Ladder inspection checklist

A ladder inspection checklist lists what to check on stepladders, extension, fixed and rolling warehouse ladders before each shift's first use, and the defects that get a ladder tagged "Dangerous: Do Not Use" until it is repaired or replaced.

Free, no sign-up. Print it, or type into the Word file.

By MaintensorUpdated

Page 1 of the blank ladder inspection checklist: the ladder and visit, then the checks for every ladder, stepladders, extension and straight ladders and fixed ladders, each with a box for OK and Fail and a line for a note.
Page 1 of 2

The checks, by type of ladder

One sheet per ladder: the person about to climb checks the first card and the card for their type of ladder, and the periodic walk uses the same cards. A ladder that fails is tagged out of service and gets a work order. Start from the maker’s labels on each ladder (duty rating and instructions) and adapt the list.

Every ladder, every shift9 checks

  • Side rails
  • Rungs, steps and cleats
  • Metal rungs and steps
  • Surfaces
  • Wood ladders
  • Metal ladders
  • Feet and shoes
  • Labels
  • How it is being used

Stepladders3 checks

  • Spreaders or locks
  • Legs
  • Top cap and pail shelf

Extension and straight ladders6 checks

  • Rung locks
  • Rope and pulley
  • Guide brackets
  • Swivel feet
  • Side rails near electrical work
  • Set-up, when used to reach a landing

Fixed ladders7 checks

  • Rungs
  • Brackets and anchors
  • Clearance behind the rungs
  • Clearance on the climbing side (no cage)
  • Rails or grab bars at the top
  • Roof hatch
  • Cage, well or ladder safety system

Rolling warehouse ladders6 checks

  • Casters and locks
  • Handrails
  • Top step guard
  • Steps
  • Frame
  • Capacity label
What counts as a fail, check by checkThe full tables, and the rule behind each check.

The Rule column gives the paragraph of OSHA 29 CFR 1910.23 that a check comes from, unless it names another section. “Practice” means common practice, and “Maker” means the ladder maker’s labels and instructions.

Every ladder, every shift

Check What counts as a fail Rule
Side rails Bent, cracked, split, dented, buckled or burned (b)(10)
Rungs, steps and cleats Loose, bent, cracked or missing; not level, parallel and evenly spaced (b)(1)
Metal rungs and steps Slip-resistant surface worn smooth (c)(1)
Surfaces Burrs, sharp edges, splinters, sticking-out rivets; oil, grease or paint on the steps (b)(7); practice for slick steps
Wood ladders Painted or coated so cracks would be hidden (b)(5)
Metal ladders Corrosion (b)(6)
Feet and shoes Missing, worn through or loose Practice
Labels Duty rating or instruction labels missing or unreadable Maker
How it is being used As a plank, a brace or a shelf (b)(8)

Stepladders

Check What counts as a fail Rule
Spreaders or locks Missing, bent, or do not hold the front and back open (c)(2)
Legs Wobble, loose rivets, a leg shorter than the others Practice
Top cap and pail shelf Cracked, loose or missing Practice

Extension and straight ladders

Check What counts as a fail Rule
Rung locks Do not engage fully, or do not hold the fly section Practice
Rope and pulley Frayed rope, seized or cracked pulley Practice
Guide brackets Bent, loose or missing Practice
Swivel feet Missing, seized or worn through Practice
Side rails near electrical work Metal or other conductive rails where the ladder or its user could touch exposed energized parts; 1910.333(c)(7) calls for nonconductive rails there (c)(7) of 1910.333
Set-up, when used to reach a landing Rails do not reach at least 3 feet (0.9 m) above the landing (c)(11)

Fixed ladders

Check What counts as a fail Rule
Rungs Loose, bent, worn, corroded or iced (b)(1), (b)(6)
Brackets and anchors Loose, cracked welds, pulling out of the wall (d)(1)
Clearance behind the rungs Stock, pipe or equipment closer than 7 inches (18 cm) behind them (d)(2)
Clearance on the climbing side (no cage) Pallets or racking within 30 inches (76 cm) of the rungs (d)(13)
Rails or grab bars at the top Bent, loose or missing, so there is nothing to hold at the landing (d)(4), (d)(7)
Roof hatch Does not open far enough or stay open (d)(9)
Cage, well or ladder safety system Bent cage hoops, a damaged carrier rail or sleeve, a harness or lanyard not inspected before the shift 1910.28(b)(9), 1910.140(c)(18)

A fixed ladder that rises more than 24 feet (7.3 m) needs fall protection. Ladders installed on or after November 19, 2018 need a ladder safety system or personal fall arrest; older ones may keep a cage or well until November 18, 2036, when every one of them needs a ladder safety system or personal fall arrest.

Rolling warehouse ladders

In OSHA’s terms these are mobile ladder stands, covered by 1910.23(e).

Check What counts as a fail Rule
Casters and locks The stand rolls when someone stands on it, or the lock or step-down brake does not hold (e)(1)(vii), (e)(1)(viii)
Handrails Missing or loose on a stand whose top step is 4 feet (1.2 m) or higher (e)(1)(v)
Top step guard Top step above 10 feet (3 m) not protected on three sides by a handrail (e)(2)(ii)
Steps Slip-resistant surface worn smooth or peeling (e)(1)(ii)
Frame Bent members, cracked welds, loose bolts Practice
Capacity label Missing or unreadable Maker

The out-of-service tag

A ladder with a structural or other defect is tagged at once, under 1910.23(b)(10). OSHA’s tag rule, 1910.145, asks for two things on the tag; the third is practice.

Signal wordDanger, readable from at least 5 feet (1.5 m).
Major messageDo Not Use: the rule's words are "Dangerous: Do Not Use", or similar words.
Date and nameWhen it was tagged, and by whom.

Before you start

Every shift
The look the rule asks for: before a ladder’s first use in each work shift, the person about to climb checks it, in under a minute.
The periodic walk
Common practice, not a rule: once a month or a quarter, maintenance or the safety lead checks every numbered ladder. It finds the ladders nobody uses, the ones that went missing, and the aluminum ladder leaning near an open electrical panel.
Training first
Under 1910.30(b), employers train each employee in the care, inspection and use of ladders before they use them.

When a check fails

Tag the ladder at once on a rail at eye level, write the date and your name on the tag, and carry it to a set quarantine spot so the next shift does not grab it. A fixed ladder cannot be carried away, so block it off. Then write a work order for the repair or the replacement.

A portable ladder that will not be repaired is cut up or crushed before it goes in the dumpster, so nobody pulls it back out.

The rule is 1910.23(b)(9): a ladder is inspected before its first use in each work shift, and more often as needed, for visible defects that could hurt someone. A ladder with a defect is removed from service until it is repaired or replaced.

What the rules sayFixed ladders, repairs, and the rules in Canada.
  • Fixed ladders. A fixed ladder cannot be carried away, so 1910.22(d)(2) asks for the hazard to be guarded until the repair is made. A repair to its structure is done or supervised by a qualified person.
  • Canada. Provinces set their own ladder rules, and CSA Z11 is the national standard for the design, testing and marking of portable ladders. Check the rule for your province and the maker’s instructions.

Ladder walks in Maintensor: 20 ladders as units on two assets

Leave the per-shift look out of the app: it takes seconds, it is done by everyone who climbs, and the rule does not ask for it to be recorded. Put the periodic walk in, where it earns its keep.

  • Each ladder a unit. A made-up warehouse keeps its 14 portable ladders and 6 rolling ladders as two assets with units, L-01 to L-14 and R-01 to R-06. Two jobs make a work order for each of the 20 ladders, each with the inspection attached, repeating monthly, and the asset’s Units tab shows every ladder’s last check.
  • A fail marks one ladder Down. The app asks for a note and a photo, then offers a follow-up work order and “Mark asset down”, which marks that one ladder Down until it is repaired or retired.
  • Between walks. A shift lead with a Requester sign-in (free on every plan) can tag a damaged ladder and report it with Report a problem, as how requests from the floor work explains. A technician with a user seat writes the work order directly.
The Units tab of a CNC machine: ten bays, each with its last service date, one marked Down and one In maintenance.
The Units tab of an asset with ten units, here the bays of a CNC machine: each has its last service date, and one is marked Down. A set of numbered ladders works the same way.

Answering the walk takes a Full user or Admin seat. Done as one work order on the building, with a step per ladder, the walk loses the per-ladder status: a work order with no asset on it offers the follow-up work order but not “Mark asset down”. The warehousing page shows how the app fits a warehouse.

Questions

What people also ask.

More in the checklists, or see the whole product on the features page.

How often should ladders be inspected?

OSHA 29 CFR 1910.23(b)(9) requires ladders to be inspected before initial use in each work shift, and more often as necessary, for visible defects that could cause injury. That check is done by the person about to climb. A monthly or quarterly walk of every ladder by maintenance or the safety lead is worth adding: no rule requires it, but it catches ladders that nobody owns.

Do ladder inspections have to be documented?

1910.23 does not ask for a written record of the per-shift inspection. A record of a periodic walk is still useful: it shows which ladders were checked, when and by whom, and which were taken out of service. Your company policy, an insurer or a customer audit may ask for one, so check before you decide.

Can a damaged ladder be repaired?

OSHA allows a defective ladder to be repaired, under 1910.22(d), or replaced. A repair that involves structural integrity must be done or supervised by a qualified person, and the ladder stays tagged out until then. For a portable ladder with a bent or cracked rail, replacing it is usually the simpler answer; follow the maker's instructions either way.

What should a ladder out-of-service tag say?

1910.23(b)(10) asks for "Dangerous: Do Not Use" or similar words. Under OSHA's tag rule, 1910.145(f), a tag carries a signal word such as Danger, readable from at least five feet (1.5 m), and a major message such as Do Not Use, both understandable to everyone who could pick up the ladder. Add the date and who tagged it.