A flat commercial roof in low light, with rooftop air conditioning units, galvanized ductwork and exhaust fans.

Facility maintenance software for the building and everyone in it.

Building maintenance software for rooftop units, boilers, elevators and the requests tenants send. Quarterly services repeat by date, and a tenant's complaint goes into one queue instead of someone's text messages.

What it does there

From a tenant's complaint to the roof: four parts of the app.

Requests

Tenants report it here, not by text.

Tenants and the front desk get the free Requester role, sign in and report the stained tile or the fast lobby door in one line. You approve or decline with a reason, and they see where it went.

The requests queue of an office building: a lobby door that closes too fast, a dripping faucet, a light out in the garage and a stained ceiling tile.

Preventive maintenance

Finish this quarter's rooftop service, and the next is there.

Set a rooftop unit's service to repeat every three months, ahead of the cooling and heating seasons. Closing it creates the next one, with its checklist, its filters and its assignee.

A quarterly rooftop unit service: it started yesterday and is due on Wednesday, repeats every 3 months on the 14th, and is estimated at two hours.

Assets and locations

Four rooftop units, and RTU-3 is the one that is down.

Four rooftop units on one roof are one asset with four units, each with its own work. When a floor calls too warm, the list shows whether its unit is already marked down.

The assets list on the roof: one rooftop unit asset with four units, RTU-1 to RTU-4, where RTU-3 is down.

Parts and purchasing

The fan motor is not on the shelf, and the repair says so.

A rooftop unit repair that needs a condenser fan motor the mechanical room does not hold shows as one short. On Max, the part's record also names the purchase order bringing it.

A condenser fan motor's stock: none on hand in the mechanical room against a reorder level of 1, and a rooftop unit repair that needs 1 and is 1 short.

In facilities

Built around what a building runs on.

Most of it sits on the roof or behind a locked door until a tenant calls, and contractors do the licensed work.

  • Rooftop units and air handlersKeep four rooftop units as one asset with four units. Quarterly filter and belt services repeat by date, and a yearly cooling start-up can land before the first warm days.
  • Boilers and pumpsA repeating boiler room check records the supply temperature and system pressure, and what a look at the relief valve and the pump seal found.
  • ElevatorsMark an elevator In maintenance while the contractor has it, with the reason on its record.
  • Plumbing and fixturesA dripping faucet reported by the front desk becomes a work order for the floor it is on.
  • Lighting and electricalA dead fixture needs no asset record of its own, so the work order names the place: a suite, a floor, the P2 level of the garage.
  • Suites, floors and common areasEach suite sits inside its floor and lists the work open there, so a second call about a suite can be checked against what is already open.

Questions

Facilities, in plain answers.

See every module on the features page. For the usual fire and safety checks by month, in the US or Canada, use the free inspection calendar.

What is facility maintenance software?

It is software that keeps a building's maintenance in one place: the requests people send, the work orders, the services that repeat, the equipment, the spare parts and the history of what was done. Maintensor is a CMMS for that work. It does not handle leases, space planning or tenant billing.

Can tenants send requests?

Yes, if you invite them. A tenant needs the Requester role and signs in to report a problem, in words only: a request carries no photo. There is no public form or link. A requester's picker lists every location and asset in your account, other tenants' suites included. Requesters cost nothing in any plan, but cannot run checklists.

Is the tenant told when the work is done?

Yes. On their own list the request moves to Finished and reads Fixed. On Pro and Max, Maintensor also emails them when their request is approved, declined or done.

Can it manage more than one building?

Yes. Each building is a location, with its floors and rooms inside it. Every asset sits in a location, and a work order can name one. A location can have its own address.

Does it keep track of outside contractors?

A vendor's record holds its contacts and the equipment it covers, and on Max a purchase order can be raised to it. A contractor has no access of their own unless you give them a user seat, and there is no vendor portal, so someone on your team writes up what the elevator or fire contractor did and can attach their report.

Does it handle fire and life safety inspections?

A checklist can be built for any inspection and set to repeat, such as a monthly extinguisher round, and the app records what each check found. A licensed contractor's yearly test can be a repeating job with their report attached. Maintensor does not certify compliance with a fire or building code.

Start with the roof.

Start the trial, add your rooftop units and set their next service. Then invite one tenant, and see whether the next too-warm call lands in the queue instead of on your phone.

30-day free trial. No credit card.