What is infrared thermography?

Infrared thermography is scanning equipment with a thermal camera to see heat the eye cannot: a loose electrical connection, an overloaded circuit, a dry bearing or a failed steam trap shows up hotter, or colder, than it should.

By MaintensorUpdated

What it finds

Where What shows Usual cause
Breakers, lugs, fuses, bus One spot or phase hotter than its neighbors A loose, corroded or undersized connection; an overload
Motors and bearings A housing hotter than the other end, or than last time Wrong amount of grease, misalignment, wear
Steam traps Hot on both sides, or cold Passing steam, or blocked

A reading is judged against the air around it and against similar parts under similar load, such as the three phases of one breaker. NASA’s reliability-centered maintenance guide (2008, section 6.4) notes the second is far less upset by reflections and emissivity.

Covers off, equipment live

The scan is done under load with covers off: in the US, work for a qualified person with the right protective equipment under OSHA’s 29 CFR 1910.333 and NFPA 70E. Fixing what it finds is done de-energized, under lockout and tagout.

What NFPA 70B asks for

NFPA 70B became a standard rather than a recommended practice with its 2023 edition. In that edition:

  • Section 7.4: covers off, the scan done at normal load or no less than 40% of nominal load, and the temperature differences and the load recorded.
  • Table 9.2.2: a scan of all equipment every 12 months, or every 6 months for equipment rated Condition 3, such as equipment whose failure would endanger people. Chapter 9 applies these where the maker gives no interval and a failure would pose an unacceptable risk.

A 2026 edition is now current, and whether it binds you depends on your jurisdiction, insurer and employer. In Canada, CSA Z463 covers the same ground. Between scans, the electrical inspection checklist covers what the eye can check.

Thermography example: a hot phase on a compressor breaker

A made-up plant scans its motor control center yearly at about 70% of normal load; the air is 77 °F (25 °C). The breaker feeding the air compressor reads:

95 °FPhase A
35 °C
97 °FPhase B
36 °C
131 °FPhase C
55 °C, about 35 °F above A and B
54 °FPhase C above ambient
131 − 77 °F, or 30 °C

In the NASA guide’s table, a 40 to 80 °F rise means repair at first availability. With the breaker locked out, the phase C lug is found loose and discolored; it is cleaned and torqued to the maker’s value, and a rescan under load shows the three phases alike.

The NASA guide's actions, line by lineSection 7.2.3: suggested actions for a rise above ambient under load.
Rise above ambient Suggested action
10 to 25 °F (6 to 14 °C) Repair at convenience
25 to 40 °F (14 to 22 °C) Repair at the next scheduled availability
40 to 80 °F (22 to 44 °C) Repair at first availability
Over 80 °F (44 °C) Repair immediately

The guide says these may be adjusted for conditions. The example’s numbers are made up.

Thermography vs vibration: rotating machines and electrical gear

Thermography is one technique of condition monitoring. On bearings, heat often shows later than a change in vibration, so rotating machines are better watched by vibration and electrical gear by heat. The predictive maintenance guide compares the techniques.

The yearly scan in Maintensor: a report and a job per finding

Maintensor does not connect to cameras or read temperatures. The yearly survey can be a work order that repeats Yearly, with the thermographer’s report attached as a file, and each finding raised as its own work order on the panel or machine so it is tracked to done.

A Number step in a procedure can record a temperature on a work order, where it shows only on that work order’s checklist.

Questions

What people also ask.

More in the glossary, or see the whole product on the features page.

Can my own electrician do infrared scans?

An electrician can do infrared scans after training in the camera and in reading the images, which certification programs for thermographers cover. Many small sites hire a certified thermographer and have their own electrician open the panels.

What is the difference between a thermal camera and an infrared thermometer?

An infrared thermometer, or temperature gun, reads one spot. A thermal camera shows the temperature of everything in view as an image, so a hot lug in a crowded panel is not missed. A gun is fine for a bearing on a round; a panel needs a camera.