Warehouse safety checklist

A warehouse safety checklist is a walk of the whole building on a set day each month: aisles and floor marking, racking, forklift traffic, docks, charging areas, exits and fire protection, lighting, housekeeping and PPE.

Free, no sign-up. Print it, or type into the Word file.

By MaintensorUpdated

Page 1 of the blank warehouse safety checklist: the warehouse or area and visit, then the checks of aisles, floors and storage, racking, forklift traffic and pedestrians, and docks and trailers, each with a box for OK and Fail and a line for a note.
Page 1 of 2

The checks, area by area

Pick a set day each month, such as the first Tuesday, and walk the whole building: every aisle, the back corners, the docks, the charging room, the mezzanine. Each line names what a fail looks like, so a fail becomes a repair job instead of a note.

Aisles, floors and storage6 checks

  • Aisles and passageways
  • Floor marking
  • Floor surface
  • Floor stacks
  • Low clearances
  • Open pits and edges

Racking7 checks

  • Uprights
  • Beams
  • Base plates and anchors
  • Load plaques
  • Upright and end-of-aisle protectors
  • Pallets in the rack
  • Storage under sprinklers

Forklift traffic and pedestrians8 checks

  • Cross aisles and blind corners
  • Following distance
  • Under raised forks
  • Riders
  • Unattended trucks
  • Fire aisles, stairways, fire equipment
  • Light for driving
  • Daily examination

Docks and trailers5 checks

  • Trailer being loaded
  • Uncoupled trailer
  • Trailer floor
  • Open dock door, no trailer
  • Portable dock plates

Charging and fueling6 checks

  • Charging area
  • Spill, fire and ventilation
  • Eyewash
  • Smoking and sparks
  • Refueling
  • PPE at the charger

Exits, fire protection and first aid6 checks

  • Exit routes
  • Exit signs and lighting
  • Exit doors
  • Fire extinguishers
  • Fire doors
  • First aid

Lighting, electrical and housekeeping5 checks

  • Lights
  • Electrical panels
  • Cords
  • Housekeeping
  • Empty pallet stacks

PPE2 checks

  • Hazard assessment
  • What people wear
What counts as a fail, check by checkThe full tables, area by area, with the OSHA rule behind each check.

Where an OSHA rule sits behind a check, the last column cites it.

Aisles, floors and storage

Check What counts as a fail Rule
Aisles and passageways Pallets or stock left in an aisle; too little room for trucks to pass or turn 1910.176(a)
Floor marking Permanent aisles not marked, or lines worn away 1910.176(a)
Floor surface Holes, broken joints, spills, loose stretch wrap or banding 1910.22(a)
Floor stacks Leaning, crushed bottom layer, not stable against sliding or collapse 1910.176(b)
Low clearances No warning sign 1910.176(e)
Open pits and edges No cover or guardrail 1910.176(g)

Racking

Check What counts as a fail
Uprights Dents, bends, creases or twists; out of plumb past the maker’s limit
Beams Bent or sagging; beam locks or safety pins missing
Base plates and anchors Anchor missing, loose or sheared off
Load plaques Missing, or a load heavier than the plaque allows
Upright and end-of-aisle protectors Missing or crushed
Pallets in the rack Broken pallets, loads hanging off the beams
Storage under sprinklers Within 18 inches (46 cm) of the sprinkler heads, the minimum in 1910.159(c)(10)

Forklift traffic and pedestrians

Every line here comes from 1910.178.

Check What counts as a fail Paragraph
Cross aisles and blind corners Drivers not slowing and sounding the horn (n)(4)
Following distance Trucks closer than about three truck lengths, or over the site’s speed limit (n)(1)
Under raised forks Anyone standing or walking under them (m)(2)
Riders Anyone riding a truck with no seat for them, or on the forks (m)(3)
Unattended trucks Forks up, controls not in neutral, power on, brake off (m)(5)
Fire aisles, stairways, fire equipment Blocked by a truck or a load (m)(14)
Light for driving Where general lighting is less than 2 lumens per square foot (about 22 lux), trucks without their own lights (h)(2)
Daily examination A truck in use with no examination that shift (q)(7)

Docks and trailers

Check What counts as a fail Rule
Trailer being loaded Brakes not set, no wheel chocks and no restraint holding it 1910.178(k)(1), (m)(7)
Uncoupled trailer No trailer stand where one is needed to stop it upending 1910.178(k)(3)
Trailer floor Not checked for breaks before a truck drives in 1910.178(m)(7)
Open dock door, no trailer Nothing across the opening Practice; see 1910.28 for edges
Portable dock plates Not secured, no handholds, not rated for the load 1910.26

Charging and fueling

Check What counts as a fail Rule
Charging area Batteries charged outside the marked area 1910.178(g)(1)
Spill, fire and ventilation No means to flush and neutralize spilled electrolyte, no fire protection, chargers not guarded from trucks, ventilation off 1910.178(g)(2)
Eyewash None within the work area, or blocked 1910.151(c)
Smoking and sparks No-smoking rule not posted or not kept; open flame or sparks near chargers 1910.178(g)(10), (g)(11)
Refueling Engine running while the tank is filled 1910.178(p)(2)
PPE at the charger Face shield, apron and gloves missing Practice

Exits, fire protection and first aid

Check What counts as a fail Rule
Exit routes Anything stored in them, even for a day 1910.37(a)(3)
Exit signs and lighting Sign missing, not lit, or the route too dark to see 1910.37(b)
Exit doors Locked, chained or needing a key from the inside 1910.36(d)(1)
Fire extinguishers Blocked, missing, or the monthly inspection not done 1910.157(c)(1), (e)(2)
Fire doors Wedged open, or do not close and latch Practice and fire code
First aid Supplies not readily available, no one trained where no clinic is near 1910.151(b)

The fire extinguisher inspection checklist has the monthly extinguisher check in full.

Lighting, electrical and housekeeping

Check What counts as a fail Rule
Lights Fixtures out in aisles, at docks or over stairs Practice
Electrical panels Stock or pallets in the working space in front of them 1910.303(g)(1)
Cords Run across aisles, damaged, or chained power strips Practice
Housekeeping Wrap, banding, broken pallets or trash piling up where it is a trip or fire hazard 1910.176(c)
Empty pallet stacks Leaning, or stacked higher than your site allows Practice

PPE

Check What counts as a fail Rule
Hazard assessment No written certification of the PPE hazard assessment 1910.132(d)
What people wear High-visibility vests, safety shoes or gloves not worn where your assessment calls for them 1910.132(d)

Racking: inspections and a hit upright

The damage limits come from your rack maker. ANSI MH16.1 is the US standard for the design, testing and use of industrial steel storage racks, published by the Rack Manufacturers Institute (RMI), and RMI gives the inspection intervals and the warnings on repairs below.

A rack inspectionAt least once a year; more often, up to monthly, in high-traffic, narrow or previously damaged areas.
After a forklift collisionAn inspection right away. When an upright is hit, unload the bay and block it off.
RepairsNo in-house fixes without engineering approval; RMI does not recommend in-house welding.

Before you start

Who walks
A supervisor or safety lead, with one person from the floor who knows where the stock gets parked and which corner the trucks cut.
Daily checks first
This walk sits on top of the daily checks, not in place of them: the forklift inspection before each shift, the dock leveler checks, ladders before each shift’s use, and, where you have them, the overhead crane’s start-of-shift check and the scissor lift’s pre-start inspection.
Traffic and storage
OSHA’s warehousing page says the most common warehouse injuries are musculoskeletal disorders and being struck by forklifts, which is why traffic and storage get the most lines.

When a check fails

Some fails cannot wait for a work order: a blocked exit, a crushed rack upright, a leaking battery. Fix them or block the area off before you walk on. Everything else becomes a work order with a priority and a due date, the same day.

Add what your building has and this list does not (cold storage, hazardous materials, conveyors), and check your local fire code and your insurer’s list.

The monthly warehouse walk in Maintensor

Build the walk as one procedure, with a Heading step for each area above and an Inspection check (Pass, Flag, Fail) for each line. Put it on a work order for the building’s location rather than an asset, and set it to repeat monthly on a weekday, such as the first Tuesday.

  • A failed line asks for a note and a photo, then offers a follow-up work order, whose description starts with the walk’s number and the failed step. After the walk, the Checklist tab offers one follow-up for every failed or flagged step; only that one is marked “From a failed inspection step”, a filter in the work order list.
  • Reporting. On Pro and Max, an Admin’s Reporting shows an inspection checks card: how many checks passed, were flagged or failed on work orders completed in the period, filtered by location if you have more than one building. A walk that passes every line, every month, in a busy warehouse, is worth a second look; pencil whipping explains why.
  • Between walks. Give shift leads a Requester sign-in, free on every plan, so a hazard is reported in one line, with how urgent it is and where.
The Report a problem form filled in: a flickering dock light, marked Soon, with a line of detail and a Send to maintenance button.
The Report a problem form filled in: a flickering dock light, marked Soon, with a line of detail and a Send to maintenance button.

What it does not do: the app has no ready-made safety checklist, so this page is the source you type in once, and whoever answers the walk needs a Full user or Admin seat.

“Mark asset down” appears only when the work order is on an asset, so keep the things you would take out of service, such as a rack run or a dock plate, as assets with their own checks. How the rest of a warehouse runs in the app is on the page for warehouse maintenance software.

Questions

What people also ask.

More in the checklists, or see the whole product on the features page.

How often should a warehouse safety inspection be done?

OSHA does not set one interval for a walk of the whole warehouse. Single items have their own: forklifts are examined at least daily before use, ladders before first use in each shift, and portable fire extinguishers get a monthly visual inspection. A monthly walk of the building is a sensible base, with the busiest areas, such as rack aisles near the dock, looked at more often.

What are the biggest hazards in a warehouse?

OSHA's warehousing page names powered industrial trucks, ergonomics, material handling, hazardous chemicals, slips, trips and falls, and robotics, and says the most common injuries are musculoskeletal disorders and being struck by forklifts. That is why forklift traffic, racking and floors take up most of a warehouse walk.

What should you do when pallet racking is damaged?

Unload the damaged bay, block it off so nothing goes back in, and have the rack maker or a rack engineer decide whether to repair or replace it. The Rack Manufacturers Institute warns against in-house fixes without engineering approval, does not recommend in-house welding, and recommends an inspection right after any forklift collision.

Who should do the warehouse safety walk?

A supervisor or safety lead, with one person who works the floor. The supervisor knows what the rules ask; the floor worker knows where the stock gets parked and which corner the trucks cut. Rotate the floor person each month so more people learn to see the hazards.

Put your trucks and dock doors on a schedule.

Start the trial, add your forklifts as one asset with a unit for each truck, attach the daily check, and a failed check offers a follow-up work order on the spot.

30-day free trial. No credit card.