoring. The predictive maintenance guide covers which machines earn a test and how the techniques compare.

Logging oil samples in Maintensor

Maintensor does not analyze oil and has no link to a lab. The sampling can be a recurring work order with its steps built in the app’s maintenance checklist software: a step for the sample point, a Photo step for the bottle’s label and a Number step for the running hours, with the lab’s report attached as a file.

A Number step’s value shows only on that work order’s checklist and is not charted: the trend lives in the lab’s report or your own sheet.

Questions

What people also ask.

More in the glossary, or see the whole product on the features page.

How often should oil samples be taken?

How often to sample oil depends on how critical the machine is and how fast its oil changes. NASA's facilities maintenance guide gives quarterly or twice a year as typical once a machine has a year of history, and quarterly for hydraulic systems other than mobile ones. Sample more often when a trend starts to move.

Is oil analysis worth it for a small machine?

Oil analysis is often not worth it for a small sump. When the oil, the labor and the disposal cost less than a lab test, change the oil on a schedule instead. Testing pays on large reservoirs, expensive oils, and machines whose failure would stop work or cost a lot to repair.

Write the steps down once.

Start the trial and type one routine in as a procedure: the checks, the readings, a photo where it matters. Attach it to a job that repeats, and every technician works through the same list.