Key points
- A yes to any of three questions makes it an emergency: danger, no workaround, or serious damage within hours.
- Most work that breaks is not an emergency: it is corrective work that can be planned for tomorrow.
- Every time: people first, make it safe, call, look before fixing, then fix, test and write it up.
- Lockout has no exception for emergencies; in a rush, verifying the isolation is the step that gets skipped.
- In the example quarter, six of nine emergencies came from two machines.
What counts as an emergency: a three-question test
A yes to any one of these three questions makes it an emergency.
Three noes leave two kinds of work:
| What happened | The call | Why |
|---|---|---|
| A hydraulic hose on a press bursts, oil on the floor | Emergency | A slip hazard, and the press has stopped |
| One of two air compressors trips; the other carries the plant | Urgent | There is a workaround until the second one fails |
| A rooftop unit over an open-plan office fails in July | Urgent, or an emergency if it cools a server room | Depends on what it serves |
| A guest-room air conditioner rattles on high fan | Routine, once the guest has another room | Nothing is getting worse |
Most work that breaks is not an emergency. It is corrective maintenance that can be planned for tomorrow. Among the types of maintenance, an emergency is corrective work that cannot wait. Equipment you chose to run to failure should fail into a planned swap, not a call-out.
The sequence, every time
Emergency work is written up after it is done, but the steps always run in this sequence. It starts with people and making the area safe, and it ends with a record of what failed and why, so the same emergency does not come back.
Fire, a gas leak or a chemical release: people out
When the event is a fire, a gas leak or a chemical release, your emergency action plan (how people evacuate, covered below) comes first: people out. This sequence covers what comes after, and the many failures where nobody needs to leave.
- People first. Get them clear, give first aid, call 911 if anyone is hurt.
- Make it safe. Stop the machine, isolate the energy, shut the water, block off the area.
- Call. The supervisor, then whoever your written response plan names.
- Look before fixing. What failed? Is it safe to work on? Is the part here?
- Decide how far to go. A full repair now, or a temporary fix to get running and a permanent repair planned for a better time.
- Fix, test and hand back to whoever runs the equipment or the space.
- Write it up before the end of the shift.
Lockout in a hurry
OSHA’s lockout/tagout rule, 29 CFR 1910.147, covers servicing and maintenance where an unexpected start-up or a release of stored energy could injure someone. It has no exception for emergencies. Its sequence is preparation, shutdown, isolation, applying the lock or tag, making stored energy safe, and verifying the isolation.
Verify before anyone reaches in
In a rush, verification is the step that gets skipped. Before anyone reaches in, make sure everyone is clear, try the start, return the control to Off and read the gauges: a dead start button says nothing about stored pressure.
The written procedure for each machine should be at the machine, not in a binder in the office. How to write a lockout/tagout procedure covers what goes in one. In Canada, your province, territory or the federal government sets the rule: check the one that applies to you.
Two cases need the specialist, not the crew:
If someone was hurt
Reporting rules apply. In the US, OSHA requires an employer to report a work-related death within 8 hours, and an in-patient hospitalization, amputation or loss of an eye within 24 hours. Provinces have their own reporting rules.
Emergency maintenance examples: a plant, a building, a hotel
All three are made up, and each ends with the change that keeps it from coming back.
A plant: a compressor at 2 a.m.
Air compressor 1 trips on high temperature, and the second cannot carry the packaging lines alone. The on-call technician locks it out, finds its cooler packed with dust, cleans it, and has it running 90 minutes later. It is the fourth trip this quarter, so cleaning the cooler goes on the monthly preventive job.
A building: no heat on a January Monday
The office building’s boiler has locked out. The building engineer follows the boiler maker’s instructions. When it locks out again after a reset, the engineer calls the boiler contractor rather than resetting it over and over. Tenants are told when heat should be back, and the pre-season boiler check is changed to cover what the contractor found.
A hotel: water through a ceiling at 11 p.m.
Water is coming through the ceiling of room 312. The engineer on duty shuts the supply valve to the room above, the front desk moves the guests, and a wet vacuum goes in. The cause is a braided supply line under the sink in room 412. The follow-up adds supply lines to the quarterly guest-room inspection and replaces those of the same age on that floor.
Why emergency work costs more than its repair
- The week’s plan breaks. Scheduled jobs move, and preventive work is usually the first thing dropped, which sets up the next breakdown.
- Parts are bought at any price, with any delivery charge.
- People work late.
- Hurry is when people skip steps: the lockout that is not verified, the temporary clamp that becomes permanent, the job nobody writes up.
Keep the word for real emergencies
A site where a third of the work orders say “emergency” has a priority scale nobody believes. Keep the word for the work that passes the test.
The first hour: a written response plan
Write the response plan before it is needed, on one page per site, and put it where the on-call person can find it at 2 a.m.:
- Who is called, in which order, with phone numbers: the on-call technician, the supervisor, the manager.
- Who can declare an emergency, stop a line or close an area.
- Outside help with 24-hour numbers: the elevator, fire alarm, sprinkler and boiler contractors, an electrician, a water damage firm, the gas and power utilities.
- Where the shutoffs are: water, gas and the main electrical disconnects, with a photo of each and a note on what it feeds.
- Who tells the people affected: production, the front desk, tenants.
This is not your emergency action plan
In the US, OSHA’s rule on emergency action plans applies where another OSHA standard requires one. It covers how fires and other emergencies are reported, how people evacuate and how everyone is accounted for.
It must be written, except that an employer with 10 or fewer employees may communicate it orally.
When the event is a fire, a gas leak or a chemical release, that plan comes first: people out. The response plan covers what comes after.
What to write down afterwards
Write it the same shift, while people remember.
ExampleThe press with the burst hose, written up
A made-up example:
| What to record | Example |
|---|---|
| Asset | Press 4, Line 2 |
| Stopped and running again | Stopped 9:40 a.m. Tuesday, running 12:15 p.m. |
| What was seen | Pressure hose split at the crimp, about 3 gallons (11 L) of oil on the floor |
| What was done | Area blocked off, spill kit used, press locked out. Hose replaced, run for 20 minutes, no leaks. |
| Temporary or permanent | Permanent for this hose. The other three on the press are the same age. |
| Parts | 1 hose assembly, 4 gallons (15 L) of hydraulic oil, absorbent pads |
| People and time | Two technicians, 2 hours 30 minutes each |
| Outside help and cost | None |
| Cause, if known | Hose rubbing on the frame bracket. Original hose, never replaced. |
| Follow-up | Work order to replace the other three at Saturday’s stop, and a clamp to hold them off the bracket |
Watch the temporary fixes
A clamp on a leaking pipe or a jumper around a failed switch becomes permanent unless a follow-up work order exists, with a date and a name on it.
How to have fewer emergencies
Count them every month, by asset. A made-up quarter at a small plant:
The quarter, machine by machineNine emergencies on four assets, with what kept failing and what changed
| Asset | Emergencies | What kept failing | What changed |
|---|---|---|---|
| Air compressor 1 | 4 | Tripped on high temperature | Cleaning the cooler went on the monthly preventive job. |
| Press 4 | 2 | Hydraulic hoses burst | Old hoses replaced at a planned stop, a hose check added |
| Dock door 2 | 2 | Knocked off its track by trailers | New bumpers and a guide post. Not every cause is a maintenance fix. |
| Break room water heater | 1 | Tank leaked | Replaced. Run to failure was the right call. |
Six of nine, on two machines
Nine emergencies, six of them on two machines: air compressor 1 (four) and Press 4 (two). Fix those two and most of next quarter’s emergencies go with them.
- Treat repeats as a cause to find. The same failure twice on the same asset needs a cause, not a third repair: root cause analysis.
- Put a preventive task on the failure. An inspection for hose wear, a boiler check before the heating season.
- Keep the critical spare on the shelf. The part whose delivery time turns a 2-hour repair into a 2-week stop.
- Test the standby. A backup that has not run in a year is not a backup. The generator maintenance checklist has the weekly look and the monthly run under load.
- Make early reports easy. An operator who reports a weeping fitting on Monday saves the burst hose on Friday, if the request process is one people will use.
Emergencies in Maintensor
There is no Emergency priority in Maintensor’s work order management software. A work order is None, Low, Medium or High, and its type of work is Reactive, Preventive or Other. An emergency is a High, Reactive work order, and a phone call.
The phone call is not optional: the app sends no text messages and no pages. On Pro and Max, the person assigned can get an email (“Work assigned to me”), and admins one for “New requests to review”. Each person can switch these off.
A requester can mark a request Urgent, but that only says how urgent it seemed: an admin sets the real priority when approving it.
What it records helps afterwards:
- Downtime. Mark the asset Down, and back to Operational once it runs. The time counts from the moment it is marked, so mark it when it stops, not after the repair. Reporting, on Pro and Max for admins, shows unplanned downtime and the most problematic assets.
- Time. When nobody had a hand free to press Start work, Add time puts the hours in afterwards.
- Photos and cost. Photos go on the work order. On Max, a contractor’s call-out is added as a Contractor cost, with the receipt attached.
- The permanent fix. Write it as a second work order with its own due date.

What it does not measure
Reporting’s MTTR is how long reactive work orders stayed open, from creation (or their start date, if later) to completion. It is not hands-on repair time.