What is emergency maintenance?

Emergency maintenance is unplanned work that cannot wait: a failure that puts someone at risk, stops production or a building system with no way around it, or will cause serious damage within hours.

By MaintensorUpdated 10 min read

Key points

  • A yes to any of three questions makes it an emergency: danger, no workaround, or serious damage within hours.
  • Most work that breaks is not an emergency: it is corrective work that can be planned for tomorrow.
  • Every time: people first, make it safe, call, look before fixing, then fix, test and write it up.
  • Lockout has no exception for emergencies; in a rush, verifying the isolation is the step that gets skipped.
  • In the example quarter, six of nine emergencies came from two machines.

What counts as an emergency: a three-question test

A yes to any one of these three questions makes it an emergency.

Question 1Is someone in danger now, or will be if nobody acts? A smell of gas, exposed live wiring, a guard torn off a running machine, oil across a walkway, someone stuck in an elevator.Yes: it is an emergency.
Question 2Has something stopped that has no workaround? The only line that makes the order, the heat in an occupied building in winter, the water to a hotel wing, the only freezer holding product.Yes: it is an emergency. A spare, a second unit carrying the load, or another room to put the guest in is a workaround.
Question 3Will waiting a few hours cause serious damage? Water running through ceilings, product warming in a cooler, a pipe about to freeze and split.Yes: it is an emergency.

Three noes leave two kinds of work:

Urgent
It needs doing today or tomorrow. It goes to the top of the next free slot once the job in hand is done.
Routine
Everything else. It goes into the backlog to be planned like any other job.
What happened The call Why
A hydraulic hose on a press bursts, oil on the floor Emergency A slip hazard, and the press has stopped
One of two air compressors trips; the other carries the plant Urgent There is a workaround until the second one fails
A rooftop unit over an open-plan office fails in July Urgent, or an emergency if it cools a server room Depends on what it serves
A guest-room air conditioner rattles on high fan Routine, once the guest has another room Nothing is getting worse

Most work that breaks is not an emergency. It is corrective maintenance that can be planned for tomorrow. Among the types of maintenance, an emergency is corrective work that cannot wait. Equipment you chose to run to failure should fail into a planned swap, not a call-out.

The sequence, every time

Emergency work is written up after it is done, but the steps always run in this sequence. It starts with people and making the area safe, and it ends with a record of what failed and why, so the same emergency does not come back.

Fire, a gas leak or a chemical release: people out

When the event is a fire, a gas leak or a chemical release, your emergency action plan (how people evacuate, covered below) comes first: people out. This sequence covers what comes after, and the many failures where nobody needs to leave.

  1. People first. Get them clear, give first aid, call 911 if anyone is hurt.
  2. Make it safe. Stop the machine, isolate the energy, shut the water, block off the area.
  3. Call. The supervisor, then whoever your written response plan names.
  4. Look before fixing. What failed? Is it safe to work on? Is the part here?
  5. Decide how far to go. A full repair now, or a temporary fix to get running and a permanent repair planned for a better time.
  6. Fix, test and hand back to whoever runs the equipment or the space.
  7. Write it up before the end of the shift.

Lockout in a hurry

OSHA’s lockout/tagout rule, 29 CFR 1910.147, covers servicing and maintenance where an unexpected start-up or a release of stored energy could injure someone. It has no exception for emergencies. Its sequence is preparation, shutdown, isolation, applying the lock or tag, making stored energy safe, and verifying the isolation.

Verify before anyone reaches in

In a rush, verification is the step that gets skipped. Before anyone reaches in, make sure everyone is clear, try the start, return the control to Off and read the gauges: a dead start button says nothing about stored pressure.

The written procedure for each machine should be at the machine, not in a binder in the office. How to write a lockout/tagout procedure covers what goes in one. In Canada, your province, territory or the federal government sets the rule: check the one that applies to you.

Two cases need the specialist, not the crew:

Electrical faults
They are for a qualified electrician.
A smell of gas
Follow your gas company’s instructions. Connecticut’s utility regulator, for example, advises calling the gas company from a phone away from the smell, keeping everyone away, and not flipping light switches or using elevators.

If someone was hurt

Reporting rules apply. In the US, OSHA requires an employer to report a work-related death within 8 hours, and an in-patient hospitalization, amputation or loss of an eye within 24 hours. Provinces have their own reporting rules.

Emergency maintenance examples: a plant, a building, a hotel

All three are made up, and each ends with the change that keeps it from coming back.

A plant: a compressor at 2 a.m.

Air compressor 1 trips on high temperature, and the second cannot carry the packaging lines alone. The on-call technician locks it out, finds its cooler packed with dust, cleans it, and has it running 90 minutes later. It is the fourth trip this quarter, so cleaning the cooler goes on the monthly preventive job.

A building: no heat on a January Monday

The office building’s boiler has locked out. The building engineer follows the boiler maker’s instructions. When it locks out again after a reset, the engineer calls the boiler contractor rather than resetting it over and over. Tenants are told when heat should be back, and the pre-season boiler check is changed to cover what the contractor found.

A hotel: water through a ceiling at 11 p.m.

Water is coming through the ceiling of room 312. The engineer on duty shuts the supply valve to the room above, the front desk moves the guests, and a wet vacuum goes in. The cause is a braided supply line under the sink in room 412. The follow-up adds supply lines to the quarterly guest-room inspection and replaces those of the same age on that floor.

Why emergency work costs more than its repair

  • The week’s plan breaks. Scheduled jobs move, and preventive work is usually the first thing dropped, which sets up the next breakdown.
  • Parts are bought at any price, with any delivery charge.
  • People work late.
  • Hurry is when people skip steps: the lockout that is not verified, the temporary clamp that becomes permanent, the job nobody writes up.

Keep the word for real emergencies

A site where a third of the work orders say “emergency” has a priority scale nobody believes. Keep the word for the work that passes the test.

The first hour: a written response plan

Write the response plan before it is needed, on one page per site, and put it where the on-call person can find it at 2 a.m.:

  • Who is called, in which order, with phone numbers: the on-call technician, the supervisor, the manager.
  • Who can declare an emergency, stop a line or close an area.
  • Outside help with 24-hour numbers: the elevator, fire alarm, sprinkler and boiler contractors, an electrician, a water damage firm, the gas and power utilities.
  • Where the shutoffs are: water, gas and the main electrical disconnects, with a photo of each and a note on what it feeds.
  • Who tells the people affected: production, the front desk, tenants.

This is not your emergency action plan

In the US, OSHA’s rule on emergency action plans applies where another OSHA standard requires one. It covers how fires and other emergencies are reported, how people evacuate and how everyone is accounted for.

It must be written, except that an employer with 10 or fewer employees may communicate it orally.

When the event is a fire, a gas leak or a chemical release, that plan comes first: people out. The response plan covers what comes after.

What to write down afterwards

Write it the same shift, while people remember.

ExampleThe press with the burst hose, written up

A made-up example:

What to record Example
Asset Press 4, Line 2
Stopped and running again Stopped 9:40 a.m. Tuesday, running 12:15 p.m.
What was seen Pressure hose split at the crimp, about 3 gallons (11 L) of oil on the floor
What was done Area blocked off, spill kit used, press locked out. Hose replaced, run for 20 minutes, no leaks.
Temporary or permanent Permanent for this hose. The other three on the press are the same age.
Parts 1 hose assembly, 4 gallons (15 L) of hydraulic oil, absorbent pads
People and time Two technicians, 2 hours 30 minutes each
Outside help and cost None
Cause, if known Hose rubbing on the frame bracket. Original hose, never replaced.
Follow-up Work order to replace the other three at Saturday’s stop, and a clamp to hold them off the bracket

Watch the temporary fixes

A clamp on a leaking pipe or a jumper around a failed switch becomes permanent unless a follow-up work order exists, with a date and a name on it.

How to have fewer emergencies

Count them every month, by asset. A made-up quarter at a small plant:

The quarter, machine by machineNine emergencies on four assets, with what kept failing and what changed
Asset Emergencies What kept failing What changed
Air compressor 1 4 Tripped on high temperature Cleaning the cooler went on the monthly preventive job.
Press 4 2 Hydraulic hoses burst Old hoses replaced at a planned stop, a hose check added
Dock door 2 2 Knocked off its track by trailers New bumpers and a guide post. Not every cause is a maintenance fix.
Break room water heater 1 Tank leaked Replaced. Run to failure was the right call.

Six of nine, on two machines

Nine emergencies, six of them on two machines: air compressor 1 (four) and Press 4 (two). Fix those two and most of next quarter’s emergencies go with them.

  • Treat repeats as a cause to find. The same failure twice on the same asset needs a cause, not a third repair: root cause analysis.
  • Put a preventive task on the failure. An inspection for hose wear, a boiler check before the heating season.
  • Keep the critical spare on the shelf. The part whose delivery time turns a 2-hour repair into a 2-week stop.
  • Test the standby. A backup that has not run in a year is not a backup. The generator maintenance checklist has the weekly look and the monthly run under load.
  • Make early reports easy. An operator who reports a weeping fitting on Monday saves the burst hose on Friday, if the request process is one people will use.

Emergencies in Maintensor

There is no Emergency priority in Maintensor’s work order management software. A work order is None, Low, Medium or High, and its type of work is Reactive, Preventive or Other. An emergency is a High, Reactive work order, and a phone call.

The phone call is not optional: the app sends no text messages and no pages. On Pro and Max, the person assigned can get an email (“Work assigned to me”), and admins one for “New requests to review”. Each person can switch these off.

A requester can mark a request Urgent, but that only says how urgent it seemed: an admin sets the real priority when approving it.

What it records helps afterwards:

  • Downtime. Mark the asset Down, and back to Operational once it runs. The time counts from the moment it is marked, so mark it when it stops, not after the repair. Reporting, on Pro and Max for admins, shows unplanned downtime and the most problematic assets.
  • Time. When nobody had a hand free to press Start work, Add time puts the hours in afterwards.
  • Photos and cost. Photos go on the work order. On Max, a contractor’s call-out is added as a Contractor cost, with the receipt attached.
  • The permanent fix. Write it as a second work order with its own due date.
Reporting in Maintensor, the Assets view for the last 30 days: downtime, 72 reactive work orders, and the most problematic assets, led by the CNC machine.
Reporting's Assets view for the last 30 days: unplanned downtime, reactive work orders, and the assets that cause the most, each with its MTBF and repair cost.

What it does not measure

Reporting’s MTTR is how long reactive work orders stayed open, from creation (or their start date, if later) to completion. It is not hands-on repair time.

Questions

What people also ask.

More in the blog, or see the whole product on the features page.

What is the difference between emergency maintenance and corrective maintenance?

Corrective maintenance is any work that fixes a fault, and most of it can be planned and scheduled for a convenient day. Emergency maintenance is the small part of corrective work that cannot wait, because someone is at risk, an essential system has stopped, or damage is spreading. It is started at once, and the paperwork follows.

What is the difference between emergency and urgent maintenance?

An emergency is dropped everything for: a risk to people, a stop with no workaround, or damage that grows by the hour. Urgent work needs doing today or tomorrow but can wait for the job in hand to finish, usually because there is a spare, a workaround or no harm spreading. Most sites have far more urgent jobs than emergencies.

Is emergency maintenance the same as breakdown maintenance?

Not quite. Breakdown maintenance means letting equipment run until it fails and then repairing it, which can be a sound, planned choice for cheap or duplicated equipment. Such a failure is only an emergency if it puts people at risk, stops something essential or causes spreading damage. Many breakdowns can wait for a planned repair.

How do you reduce emergency maintenance?

Count emergencies each month by asset, and treat repeats as a problem to solve rather than a repair to repeat. Find the cause, add a preventive task or inspection for that failure, keep the critical spare part on the shelf, test standby equipment, and make it easy for operators and staff to report problems early, while they are still small.