Eyewash station inspection checklist

An eyewash station inspection is the weekly run of each plumbed unit and the yearly check of every unit against ANSI/ISEA Z358.1: reachable within 10 seconds, tepid water, at least 0.4 gallons (1.5 liters) a minute for 15 minutes.

Free, no sign-up. Print it, or type into the Word file.

By MaintensorUpdated

Page 1 of the blank eyewash station inspection checklist: the station and visit, then the weekly checks for plumbed units, the checks for self-contained units and the annual inspection, each with a box for OK and Fail and a line for a note.
Page 1 of 2

The checks, weekly and yearly

One sheet per station and visit: the weekly card for a plumbed unit or the one for a self-contained unit, and the annual card once a year. A failed check gets a work order. Adapt the list with the unit maker’s manual.

Plumbed eyewash, eye/face wash and showers9 checks

  • Path
  • Sign
  • Nozzle covers
  • Activation
  • Flow
  • Run until clear
  • Temperature
  • Drain
  • Shower

Self-contained units7 checks

  • Fluid level
  • Fluid date
  • Fluid
  • Seals and covers
  • Condition
  • Placement
  • Path and sign

Annual inspection, every unit13 checks

  • Installation
  • 10 seconds
  • Same level
  • Sign and light
  • Spray pattern
  • Flow rate
  • Shower flow
  • Temperature
  • Valve
  • Height
  • Mixing valve
  • Self-contained capacity
  • People
What counts as a fail, check by checkThe full tables, and where each weekly check comes from.

The Source column of the weekly tables says where each check comes from: ANSI/ISEA Z358.1, the maker’s instructions, or common practice (“Practice”). The annual table says how to make each check instead.

Plumbed eyewash, eye/face wash and showers

Check Fail if Source
Path Anything stored in the way, or the unit hidden Z358.1 location requirement
Sign Missing, or not visible from where the hazard is Z358.1
Nozzle covers Missing, or do not come off when the water starts Z358.1
Activation Valve does not open with one push or pull, or does not stay open hands-free Z358.1
Flow Weak, uneven between the two nozzles, or not a steady stream Practice; the maker’s manual
Run until clear Water still rusty, cloudy or smelly after flushing the unit and the pipe feeding it Z358.1 weekly activation
Temperature Hot or ice cold to the hand (then read it with a thermometer) Practice
Drain Water floods the floor or backs up Practice
Shower Pull rod out of reach, or no flow (use a shower tester where there is no floor drain) Z358.1; practice

The standard’s publisher says plumbed units are activated weekly “for a period long enough to verify operation” and to make sure flushing fluid is there, which also clears sediment and stale water from dead-end pipe. It is not a 15-minute test.

Self-contained units

Check Fail if Source
Fluid level Below the fill line or sight gauge mark Maker’s instructions
Fluid date Past the change date on the unit, cartridge or log Maker’s instructions
Fluid Cloudy, discolored, or anything growing in it Maker’s instructions
Seals and covers Cartridge seal broken; nozzle covers off Maker’s instructions
Condition Leaks or cracks in the tank or lines Practice
Placement In a spot that freezes or bakes, with no heater blanket or shade Practice
Path and sign As for plumbed units Z358.1

The standard calls for a visual check of every self-contained unit, done to the maker’s instructions, to see whether its fluid needs changing or topping up.

Annual inspection, every unit

Check How Fail if
Installation Compare with the maker’s installation sheet Loose, modified, or not as installed
10 seconds Walk from the hazard at a normal pace and time it More than 10 seconds
Same level Look at the route Not on the same level as the hazard: stairs between them
Sign and light Stand where the hazard is No highly visible sign; area poorly lit
Spray pattern The maker’s test gauge, or as the manual says Flow does not cover the gauge’s area or both eyes
Flow rate Run into a marked bucket for one minute Under 0.4 gal (1.5 L) for an eyewash, 3.0 gal (11.4 L) for an eye/face wash
Shower flow Shower tester into a container of known size, timed Under 20 gal/min (75.7 L/min)
Temperature Thermometer in the stream at the start and after several minutes Outside 60 to 100 °F (16 to 38 °C) at either reading
Valve Push it on and let go Takes more than 1 second to open, or closes when let go
Height Tape measure from the floor Eyewash outside 33 to 53 in. (84 to 135 cm) above the floor, or under 6 in. (15 cm) from a wall or the nearest obstruction, as CCOHS gives the Z358.1 figures
Mixing valve Check the service date Maker’s service interval missed
Self-contained capacity Read the label Holds less than 15 minutes of flow (see the arithmetic below)
People Ask two people in the area They do not know where it is or how to hold their eyes open in it

The figures to test against

The same for an eyewash, an eye/face wash and an emergency shower, except the flow. They come from the Z358.1 publisher’s selection, installation and use guide, OSHA’s eyewash InfoSheet and CCOHS.

Minimum flowEyewash 0.4 gal/min (1.5 L/min); eye/face wash 3.0 gal/min (11.4 L/min); emergency shower 20 gal/min (75.7 L/min).
For at least15 minutes.
WaterTepid, 60 to 100 °F (16 to 38 °C).
ValveOn in 1 second or less, stays on without hands.
LocationWithin 10 seconds of the hazard (about 55 ft, 17 m), same level, clear path, sign, good light.

ExampleThe arithmetic of a flow test

These numbers are made up to show the working.

  • Eyewash, bucket test. One minute fills the bucket to 0.55 gal. That is above 0.4, so it passes. Over a full 15-minute flush it would deliver 0.55 x 15 = 8.25 gal (31 L): water the floor drain or a bucket has to take.
  • Self-contained capacity. At the minimum 0.4 gal/min, 15 minutes needs 0.4 x 15 = 6 gal (22.7 L). A unit holding less than 6 gal cannot deliver the minimum for 15 minutes.
  • Shower, timed container. A 5-gallon container fills in 12 seconds: 5 ÷ 12 x 60 = 25 gal/min, above 20, so it passes. A full 15-minute drench at the minimum is 20 x 15 = 300 gal (1,136 L), which is why showers without a floor drain are tested with a tester and a container rather than run to the floor.

ExampleA weekly log

Week of Unit Location Ran until clear Stays on hands-free Covers on Path and sign Initials Notes
Oct 19 EW-1 Battery charging Yes Yes Yes OK CR
Oct 19 EW-2 Chemical store Yes Yes One missing OK CR Cover ordered
Oct 19 SH-1 Caustic wash bay Yes Yes n/a Pallet in path CR Moved during check

EW-2. One nozzle cover was missing, a fail on the weekly check; a new cover was ordered.

SH-1. A pallet stood in the path to the shower. It was moved during the check, and the log still records it.

Before you start

Who
The weekly run: a maintenance technician or a trained person who works in the area. The annual inspection: maintenance or the safety lead.
What to bring
For the annual inspection, a bucket marked in gallons or liters, a timer, a thermometer and a tape measure.
How often
Weekly for plumbed units, on the schedule in the maker’s instructions for self-contained units, and yearly for every unit.

When a check fails

An eyewash that will not flow, delivers hot or ice-cold water, or cannot be reached is out of service. Put a sign on it and write a work order at once.

If it cannot be fixed the same day, stop work with the corrosive in that area or bring in another unit that meets the standard; a squeeze bottle is not a replacement.

This list is a starting point to adapt with the unit maker’s manual, ANSI/ISEA Z358.1, your plumbing code and the rule where you are. It is information, not a substitute for a hazard assessment or for training the people who may need the eyewash.

Add it to an inspection calendar

Put these checks, and the rest of the building's, on a year plan with the usual minimums for the United States or Canada, then print it or add it to your calendar: open the inspection calendar with eyewash stations ticked.

What the rules ask

In the US, OSHA 29 CFR 1910.151(c) requires suitable facilities for quick drenching or flushing of the eyes and body wherever someone may be exposed to injurious corrosive materials. OSHA has not adopted ANSI Z358.1 and does not enforce it, but points employers to it as guidance on what suitable means.

What the rules sayOSHA's rule in full, the standard's edition, the states and plumbing codes, and Canada.
  • OSHA. The facilities are within the work area, wherever someone’s eyes or body may be exposed. Battery charging areas need facilities for flushing and neutralizing spilled electrolyte (1910.178(g)(2)). OSHA has “often referred employers” to Z358.1 as guidance (OSHA interpretation, 2002).
  • The standard. The current edition is ANSI/ISEA Z358.1-2014 (R2020). The publisher’s guide notes that some states require Z358.1 equipment, as do the model plumbing codes (International Plumbing Code section 411, Uniform Plumbing Code section 416).
  • Canada. There is no national standard of its own; CCOHS uses Z358.1 as its guide and tells readers to check their province’s legislation.

The weekly eyewash round in Maintensor: one procedure, every station

In manufacturing plants the eyewashes are scattered across the floor, so the weekly run works best as one round: a procedure with a Heading for each station, on a work order repeating weekly on a chosen weekday. A round not done by its due date shows under Overdue on the work order list.

  • Each station. A Checkbox for “ran until clear”, an Inspection check for “valve stays on, covers on, path and sign clear”, and a Photo step where a fault needs showing.
  • The annual inspection. A second procedure on a work order repeating yearly: Number steps for the bucket reading and the two temperatures, each followed by an Inspection check, then a Signature step. A Number step has no unit or limit and flags nothing by itself, so write the limit into the step’s words.
  • A Fail asks for a note and a photo before the next step, then offers a follow-up work order and, when the station is an asset on the work order, Mark asset down.
Three answered steps of a checklist: a filter check passed, with the technician's note and a place to add a photo, a supply air temperature of 14 °C, and Yes chosen for a clear drain pan.
Three answered steps on an air handler checklist: a check passed with a note, a supply air temperature of 14 °C and Yes for a clear drain pan, the same kinds of step an eyewash round uses.

Only Admins and Full users answer checklists, so the area lead who runs the eyewashes needs a user seat. Maintensor has no flow or temperature sensors and no ready-made checklist library, and it records what was done; it certifies nothing.

Questions

What people also ask.

More in the checklists, or see the whole product on the features page.

How often should an eyewash station be checked?

Plumbed eyewashes, eye/face washes and showers are activated weekly to verify they work and to flush the line, as ANSI/ISEA Z358.1 calls for. Self-contained units get the visual check and fluid changes their maker's instructions set. Every unit, of either kind, gets a full inspection once a year against the standard, covering location, flow, temperature and the valve.

How long should you run an eyewash station each week?

Long enough to prove it works and to flush out all the water standing in the unit and in the branch pipe feeding it, until the water runs clear. The publisher of the standard says the weekly run is not meant to be a full 15-minute flow test, and that its length depends on the volume of water sitting in those pipes.

What temperature should eyewash water be?

Tepid, which ANSI/ISEA Z358.1 defines as 60 to 100 °F (16 to 38 °C). Water hotter than that can harm the eyes and speed some chemical reactions; colder water is hard to stand for the full 15 minutes. Where the cold supply runs below 60 °F, the standard's publisher lists thermostatic mixing valves, tankless heaters and heated tanks as ways to temper it.

Does OSHA require ANSI Z358.1?

OSHA has not adopted ANSI Z358.1 as a rule and does not enforce it. Its rule, 29 CFR 1910.151(c), requires suitable facilities for quick drenching or flushing where corrosive materials are used, and its interpretation letters point employers to Z358.1 as guidance on what suitable means. Some states and the model plumbing codes require Z358.1 equipment outright.

Can eyewash bottles replace an eyewash station?

No. Squeeze bottles and other personal wash units cannot deliver a 15-minute flush to both eyes at once, so the standard treats them as supplemental. They are useful for a first rinse on the way to the station, or where no station exists, but the plumbed or self-contained unit must still be within 10 seconds of the hazard.

Run one line's maintenance through it.

Start the trial, add the machines on one line with their recurring jobs and checklists, and let the crew close work from the floor on a phone.

30-day free trial. No credit card.