Fire door inspection checklist

A fire door inspection checks what NFPA 80 asks of every fire door at least once a year: a readable label, no holes, gaps within limits, and a door that closes and latches on its own.

Free, no sign-up. Print it, or type into the Word file.

By MaintensorUpdated

Page 1 of the blank fire door inspection checklist: the door and visit, the 13 yearly NFPA 80 items and the five checks of the monthly walk, each with a box for OK and Fail and a line for a note, then the defects and sign-off.

The checks, yearly and monthly

One sheet per door, checked from both sides. A qualified person does the yearly inspection; anyone on your crew who knows what a fire door is supposed to do can do the monthly walk. A door that fails is fixed the same day or gets a work order, and repairs keep to the door’s listing.

The yearly inspection13 checks

  • 1. Labels on the door and frame clearly visible and legible
  • 2. No open holes or breaks in the door or frame
  • 3. Glazing, vision light frames and glazing beads intact and fastened, where fitted
  • 4. Door, frame, hinges, hardware and noncombustible threshold secured, aligned and working, with no visible damage
  • 5. No missing or broken parts
  • 6. Clearances within limits (see below)
  • 7. The closer works: the door closes completely from fully open
  • 8. On pairs with a coordinator, the inactive leaf closes before the active one
  • 9. Latching hardware engages and holds the door shut
  • 10. No auxiliary hardware that stops the door working
  • 11. No field changes that void the label
  • 12. Edge protection, gaskets and edge seals present and intact, where required
  • 13. Signs on the door within the limits NFPA 80 sets

The monthly walk5 checks

  • Door closed, or held open only by a device that releases on the fire alarm
  • Open it fully and let it go: it closes and latches on its own
  • Nothing stored in the swing of the door
  • Label still visible; no new holes, damage or signs
  • Hold-open devices, where fitted: door releases when the device is tested
What counts as a fail, check by checkThe full tables, and where the 13 yearly items come from.

The yearly items are the ones NFPA 80 lists for swinging doors, in its 2013 and later editions, in plain words. Its 2007 text listed eleven of them; the 2013 edition added the first and last, as a Fire and Smoke Containment Association presentation by a Door and Hardware Institute educator shows.

The yearly inspection

Check Fail if
1. Labels on the door and frame clearly visible and legible Painted over, removed, or worn so the rating cannot be read
2. No open holes or breaks in the door or frame Holes left from removed hardware, a dent that has split the skin, a broken frame
3. Glazing, vision light frames and glazing beads intact and fastened, where fitted Cracked glass, loose beads, ordinary glass put in as a replacement
4. Door, frame, hinges, hardware and noncombustible threshold secured, aligned and working, with no visible damage Loose hinge screws, a sagging door, a frame pulled from the wall
5. No missing or broken parts Missing screws, strike plate, closer arm or cover
6. Clearances within limits (see below) Any gap over the limit
7. The closer works: the door closes completely from fully open Stops short, slams, or needs a push
8. On pairs with a coordinator, the inactive leaf closes before the active one Leaves close out of order and do not latch
9. Latching hardware engages and holds the door shut The door can be pulled open without working the latch
10. No auxiliary hardware that stops the door working Kick-down holders, hooks, surface bolts, added locks that are not part of the listing
11. No field changes that void the label Cut-outs, welding, a bigger hole for an access reader, trimming beyond what the listing allows
12. Edge protection, gaskets and edge seals present and intact, where required Torn or missing gasket or seal
13. Signs on the door within the limits NFPA 80 sets Signs fastened with screws, or covering too much of the face

The monthly walk

In the US, common practice between yearly inspections, not a rule. In Canada, where a province follows the National Fire Code, it is a rule: see below. It takes a minute a door.

Check Fail if
Door closed, or held open only by a device that releases on the fire alarm Wedged, tied, propped with a chair or held on a kick-down holder
Open it fully and let it go: it closes and latches on its own Stops short or does not latch
Nothing stored in the swing of the door Carts, boxes or furniture in the way
Label still visible; no new holes, damage or signs Paint on the label, a new hole, a taped-up notice that hides it
Hold-open devices, where fitted: door releases when the device is tested Does not release; test it with whoever services your fire alarm

The gaps NFPA 80 allows

Measure with the door closed. These are the limits in NFPA 80’s 2007 text for swinging doors; the door’s listing and later editions can add to them.

Under the door3/4 inch (19 mm) at most, to the floor, floor covering or threshold.
Under a door whose bottom is more than 38 inches (965 mm) above the floor3/8 inch (9.5 mm) at most.
Top and vertical edges to the frame, steel doors1/8 inch (3 mm), plus or minus 1/16 inch (1.6 mm).
Top and vertical edges to the frame, wood doors1/8 inch (3 mm) at most.
Between the meeting edges of a pairSame as the top and edges, by door type.

ExampleA fire door log

One line per door, per inspection. These lines are made up.

Door Location Rating on label Label legible Gap under door Closes and latches Deficiency Fixed
FD-201 Stair A, level 2 90 min Yes 5/8 in. Yes None
FD-202 Stair A, level 3 90 min Painted over 1/2 in. Yes Label painted Ask the lab about a field label
FD-214 Corridor, east wing 20 min Yes 7/8 in. No Gap over 3/4 in., latch misses strike Strike adjusted; door bottom on order

FD-202. The label is painted over, so the fix is to ask the lab about a field label.

FD-214. The gap under the door is over 3/4 inch and the latch misses the strike. The strike was adjusted, and a door bottom is on order.

What not to do

The most common deficiencies are things people did to the door, not things that wore out. The Fire and Smoke Containment Association presentation lists painted or missing labels, wide gaps, kick-down holders and wedges, missing fasteners and holes left by removed hardware among the top ones.

Do not wedge it, hook it or tie it openUse a listed hold-open that releases on the alarm, or keep it shut.
Do not drill it for new hardwareBeyond what NFPA 80 allows on site, which is limited to small round holes for surface-applied hardware and similar jobs. Larger cut-outs, welding or holes for an access reader need the maker or the labeling lab.
Do not fill holes with auto-body filler or foamHoles left by removed hardware are closed with steel fasteners that fill them or another method NFPA 80 allows.
Do not paint the labelsMask them when the door is painted.
Do not screw signs to the doorSigns go on with adhesive, never on the fire-rated glass, and NFPA's inspection form limits them to 5 percent of the door's area.
Do not add a kick plate, lock or closerUnless it is suitable for fire doors.

Before you start

Who inspects
The yearly inspection is for a qualified person, in-house or contracted. The monthly walk is for anyone on your crew who knows what a fire door is supposed to do.
Which doors
Swinging fire doors with builders hardware, with a fire rating label on the edge of the door and the frame. Rolling, sliding and other fire doors have their own list and drop tests: leave those to a trained door technician. Smoke doors follow NFPA 105.
Let it go
Open every door fully and let it go: a door that only closes from halfway is a fail.

When a door fails

NFPA 80 calls for repairs to be made without delay. A door that will not close or latch is no longer a fire door, so fix it the same day if you can; if you cannot, make a High priority work order and ask your fire marshal whether the opening needs a fire watch or other measure meanwhile.

Repairs have to keep to the door’s listing: replacement parts must be suitable for fire doors, and some fixes need the door maker or the lab whose label is on it.

This list is a starting point. It does not replace NFPA 80, the door and hardware makers’ instructions, or a qualified inspector, and your fire code decides which edition applies.

Add it to an inspection calendar

Put these checks, and the rest of the building's, on a year plan with the usual minimums for the United States or Canada, then print it or add it to your calendar: open the inspection calendar with fire doors ticked.

Who requires it

NFPA 80, the standard for fire doors and other opening protectives, sets the yearly inspection and test. It applies through the fire and building codes your state, province or city adopts, in the edition they adopt.

What the rules sayThe section by edition, health care, the record to keep, and Canada.
  • The section. The yearly inspection and test is section 5.2.1 in the 2007 and 2010 editions of NFPA 80.
  • Health care. CMS’s memo S&C 17-38-LSC requires every fire door assembly to be inspected and tested each year in line with the 2010 edition.
  • The record. It is signed by the inspector and kept for the authority having jurisdiction. Since 2013, NFPA 80 has asked for the records to be kept for at least three years.
  • NFPA’s form. NFPA’s own inspection form for the 2019 edition, posted by South Carolina’s State Fire Marshal, asks for the date, the facility, the inspector’s name, company and signature, each door’s location or number, and the deficiencies found.
  • Canada. Your province’s fire code sets the rules for doors in fire separations.
  • The National Fire Code of Canada. Its 2020 edition, which provinces adopt or follow, asks for doors in fire separations to be operated at least once a month (2.2.2.4(3)), and for self-closing doors without hold-open devices to be checked shut every 24 hours (2.2.2.4(2)). It sets no yearly inspection like NFPA 80’s; your province may.

This is information, and a signed record does not make a door compliant; only a door that closes and latches does that.

Fire door inspections in Maintensor: one asset, up to 100 doors

Make one asset for the fire doors and give it the doors as units, up to 100 on one asset. Units share the asset’s location, so name each by its number and place (“FD-201 Stair A L2”). One yearly job then creates a work order per door, with the checklist, and each door keeps its own history and status.

  • The 13 items as one procedure. Inspection checks for the items, Number steps for the gaps (“Gap under door, inches, max 0.75”), a Photo step for the label, then a Text step for the inspector’s name and a Signature step. The monthly walk is a second procedure on a monthly repeat.
  • A door that fails gets a note and a photo before the inspector can move on, then a follow-up work order, and Mark asset down for that one door. A doors-by-number list ticked in twenty minutes is pencil whipping, and a photo per failed door is the cheapest cure.
  • An outside inspector. Attach their report to the work order, and turn each deficiency into a follow-up work order so it does not wait a year.
The Units tab of a CNC machine: ten bays, each with its last service date, one marked Down and one In maintenance.
How units look, here on a CNC machine with ten bays rather than doors: each unit has its last service date, and one is marked Down and one In maintenance.

On Pro and Max, each door can carry its own QR label, printed from the Assets list; scanning it with a phone’s camera opens that door’s record, with its open work. What it does not do: the Signature step stores the drawn signature and the time, not which user signed, so the name step matters when a contractor inspects. Only Admins and Full users answer checklists, so an in-house inspector needs a seat.

Each work order’s history shows who completed it and when; it certifies nothing. The facility maintenance software page shows the rest of the building’s setup.

Questions

What people also ask.

More in the checklists, or see the whole product on the features page.

How often do fire doors need to be inspected?

NFPA 80 requires fire door assemblies to be inspected and tested at least once a year, with a written record signed by the inspector. It applies where your fire code or building code adopts it, which is common; in health care, the Centers for Medicare and Medicaid Services requires it. A short monthly walk by your own crew between inspections catches wedges and broken closers sooner.

Who is allowed to inspect fire doors?

The 2013 and later editions of NFPA 80 ask for a qualified person: someone with a recognized degree, certificate, professional standing or skill who, by knowledge, training and experience, can deal with the work. Earlier editions asked for someone who understands the operating parts of that type of door. Ask your authority having jurisdiction whether it expects a certified fire door inspector.

What is the maximum gap under a fire door?

For swinging fire doors, NFPA 80 allows at most 3/4 inch (19 mm) between the bottom of the door and the floor or threshold, and 1/8 inch (3 mm) at the top, the sides and between a pair of doors, with a tolerance of 1/16 inch either way for steel doors. The door's own listing can be stricter, so check its label and the maker's instructions.

Can a fire door be propped open?

Not with a wedge, a kick-down holder, a hook or a chair. A fire door may be held open only by a device that lets it close and latch on its own when the fire alarm or a smoke detector trips. Wedged fire doors and kick-down holders are among the most common problems inspectors find.

Run one building through it.

Start the trial, add one building with its floors, rooftop units and boiler, and invite the people who report problems as requesters, free on every plan.

30-day free trial. No credit card.