What vibration analysis reads: the overall level and the spectrum
A sensor on a bearing housing measures the vibration, usually as velocity for overall condition and as acceleration for early bearing damage. The overall level is one number for all of it; the spectrum splits it by frequency, counted against running speed, which is how an analyst tells one fault from another.
These start a diagnosis; they are not one.
Meters, analyzers and fixed sensors
- A handheld meter, or vibration pen, gives the overall level: cheap, but it cannot say which fault is behind a rise.
- A data collector or analyzer records the spectrum along a route; ISO 18436-2 sets how the analysts who read it are qualified.
- Fixed sensors report all the time, for a few critical or hard-to-reach machines.
Contract the route, take pen readings between visits
Start with a contractor’s route on the 5 to 15 rotating machines that matter most, with pen readings on the worst between visits, at the same marked spot and load. The predictive maintenance guide covers when instruments pay.
How severe is severe: the ISO 20816 series
Overall vibration is judged against the ISO 20816 series, which replaced ISO 10816. Part 1 gives the general guidelines; Part 3 covers industrial machines above 15 kW, from 120 to 30,000 r/min.
It sorts readings into four zones: A, a new machine; B, fine for long-term running; C, fit only for a limited time until a repair; D, severe enough to cause damage.
The boundaries depend on the machine’s group, size and mounting. It also judges change from the machine’s own normal, so a jump is worth acting on while still in zone B.
Vibration example: a supply fan’s monthly pen readings
A made-up belt-driven supply fan gets a monthly pen reading at its drive-end bearing. Its baseline is 0.10 in/s (2.5 mm/s); the team’s alert, set from it, is 0.15 in/s (3.8 mm/s).
readings go weekly
a tall peak at 1×
imbalance, from caked dust
NASA’s reliability-centered maintenance guide (2008, section 4) says that past the alert level, readings should come three to four times as often, so the fan goes weekly. Without the trend, the next sign would have been a failed bearing.
The fan's numbers, line by lineFive monthly readings, in in/s and mm/s.
| Month | Jan | Feb | Mar | Apr | May |
|---|---|---|---|---|---|
| Overall, in/s | 0.10 | 0.11 | 0.10 | 0.16 | 0.21 |
| Overall, mm/s | 2.5 | 2.8 | 2.5 | 4.1 | 5.3 |
Every number is made up.
Vibration analysis vs oil analysis, thermography and precision work
- Condition monitoring is the umbrella; vibration is its most common technique.
- Oil analysis sees wear particles, and works on slow gearboxes where vibration struggles.
- Infrared thermography finds heat, mainly in electrical gear.
- Precision maintenance prevents what vibration finds, by aligning and balancing well.
Pen readings and contractor reports in Maintensor
Maintensor does not do vibration analysis, and it connects to no sensors or meters. A Number step in a procedure can record a pen reading on the work order, but the value shows only on that work order’s checklist and is not trended.
So the trend lives in a spreadsheet or the contractor’s report. The report can be attached to the work order, and each finding raised as its own work order.