Fire extinguisher inspection checklist

A fire extinguisher inspection is a monthly visual check of each portable extinguisher: in its place, unblocked, gauge in the green, pin and seal on, full and undamaged, and the month and initials recorded.

Free, no sign-up. Print it, or type into the Word file.

By MaintensorUpdated

The blank monthly fire extinguisher inspection log, one landscape page: the building, month and inspector, a line for each extinguisher with its checks, initials and a note, then the four checks made once for the area, each with a box for OK and Fail.

What the log holds

One landscape page for a building or an area, each month: who inspected and when, a line for each extinguisher with OK or Fail for each check, and four checks made once for the whole area. The Excel file has forty lines and OK or Fail lists.

In place, reachableAt its marked spot, mounted, and not blocked by stock, carts or pallets.
Gauge green or weight fullThe needle in the green band; a unit with no gauge, such as carbon dioxide, weighed against its label.
Pin and sealBoth on. A missing pin or a broken seal means it may have been used.
No damage, label outNo dents, rust, leaks, cracked hose or clogged nozzle; the operating instructions readable and facing out.
Annual tag currentThe last annual maintenance within 12 months.
InitialsWith the month and year at the top, the record NFPA 10 asks for.

NFPA 10 lets the monthly record live on a tag on the extinguisher, on a checklist kept on file, or in an electronic record (7.2.4.1.1). A log by area makes the month’s fails easy to see.

ExampleOctober in a warehouse: four extinguishers

A made-up warehouse, with Kevin Brooks walking.

Number Location Type and size In place, reachable Gauge green or weight full Pin and seal No damage, label out Annual tag current Initials Note or action taken
FE-01 Dock 1, by the door ABC, 10 lb OK OK OK OK OK KB
FE-02 Dock 4 ABC, 10 lb OK OK Fail OK OK KB Seal missing. Swapped with spare; sent for service
FE-03 Battery charging ABC, 20 lb Fail OK OK OK OK KB Blocked. Pallet moved during the walk
FE-07 Maintenance shop CO2, 10 lb OK OK OK OK OK KB No gauge: weighed. Weight matches label

FE-02. A missing seal means it may have been used, so a charged spare went up before the unit went for service.

FE-03. A pallet blocked it and was moved during the walk; the Fail stays on the log with what was done. All four annual tags come due in March.

The checks for each area

Once a month, the walker also checks the area as a whole: how far anyone walks to an extinguisher, whether the types match the hazards, and the spare.

Each area, once a month4 checks

  • No one walks more than 75 ft (22.9 m) to an extinguisher for ordinary combustibles
  • An extinguisher within 50 ft (15.2 m) of each flammable liquid area
  • The class on each label matches the hazard nearby
  • A charged spare on hand
What counts as a fail, check by checkThe full tables, with the NFPA 10 or OSHA section behind each check.

The NFPA 10 section numbers are from the 2013 edition, as NFPA’s own extract of it lists them; later editions renumber some.

Monthly inspection, each extinguisher

Check Fail if Source
In its place Missing, moved, or not at its marked spot NFPA 10 7.2.2(1); OSHA 1910.157(c)(4)
Visible and reachable Blocked by stock, carts or pallets; hidden behind a door or post with no sign NFPA 10 7.2.2(2); OSHA 1910.157(c)(1)
Pressure gauge Needle outside the green (operable) band NFPA 10 7.2.2(3)
Full Light when you lift it, or below the weight on its label when weighed (units with no gauge, such as carbon dioxide) NFPA 10 7.2.2(4)
Pin and tamper seal Pin missing or seal broken: it may have been used NFPA 10 7.2.2.2(2); practice everywhere
Damage Dents, rust, leaks, a cracked hose, a clogged nozzle NFPA 10 7.2.2.2(3)
Label Operating instructions worn off or facing the wall NFPA 10 7.2.2.2(1)
Wheeled units Tires, wheels, carriage, hose or nozzle damaged NFPA 10 7.2.2(5)
Push-to-test indicator On a non-rechargeable unit, the indicator does not show pressure NFPA 10 7.2.2(6)
Mounting Bracket loose, or the unit standing where it can be kicked over OSHA 1910.157(c)(1)
Service tag Last annual maintenance more than 12 months ago OSHA 1910.157(e)(3)
Record Month, year and initials not recorded NFPA 10 7.2.4.1.2

NFPA 10 (2013) asks for the label, seal and damage checks where extinguishers face damage, corrosion, heat or a history of fires. They take seconds, so most crews do them on every extinguisher, every month.

Once a month for each area

Check Fail if Source
Distance, ordinary combustibles Anyone would walk more than 75 ft (22.9 m) to reach an extinguisher for Class A fires OSHA 1910.157(d)(2)
Distance, flammable liquids More than 50 ft (15.2 m) from a Class B hazard area to an extinguisher OSHA 1910.157(d)(4)
Right type The class on the label does not match the hazard nearby OSHA 1910.157(d)(1)
Spare No charged spare on hand to swap for a failed unit Practice

Extinguishers are one line of the monthly safety inspection checklist; fire doors have their own fire door inspection checklist.

The yearly service and the shell tests

The service company marks the test on the extinguisher; your job is to know which units come due this year.

Every monthA visual inspection, no more than 31 days apart.
Every yearA maintenance check by a trained technician, with the date recorded.
Every 6 yearsStored-pressure dry chemical units that need a 12-year test are emptied and serviced.
Every 5 or 12 years, by typeA hydrostatic test of the shell.
The yearly service, the 6-year service and the test intervalsWho may service them, the records to keep, and OSHA's Table L-1.

Every year, each extinguisher gets a maintenance check. Stored-pressure units do not need an internal examination at this check. The employer records the date and keeps the record for one year after the last entry or for the life of the shell, whichever is less (1910.157(e)(3)).

Who does it. A trained person with the maker’s service manual, the right tools and the maker’s parts (NFPA 10 7.1.2.2). NFPA’s notes list factory training, certification by an organization your authority accepts, or a state or local license as ways a technician qualifies, and your authority may require one of them.

The preventive maintenance checklist lists this yearly service beside the other fire and life safety tests.

Every 6 years, stored-pressure dry chemical extinguishers that need a 12-year hydrostatic test are emptied and given the applicable maintenance. Non-refillable disposable units are exempt, and the 6-year count restarts after a recharge or a hydrostatic test (1910.157(e)(4)).

The hydrostatic test. The shell is tested under water pressure by a trained person with the right equipment (1910.157(f)(1)), after an internal and external examination ((f)(3)). OSHA’s Table L-1 sets the intervals:

Extinguisher type Test every
Stored-pressure water or antifreeze, cartridge-operated water, wetting agent 5 years
Foam or soda acid with a stainless steel shell; AFFF; loaded stream 5 years
Dry chemical with a stainless steel shell 5 years
Carbon dioxide 5 years
Dry chemical, stored pressure, mild steel, brazed brass or aluminum shell 12 years
Dry chemical, cartridge or cylinder operated, mild steel shell 12 years
Halon 1211 and Halon 1301 12 years
Dry powder, cartridge or cylinder operated, mild steel shell 12 years

A shell that shows new corrosion or damage is tested again before its date, unless the damage is one of the kinds in (f)(2), such as pitting or a burn in a fire, that rule out a test and take the unit out of service ((f)(4), (f)(14)).

The test record gives the date, the tester’s signature and the serial number, and is kept until the next test or until the unit leaves service ((f)(16)).

Before you start

Who inspects
Anyone trained to do it: a maintenance technician, a facilities lead, a safety coordinator. The yearly service and the shell tests belong to a trained extinguisher technician.
How often
Monthly, as OSHA requires (29 CFR 1910.157(e)(2)). NFPA 10, the standard for portable extinguishers, sets no more than 31 days, and daily or weekly checks where conditions call for more.

When a check fails

Take the extinguisher off its hook, put a charged spare of the same type in its place, and write a work order for the service company. An extinguisher missing from its spot with no spare is a fail you fix before you walk on.

OSHA requires “alternate equivalent protection” while an extinguisher is away for maintenance or recharging (1910.157(e)(5)), and NFPA 10 calls for immediate corrective action.

This list is a starting point to adapt with the extinguisher maker’s manual, the edition of NFPA 10 your fire code adopts, and your fire inspector. It is information, not a substitute for training or for the service company.

Add it to an inspection calendar

Put these checks, and the rest of the building's, on a year plan with the usual minimums for the United States or Canada, then print it or add it to your calendar: open the inspection calendar with fire extinguishers ticked.

In Canada

Each province and territory adopts its own fire code. British Columbia’s 2018 code, for one, required portable extinguishers to be inspected, tested and maintained to NFPA 10 (BC Fire Code 2018, Division B, 6.2.1.1); a 2024 edition replaced it in March 2024, so read the current text. Check which code and which NFPA 10 edition apply where you are.

Monthly extinguisher rounds in Maintensor

Most building teams walk extinguishers by floor or area, and facility maintenance software can carry the same round. In Maintensor, build one procedure per area and attach it to a work order that repeats monthly; when it is completed, the next one is created on its schedule with the checklist blank.

  • The steps. A Heading for each extinguisher (FE-01, Dock 1), an Inspection check for “in place, visible, reachable”, another for “gauge in the green, pin and seal on, no damage”, and a Photo step of the gauge.
  • On a date, not a weekday. Choose “On a date” rather than “On a weekday”: the first Monday of one month to the first Monday of the next can be 35 days, past NFPA 10’s 31. A made-up count: 14 extinguishers at about 2 minutes each is a half-hour walk, so give the work order a 30-minute estimate.
  • A Fail on any check asks for a note and a photo before the next step, and offers a follow-up work order for the service company. The yearly service becomes a work order repeating yearly, with a File step for the service company’s report.
The work order list filtered to recurring work: a daily forklift inspection due today, then two monthly services, a weekly lubrication and a quarterly check due this week.
The work order list filtered to recurring work: a daily inspection, monthly services and a quarterly check, each with its due date.

What it does not do: there is no ready-made checklist library, so you type it once from this page. An extinguisher here is a heading in its area’s checklist, not a record, so it has no QR label of its own (labels, on Pro and Max, are for assets, parts and locations), and the app prints no inspection tags. Only Admins and Full users answer checklists, so whoever walks needs a user seat.

NFPA 10 allows an electronic record, but ask your fire inspector whether one kept in an app is accepted where you are. Maintensor records what was checked; it certifies nothing.

Questions

What people also ask.

More in the checklists, or see the whole product on the features page.

How often do fire extinguishers need to be inspected?

Every month, by a visual inspection, which NFPA 10 says may be no more than 31 days apart. Every year, a maintenance check by a trained technician, with the date recorded. Every 6 years, stored-pressure dry chemical units that need a 12-year test are emptied and serviced. And every 5 or 12 years, by type, the shell is hydrostatically tested.

Who can do the monthly fire extinguisher inspection?

Anyone trained in what to look for, such as a maintenance technician, a facilities lead or a safety coordinator. NFPA's notes say the monthly check needs only minimal knowledge. The yearly maintenance, recharging and hydrostatic tests are for trained technicians with the maker's service manual, and your state, province or city may require them to be licensed or certified.

What do you write on the fire extinguisher tag each month?

The month and year of the inspection and the initials of the person who did it. NFPA 10 lets that record live on a tag attached to the extinguisher, on a checklist kept on file, or in an electronic record. Many sites keep the tag and a log, because the tag is what a fire inspector looks at first.

What should you do if an extinguisher fails inspection?

Take it out of service and put a charged spare of the same type in its place straight away, then send the failed one to your service company. OSHA requires equivalent protection while an extinguisher is away for maintenance or recharging. A non-rechargeable unit that fails its gauge or fullness check is taken out of use for good.

How long must fire extinguisher records be kept?

OSHA requires the annual maintenance record to be kept for one year after the last entry or for the life of the shell, whichever is less. Hydrostatic test records are kept until the extinguisher is tested again or taken out of service. Your fire code may ask for more, so check it.