Safety inspection checklist for a plant, warehouse or building

A safety inspection checklist is the list a supervisor or safety lead walks once a month to find hazards before they hurt someone: a blocked exit, a missing guard, a cut cord, an eyewash nobody has run.

Free, no sign-up. Print it, or type into the Word file.

By MaintensorUpdated

Page 1 of the blank safety inspection checklist: the building or area and visit, then the checks of walking and working surfaces, exits and emergency routes, fire protection and electrical, each with a box for OK and Fail and a line for a note.
Page 1 of 3

The checks, area by area

One sheet per walk, through ten areas. Every fail becomes a fix on the spot or a work order. It is a starting point, to cut and add to for your site with your own rules, your insurer and the equipment makers’ manuals.

Walking and working surfaces6 checks

  • Floors
  • Trip hazards
  • Open sides and edges
  • Guardrails
  • Stairs
  • Pits and openings

Exits and emergency routes6 checks

  • Exit routes
  • Exit doors
  • Exit signs
  • Doors that look like exits
  • Width
  • Emergency lights

Fire protection5 checks

  • Extinguishers
  • Sprinklers
  • Fire doors
  • Flammable liquids
  • Alarm pull stations

Electrical6 checks

  • Panel clearance
  • Covers
  • Labels
  • Extension cords
  • Cords and plugs
  • Disconnects

Machine guarding and lockout8 checks

  • Guards
  • Belts, pulleys, shafts
  • Fans
  • Fixed machines
  • Bench grinders
  • Emergency stops
  • Air for cleaning
  • Lockout

Chemicals6 checks

  • Labels
  • Safety data sheets
  • Storage
  • Gas cylinders
  • Battery charging
  • Spill kits

Personal protective equipment3 checks

  • At hand
  • Condition
  • Hazard assessment

First aid, eyewash and showers3 checks

  • First aid kit
  • Eyewash and showers
  • Emergency numbers

Ladders2 checks

  • Portable ladders
  • Damaged ladders

Housekeeping, storage and lighting6 checks

  • Aisles
  • Stacks
  • Storage areas
  • Racking
  • Forklifts
  • Lighting
What counts as a fail, check by checkThe full tables for the ten areas, with the OSHA section behind each check.

In the tables, a section number is OSHA’s general industry rule (29 CFR 1910); “Practice” means common good practice with no single rule behind it.

1. Walking and working surfaces

Check Fail if Source
Floors Spill, oil, water or loose material on a walkway, with no cleanup, mat or drain 1910.22(a)
Trip hazards Cord or hose across a walkway, curled mat, broken floor plate, hole 1910.22(a)(3)
Open sides and edges Mezzanine, platform or edge 4 ft (1.2 m) or more above a lower level with no guardrail or other protection 1910.28(b)(1)
Guardrails Top rail loose, missing, or lower than 39 in. (99 cm) 1910.29(b)(1)
Stairs Loose or broken tread; a flight of 4 or more risers with no handrail 1910.25, 1910.28(b)(11)
Pits and openings Open pit, tank or floor opening with no cover or guardrail 1910.176(g)

2. Exits and emergency routes

Check Fail if Source
Exit routes Anything stored in a route to an exit, even for an hour 1910.37(a)(3)
Exit doors Locked, chained, or needs a key or tool to open from inside 1910.36(d)(1)
Exit signs Missing, unlit, or hidden behind stock 1910.37(b)
Doors that look like exits Not marked “Not an Exit” or with what they are 1910.37(b)(5)
Width Exit access narrower than 28 in. (71 cm) at any point 1910.36(g)(2)
Emergency lights Lamp does not light when the test button is held Practice; your fire code sets the tests

3. Fire protection

Check Fail if Source
Extinguishers Missing, blocked, gauge out of the green, pin or seal gone, no record of last month’s check 1910.157(c)(1), (e)(2); NFPA 10 for the gauge, seal and record
Sprinklers Storage within 18 in. (46 cm) of the deflectors; heads painted, damaged or hung with anything 1910.159(c)(10) for the 18 in.; practice for the rest
Fire doors Wedged open, or does not close and latch by itself 1910.37(a)(4)
Flammable liquids Open containers; more outside a flammable storage cabinet or room than allowed (where use is incidental: 25 gal of Category 1, 120 gal of Category 2 to 4 per fire area) 1910.106(e)(2)(ii)
Alarm pull stations Blocked or hidden Practice

The fire extinguisher inspection checklist and the fire door inspection checklist go further.

4. Electrical

Check Fail if Source
Panel clearance Anything stored in the working space in front of a panel: at least 3 ft (0.9 m) deep, more in some layouts above 150 V to ground 1910.303(g)(1)
Covers Panel open with live parts exposed, missing knockout, junction box without a cover 1910.305(b)
Labels Breaker or disconnect not marked with what it feeds 1910.303(f)
Extension cords Used as permanent wiring, or run through a wall, ceiling or doorway 1910.305(g)(1)(iv)
Cords and plugs Cut jacket, missing ground pin, taped repair, cord pulled from the plug 1910.334(a)(2)
Disconnects Cannot take a lock in the off position 1910.303(f)(4)

5. Machine guarding and lockout

Check Fail if Source
Guards Missing, open or bypassed at a point of operation, nip point or rotating part 1910.212(a)(1)
Belts, pulleys, shafts Exposed within 7 ft (2.1 m) of the floor or platform 1910.219
Fans Blades lower than 7 ft with guard openings over 1/2 in. (13 mm) 1910.212(a)(5)
Fixed machines Not anchored; walks or rocks in use 1910.212(b)
Bench grinders Work rest more than 1/8 in. (3 mm) from the wheel, or top guard more than 1/4 in. (6 mm) 1910.215(a)(4), (b)(9)
Emergency stops Machine does not stop when tested as the maker’s manual says Practice
Air for cleaning 30 psi (207 kPa) or more, or no chip guard and PPE 1910.242(b)
Lockout No locks and tags at hand; machine serviced with no written procedure; yearly inspection overdue 1910.147(c)(4), (c)(6)

Our guide to writing a lockout tagout procedure covers the written procedure and the yearly inspection.

6. Chemicals

Check Fail if Source
Labels Container with no label, including a spray bottle filled from a drum, unless it is for the immediate use of the person who filled it 1910.1200(f)(6), (f)(8)
Safety data sheets Missing, or nobody on shift can find them 1910.1200(g)(8)
Storage Incompatibles together; open or leaking containers Practice; section 7 of each SDS
Gas cylinders Stored where they can be knocked over; cap off on a cylinder not in use; oxygen within 20 ft (6.1 m) of fuel gas with no 5 ft (1.5 m) fire-rated barrier 1910.253(b)(2), (b)(4)(iii)
Battery charging No way to flush and neutralize spilled electrolyte; poor ventilation 1910.178(g)(2)
Spill kits Missing or used up Practice

7. Personal protective equipment

Check Fail if Source
At hand Required PPE for the area missing, or not in sizes that fit 1910.132(a)
Condition Cracked face shield, torn gloves, damaged hearing protection in use 1910.132(e)
Hazard assessment No written certification for the area 1910.132(d)(2)

8. First aid, eyewash and showers

Check Fail if Source
First aid kit Items missing against its contents list 1910.151(b); its non-mandatory Appendix A points to ANSI Z308.1 for contents
Eyewash and showers None where corrosives are used; not run this week; path blocked 1910.151(c); the weekly run is ANSI/ISEA Z358.1
Emergency numbers Not posted by phones and first aid stations Practice

The eyewash station inspection checklist has the weekly and yearly checks.

9. Ladders

Check Fail if Source
Portable ladders Cracked rail, loose or missing rung, missing feet, label gone 1910.23(b)(9): inspected before first use each shift
Damaged ladders Still in use, not tagged “Dangerous: Do Not Use” 1910.23(b)(10)

10. Housekeeping, storage and lighting

Check Fail if Source
Aisles Blocked or damaged 1910.176(a)
Stacks Leaning, unbanded or stacked higher than is stable 1910.176(b)
Storage areas Piled debris or cardboard, signs of pests 1910.176(c)
Racking Bent upright, missing beam lock, no load sign Practice; see the warehouse safety checklist
Forklifts A truck in use not examined before use today, or after each shift where trucks run around the clock 1910.178(q)(7); the rule asks for the check, a written record is practice
Lighting Lamps out on an exit route, stair or work area 1910.37(b)(1) for exit routes; practice elsewhere

After the walk

Sort what you found into three piles: fixed during the walk, fix this week, fix at the next shutdown. Count fails by area each month.

ExampleTwo months of walks

Made-up numbers.

The first month. 50 checks, 7 fails: 2 fixed on the spot, 5 work orders.

The next month. 4 fails, 2 of them the same blocked exit route. A repeat find means the fix was a cleanup, not a cause removed, so it is a conversation with the shift that stores pallets there, not another work order.

Before you start

Who walks
A supervisor or safety lead, walking with someone who works in the area. Rotate the walkers from month to month.
How often
Monthly is the common rhythm, with operators doing their own daily checks in between.
What it does not replace
Training, or the inspections qualified people make of electrical, fire protection and lifting equipment.

When a check fails

If it can hurt someone now, deal with it before you walk on: clear the exit, tag the ladder, stop the machine. Otherwise take a photo and write a work order with a priority and an owner.

What OSHA and the provinces expect

Federal OSHA does not set one general walk-through for general industry; it sets intervals for particular things, and asks for walking-working surfaces to be inspected “regularly and as necessary” (1910.22(d)(1)). Some provinces require the inspection itself.

What the rules sayOntario's monthly inspection, British Columbia's regular inspections, and the other provinces.
  • Ontario. The health and safety representative or a worker member of the committee must inspect the workplace at least once a month, or, where that is not practical, part of it each month and all of it at least once a year (Ontario’s guide to the Act, sections 8 and 9).
  • British Columbia requires regular inspections at intervals that prevent unsafe conditions (OHS Regulation 3.5).
  • Other provinces have their own rules.

This is information, not legal advice.

The safety walk in Maintensor: one procedure for all ten areas

Build the walk-through once as a procedure and attach it to a work order that repeats monthly, on a date or on a weekday such as the first Tuesday, assigned to the person who walks. When the work order is completed, the next one is created with the checklist blank.

  • The steps. A Heading for each of the ten areas, an Inspection check for each line with the “fail if” in its words, a Photo step where a picture settles an argument, and a Signature at the end. One procedure holds up to 350 steps and headings, so the whole walk fits in one.
  • A Fail on any check asks for a note and a photo before moving on, then offers a follow-up work order and, when the work order is on an asset, Mark asset down.
  • Reporting. On Pro and Max, an Admin can see inspection check results in Reporting.
Run mode on a failed check: Fail is chosen for the pulley alignment, the finding is written, a photo is asked for, and a follow-up work order is offered.
A failed check on the walk: the finding written down, a photo asked for, and a follow-up work order offered.

What it does not do: there is no ready-made checklist library, and procedures cannot be imported, so this page is the source you type from. Only Admins and Full users answer checklists, so whoever walks needs a user seat. Maintensor records what was found and fixed; it certifies nothing.

Questions

What people also ask.

More in the checklists, or see the whole product on the features page.

How often should a workplace safety inspection be done?

Once a month is the common rhythm for a full walk-through, with operators doing their own daily checks in between. Federal OSHA sets inspection intervals for particular equipment, such as ladders before each shift and extinguishers monthly, rather than one general walk. In Ontario, the health and safety representative or a worker member of the committee must inspect the workplace at least once a month, or part of it each month and all of it each year where monthly is not practical.

Who should do the safety inspection?

A supervisor or safety lead, walking with someone who works in the area and knows where the problems hide. Rotate who walks so the same eyes do not get used to the same hazards. Electrical, fire protection and lifting equipment still need their own inspections by qualified people; a walk-through spots problems, it does not replace those.

What should happen to a failed check?

Anything that can hurt someone now is dealt with during the walk: clear the exit, tag the ladder out of service, stop the machine with the missing guard. Everything else gets a work order with a photo, a priority and an owner the same day, and next month's walk checks that it was fixed.

Does OSHA have its own safety inspection checklist?

No single federal OSHA rule prescribes one monthly safety checklist for general industry. The general industry rules say what must be true, such as exits clear, guards in place and containers labeled, and for some equipment how often to inspect. The checks below are built from the sections they cite. Your state plan, province, insurer and equipment makers may add more.