Key points
- Corrective work fixes a fault once it is found; preventive work is done before a failure.
- Planned, scheduled, proactive and routine describe work; they are not types of their own.
- Run to failure looks like reactive work on the day; the difference is that someone chose it.
- In the made-up example, a quarterly service cuts one compressor's yearly cost from $11,960 to $4,950.
- A small crew can get by on four: calendar preventive work, corrective work, run to failure and a deferred list.
Every type in one line
| Type | What it is | What starts the work |
|---|---|---|
| Reactive | Fixing equipment after it breaks, with no plan made beforehand | A breakdown |
| Corrective | Restoring equipment once a fault is found, by a failure or by an inspection | A fault found |
| Emergency | Corrective work that cannot wait, because of danger or a stopped operation | A failure with serious consequences |
| Deferred | Work that was due and was put off to a later date | A decision, or a lack of money, people or a shutdown |
| Run to failure | A deliberate choice to do no preventive work on an item | The failure, by design |
| Preventive | Work done before failure to keep it from happening; the next three rows are its kinds | Most often a schedule |
| Time-based | Preventive work at fixed intervals of calendar time or run time | A date, or hours, miles or cycles |
| Condition-based | Work done when an inspection or a reading shows it is needed | A reading past its limit |
| Predictive | Condition-based work that uses instruments and trends to forecast a failure | A trend pointing to failure |
| Reliability-centered | A method that picks the right type for each function of each asset | An analysis |
| TPM and autonomous | Operators take on the routine care of their own machines, beside the crew | The operator’s shift |
Reactive and run to failure look alike on the day: something broke and someone fixes it. The difference is whether anyone chose it.
A conscious decision
NASA’s reliability-centered maintenance guide (2008, section 5.1) puts both under reactive maintenance, used well when it is “a conscious decision” that weighs the risk and cost of failure against the cost of preventing it.
Two families, and what the other names say
Every maintenance job is either corrective, done after a failure or a found fault to put it right, or preventive, done before a failure to keep it from happening. What preventive maintenance is has what that work covers and how to start it.
The other names say what triggers the work (a date, a reading, a trend) or how urgent it is (emergency or deferred). Two are ways of choosing: reliability-centered maintenance decides which approach each asset gets, and run to failure is the decision to do nothing until it breaks.
Four words that sound like types are really descriptions:
- Planned means prepared before it starts. A repair booked for Saturday, with the parts on the bench, is planned corrective work.
- Scheduled means it has a date and a person, service or repair.
- Proactive means aimed at the cause of failures, not only at the failure.
- Routine means small and frequent preventive work: cleaning, greasing, topping up, looking.

Examples of each type, by setting
The same type looks different in a plant, a warehouse, a building, a fleet shop and a hotel.
Each type in a plant, warehouse, building, fleet shop and hotelNine types, one job for each setting
| Type | Plant | Warehouse | Building | Fleet shop | Hotel |
|---|---|---|---|---|---|
| Reactive | Replace a seized conveyor motor | Repair a dock door a forklift hit | Clear a backed-up restroom drain | Replace a hose that burst on a route | Fix a guest-room AC that quit |
| Corrective | Replace a pump seal found weeping on rounds | Replace a lift chain found worn on the daily check | Replace a cracked fan belt found at a filter change | Replace brake pads found thin at a service | Re-caulk a tub found cracked at a room check |
| Emergency | Isolate a burst hydraulic line on a press | Stop a sprinkler pipe leaking over racking | Restore heat on a January morning | Pull a truck with failing brakes off the road | Stop water coming through a ceiling from the floor above |
| Deferred | Hold a gearbox rebuild for the summer shutdown | Hold floor resurfacing for the slow season | Put off a roof replacement for a year | Leave body rust repair to next year’s budget | Push the lobby carpet to next year |
| Run to failure | Break room exhaust fan | Aisle light fixtures, with spares on the shelf | Restroom exhaust fans | Cab dome lamps | Guest-room hair dryers, replaced from stock |
| Time-based | Change compressor oil every 6 months | Lubricate dock levelers every quarter | Clean the boiler every summer | Yearly periodic inspection | Flush the water heaters every year |
| Condition-based | Change a filter when its gauge reads high | Replace forklift tires at the wear line | Change filters at their pressure drop limit | Reline brakes at minimum thickness | Backwash the pool filter when its pressure rises |
| Predictive | Vibration readings on critical motors | Infrared scan of conveyor drives | Infrared scan of the switchgear | Engine oil analysis | Vibration readings on the chiller |
| TPM and autonomous | Operators clean and inspect at shift start | Drivers check forklifts before each shift | Custodians report leaks and dead lights on rounds | Drivers do the pre-trip inspection | Housekeepers test lamps, TV and AC at each clean |
When each type fits
Each asset gets the type that fits what its failure costs, so most sites run a mix. Maintenance strategy shows how to choose it, asset by asset.
Ten types: what each fits, and what it is wrong forFrom reactive to TPM and autonomous
| Type | Fits | Wrong for |
|---|---|---|
| Reactive | The surprises every site has | A plan: if most work is reactive, the other types are missing |
| Corrective | Every site, because faults will be found | The same fault again and again: fix the cause |
| Emergency | Real danger, or a stopped line or building | Ordinary jobs called urgent to jump the queue |
| Deferred | Work that can wait for parts, a shutdown or a budget, with a date | Life safety, and damage that spreads while it waits |
| Run to failure | Cheap, redundant, quickly replaced items with no safety consequence | Hidden failures, such as emergency lights or a standby pump |
| Time-based | Wear that follows age or use, and intervals a rule or manual sets | Failures that come at random |
| Condition-based | Wear you can see or measure before it fails | Items where checking costs more than replacing |
| Predictive | A few critical, costly machines, often through a contractor | Small, cheap or redundant equipment |
| Reliability-centered | Critical systems where failure is costly or dangerous | A whole small site at once: the analysis takes time |
| TPM and autonomous | Machines run by the same operators every day | Equipment nobody owns, or operators given no time |
Preventive vs corrective maintenance
Preventive work is done because it is due, and corrective work fixes a fault once it is found. The line people get wrong is work that a preventive job uncovers: a technician on the monthly air handler service finds the belt cracked and replaces it the next week.
A part replaced because a reading crossed a limit set in advance (a filter’s pressure drop) is usually counted as condition-based, which is preventive. A part found damaged, like the cracked belt, is corrective. Sites draw the line differently, so pick one rule and keep to it.
Write the belt change as its own work order, or the service looks like three hours and the air handler’s history never shows a belt failure. Then count corrective work found by an inspection apart from corrective work found by a breakdown: when preventive work is doing its job, more faults are found the first way.
Reactive vs preventive: one machine, worked out
Preventive work pays where a failure costs far more than the service, and running to failure pays where it does not. In a made-up example, a quarterly service cuts one air compressor’s yearly cost from $11,960 to $4,950, while a break room exhaust fan is cheaper left to fail. The preventive maintenance guide compares the two kinds of work line by line.
The compressor and the exhaust fan, worked outEvery number is made up; put in your own
Take the air compressor that feeds a small plant’s packing line. With no service, it breaks down about twice a year.
6 h × $500
8 h × $60
A quarterly service is 2 hours at $45 plus a $400 kit of filters and oil, so $490. Say that with it, failures drop to one every two years.
| Reactive only | Quarterly service | |
|---|---|---|
| Planned service a year | None | 4 × $490 = $1,960 |
| Failures a year | 2 | 0.5 |
| Failure cost a year | 2 × $5,980 = $11,960 | 0.5 × $5,980 = $2,990 |
| Total a year | $11,960 | $4,950 |
If a second compressor cuts in on its own when the first stops, the line keeps running and a failure costs $2,980. Reactive only becomes $5,960 a year and the service $3,450. Preventive still wins, by less.
Now a break room exhaust fan. A new one is $150 and an hour to fit ($45) and lasts about six years, so about $33 a year. Quarterly checks cost 4 × 0.25 h × $45 = $45 a year, and no check stops its motor from wearing out. Run it to failure.
Two numbers decide it
The first is how often the machine fails today, which your closed work orders show. The second is what an hour of stoppage costs, which the downtime cost guide works through.
The mix a small crew runs
A crew of 3 to 10 people can get by on four types:
Predictive work usually means a contractor with a vibration meter or an infrared camera, once or twice a year, on a few critical machines. For a plant, industrial maintenance lays this mix out as a weekly routine. A small site borrows from reliability-centered maintenance and TPM (the written run-to-failure decision, the operator’s daily check, as in autonomous maintenance) without running either in full.
How Maintensor handles the types
In Maintensor, every work order has a Type of work: Reactive, Preventive or Other. A new one starts as Reactive, so preventive maintenance software here means two settings: the type set to Preventive, and a repeat.
- Repeats. They run on the calendar only. When one is completed, the next is created.
- Condition checks fit inside a calendar job. An Inspection check is answered Pass, Flag or Fail. A Fail asks for a note and a photo before the next step, then offers a follow-up work order, created as Reactive on the same asset, and, when the work order has an asset, Mark asset down. The job can still be closed without them.
- Counting it. On Pro and Max, Reporting shows admins the work orders by type with the preventive ratio and, in its Assets view, the five assets with the most unplanned downtime, counted by the clock with nights and weekends included, with their reactive work orders.
What it does not do
Nothing comes due from hours, miles or meter readings, and nothing is condition-based or predictive: no sensors, no readings that open a work order, no forecasts. There is no Deferred status: a job put off waits On hold or with no due date. There are no reliability-centered, FMEA or TPM tools. Work types are Reactive, Preventive and Other, and a follow-up from a failed check starts as Reactive, so counting faults found by inspection apart takes a category of your own.