What is facility maintenance?

Facility maintenance is the work that keeps a building and its grounds safe and usable, from heating, plumbing and lighting to the roof and the fire alarm, plus whatever the people inside report.

By MaintensorUpdated 10 min read

Key points

  • The work comes in four types: planned, reactive, emergency and deferred.
  • Requests come in waves with the weather, so do the cooling start-up before the first warm days.
  • NRCA recommends a roof inspection at least twice a year, in spring and fall, and after severe weather.
  • Hiring a contractor for a test does not hand off the responsibility for what the report finds.
  • In the worked example, planned work is about 6% of the team's hours, yet it is the part that slips.

What facility maintenance covers

Facility maintenance looks after everything in and around a building that has to keep working. For an office, a school, a clinic or a small commercial building, that comes down to seven areas:

Area What it includes
Heating, cooling and ventilation Rooftop units, boilers, air handlers, exhaust fans, thermostats
Plumbing Restrooms, water heaters, drains, sump pumps, backflow preventers
Electrical and lighting Panels, outlets, interior and parking lot lights, the generator
Roof and envelope Roof membrane, drains, gutters, walls, windows, sealants, doors
Fire and life safety Fire alarm, sprinklers, extinguishers, emergency lights, exit signs, fire doors
Elevators Cars, doors, phones, machine rooms
Grounds Parking lots, sidewalks, landscaping, snow and ice

On top of that sit requests, the work nobody plans: a conference room too hot, a running toilet, a stained ceiling tile. In a busy building they can outnumber the planned work orders several times over, as they do in the made-up example below. A small team stays ahead by giving the planned part a year plan and the reactive part a single queue.

The requests queue of an office building: a lobby door that closes too fast, a dripping faucet, a light out in the garage and a stained ceiling tile.
A building's requests queue: four problems waiting for a decision, the oldest for 4 days, each with who asked and where.

All of this matters because fire alarms, sprinklers and exits have to work on the one day they are needed, a cold office or a dark stairwell lands on people at once, and a small roof leak left for a winter becomes wet insulation, a stained ceiling and a closed room.

Property maintenance is the same trade work done for an owner and the tenants who rent from them, with apartment turnovers and landlord rules on top.

Types of facility maintenance: planned, reactive, emergency and deferred

The work in a building comes in four types: planned, reactive, emergency and deferred. Types of maintenance has the full list across every setting.

Planned
Anything you can put on a calendar, such as the spring roof inspection. Most of it is preventive maintenance.
Reactive
Everything else: the leak, the tripped breaker. Most of it is corrective maintenance that can wait for a free slot later today or this week.
Emergency
The reactive work that cannot wait: water coming through a ceiling, no heat in January, someone stuck in the elevator. Emergency maintenance tells it apart from work that is merely urgent.
Deferred
Work that was due and was put off, usually a big job waiting for money or a window. Deferred maintenance covers how to price and rank that list.

Most reactive work in a building arrives as a complaint from a person, not an alarm from a machine, and it comes in waves:

"Too hot" on the first warm days"Too cold" on the first cold morningLeaks after the first heavy rain

You cannot plan the single calls, but you can plan for the wave. Do the cooling start-up before the warm days, not during them.

Planned work in a building is also easy to put off: skip a roof inspection and nothing happens for years, until the roof leaks over the server room. That is how deferred maintenance builds up.

Watch the direction, not the figure

The share of work that was planned (the planned maintenance percentage) has no single right figure for a building, because every light out is a small reactive job of its own. Count it every month: if it falls three months running, requests are pushing the planned work aside.

Facility maintenance plan by season, for a small team

A crew of 2 to 5 people looking after a few buildings needs a list of everything that comes due in the year, spread so that no month is buried. In Canada and the northern states, move the spring work later and the fall work earlier to suit your frosts.

When Planned work Contractors to book
Every month Building walk; extinguisher and emergency light checks; generator run; filters where the gauge or the calendar says None
Spring (March to May) Roof and drain inspection after winter; gutters cleared; cooling start-up on rooftop units (coils, belts, filters, condensate drains); irrigation on; parking lot walked for winter damage Backflow test; a paving quote for crack sealing
Summer (June to August) Filter changes through the cooling season; exterior paint and sealant; projects in rooms that are empty for the holidays Sealcoating and restriping; fire alarm and sprinkler tests if they fall here
Fall (September to November) Heating start-up (boilers, burners, flues, carbon monoxide alarms); second roof inspection; gutters after the leaves fall; hose bibs and irrigation drained; salt and shovels stocked Boiler inspection where your jurisdiction requires one; snow removal contract signed
Winter (December to February) Snow and ice; freeze patrol of stairwells, docks and anything with heat trace; indoor projects; next year’s budget and bids Snow removal as it falls

Why the roof appears twice

The National Roofing Contractors Association recommends roof inspections at least twice a year, preferably in spring and fall, and after any severe weather. The roof inspection checklist says what to look at and what counts as a fail.

Most of the other placements are common practice rather than rules: book a contractor when the contractor has slack, not in their busiest month.

The facility maintenance checklist turns this into checks for every area. The HVAC and generator checklists have the full service for those.

Contractors or your own crew

Keep frequent, quick work that needs no license with your own crew, and contract whatever needs a license, a certification, special equipment or a skill used once a year.

  • Filters, belts, lamps, minor plumbing, roof walks, monthly life safety checks: your crew.
  • Burner and boiler combustion work: an HVAC or boiler contractor. It is often licensed, and a fault can put carbon monoxide in the building.
  • Backflow tests and panels: a certified tester and an electrician, for the certification or license.
  • Refrigerant work on air conditioning: a contractor, unless your technician holds EPA Section 608 certification. EPA Section 608 rules say who may handle refrigerant.
  • Fire alarm and sprinkler testing: a fire protection contractor. NFPA 72 and NFPA 25 call for qualified people; check whether your state or province licenses them.
  • Elevators: the elevator contractor, for specialist mechanics and inspection by your state, province or city.
  • Roofs: debris and drains in-house; repairs by a roofer. NRCA suggests the installer make repairs on a roof under warranty, to avoid conflicts with its terms.
  • Paving, sealcoating, restriping: a paving contractor, for equipment and materials you do not keep.

Contracting does not hand off the responsibility

Your crew still books the visit, lets the technician in, reads the report and turns each deficiency into a job. A sprinkler report listing three corroded heads is only useful once someone replaces them.

Much of the in-house work is done off the floor, so the ladder and the lift get checked before the job, not during it. The ladder inspection checklist and the scissor lift inspection checklist say what to look at and what takes each one out of service.

Records an inspector or insurer may ask for

Keep a dated work order for each test, with the contractor’s report attached, because a fire inspector or an insurer looking at a claim usually asks the same things: when was it last tested, by whom, and what was found. Keep the records in one place, building by building.

The eleven records, and where each requirement comes fromFire and life safety, elevator, boiler, backflow, refrigerant, Legionella, energy and roof, with links to the rules
Record Where the requirement comes from
Monthly extinguisher inspections and the yearly maintenance date OSHA 29 CFR 1910.157(e), where extinguishers are provided for employees; NFPA 10
Emergency light and exit sign tests: 30 seconds monthly, 90 minutes yearly on battery NFPA 101, section 7.9.3, in the edition your jurisdiction adopted; South Dakota’s test log quotes the 2000 edition
Fire alarm and sprinkler inspection, test and maintenance reports NFPA 72 and NFPA 25; the contractor writes them
Fire door inspection, yearly NFPA 80, section 5.2.1 in its 2007 and 2010 editions; the fire door inspection checklist covers it
Elevator inspection certificate and maintenance records Your state, province or city; under ASME A17.1 the maintenance control program records are kept on site, with forms your elevator contractor provides, as Washington’s Department of Labor and Industries explains
Boiler inspection certificate Your state or province, where it requires one; often inspected through your insurer
Backflow test reports Your water utility or local plumbing code
Refrigerant leak inspection and repair records for larger systems EPA Section 608 rules: the owner keeps them, from the paperwork your HVAC technician must hand over after each visit
A water management program for Legionella, where the building needs one The CDC’s water management toolkit, based on ASHRAE Standard 188
Energy use reports Where a city or state requires benchmarking; dozens of state and local governments build their programs and laws on EPA’s ENERGY STAR Portfolio Manager
Roof inspections with photos NRCA advises filing written notes and photos so each inspection can be compared with the last

This list is information, not legal advice. Your fire marshal, building department and insurer decide what applies to your building; in Canada, your province’s fire code and its boiler and elevator safety authorities.

Facility maintenance workload example: three buildings, three people

ExampleA year of planned work and requests

A made-up team of three (Susan Clarke leads, with technicians Jason Miller and Andre Dubois) looks after an office building, a retail building and a small warehouse. Every number is invented.

Eleven planned routines, from rooftop unit services to letting contractors in, come to 196 work orders and 328 hours a year. Requests are bigger: about 25 a week, 1,250 a year, averaging 1.5 hours each with travel.

328 hPlanned work a year
1,875 hRequests a year
5,400 hHours on site
3 people × 1,800 hours
41%Taken by both
2,203 of 5,400 hours

Projects, tenant moves, snow, parts runs and driving take most of the rest.

The planned work, routine by routineEleven routines, 196 work orders: 328 hours a year
Planned routine How many Times a year Hours each Hours a year
Rooftop unit service 9 units 4 1.5 54
Boiler check in heating season 1 7 1 7
Life safety walk: extinguishers, exits, emergency lights 3 buildings 12 1.5 54
Emergency lights, 90-minute test 3 buildings 1 3 9
Generator run 1 12 1 12
Building walk-through 3 buildings 12 2 72
Roof inspection 3 roofs 2 2 12
Gutters and roof drains 3 roofs 2 3 18
Heating and cooling changeovers 3 buildings 2 6 36
Parking lot and grounds check 3 lots 12 0.5 18
Contractor visits: let in, escort, read the report 12 visits 1 3 36
Total 196 work orders 328

The planned work is about 6% of the team’s hours, yet it is the part that slips, because a request always has a person waiting and a roof inspection never does. So give it fixed days: the life safety walk on the first Monday of the month in each building, the rooftop units in the second week of each quarter, the roof in the second week of April and October. Requests fill the rest of the week.

How Maintensor fits a building team

The facility maintenance software page shows this setup in a demo office building:

  • Buildings. Each is a location, with its floors, suites and mechanical rooms inside it.
  • Equipment. Four identical rooftop units can be one asset with four units, each with its own status and its own work.
  • Planned routines. Each is a work order set to repeat, and when one is completed the next is created on its schedule.
  • Contractors. A contractor’s report can be attached to the work order as a PDF.
  • Requests. Staff and tenants are invited as requesters, free on every plan, and report a problem from their phone’s browser. An admin turns each request into a work order or declines it with a reason. On Pro and Max, a requester who scans the QR label on a piece of equipment or a room gets Report a problem with it filled in.

What it does not do

Requesters need that invitation: there is no public form, and a request carries no photo. It does not read meters or building controls, track energy use, or certify any inspection. It records what was done, when and by whom.

Questions

What people also ask.

More in the blog, or see the whole product on the features page.

What is the difference between facility maintenance and facility management?

Facility management is the wider job of running a building for the people in it: space, leases, cleaning, security, energy, moves and budgets. Facility maintenance is the part that keeps the building and its equipment working: services, inspections and repairs. In a small organization one person often does both, which is why the two terms get mixed up.

What does a facility maintenance technician do?

A facility maintenance technician answers repair requests and does the planned work in a building: changing filters and belts, fixing plumbing and lighting, checking the roof and drains, testing emergency lights and extinguishers, and letting contractors in for the work they are licensed to do. On a small team the same person often clears snow and sets up rooms too.

How often should a commercial roof be inspected?

The National Roofing Contractors Association recommends inspecting a roof at least twice a year, preferably in spring and fall, and again after severe weather such as a hailstorm, tornado or hurricane. Building staff who know the roof and follow safe access practices can do the routine inspections; otherwise hire a roofing contractor. Write down what you find and take photos each time.

Should facility maintenance be done in-house or by contractors?

Small teams usually do both. Keep in-house the work that comes every week and needs no license: filters, lamps, minor plumbing, inspections and requests. Contract the work that needs a license, a certification or special equipment, or that comes once a year: fire alarm and sprinkler testing, elevators, refrigerant work, paving and large roof repairs.