What is industrial maintenance?

Industrial maintenance is the work that keeps a plant's equipment able to make product safely: the machines on the line, the utilities that feed them (compressed air, steam, cooling water) and the building around them.

By MaintensorUpdated 9 min read

Key points

  • It is split by system: mechanical, electrical, instrumentation and controls, utilities and the facility.
  • Operators do short daily checks; anything behind a guard or needing lockout stays with maintenance.
  • A made-up crew of three plans 80 of its 120 hours a week, leaving room for breakdowns.
  • In the example, two machines had 70 of 150 breakdowns; two small checks cut breakdowns to 34% of work orders.
  • In Canada, millwright, industrial electrician and instrumentation and control technician are Red Seal trades.

What industrial maintenance covers

Industrial maintenance, also called plant maintenance, is everything a plant does to keep its equipment able to run. It covers scheduled service, repairs, required inspections and installing machines. In a small plant one crew does all of it, with operators doing the daily checks and contractors the specialist tests. The work is usually split by system, because each needs different skills and tools.

Area Equipment Typical work
Mechanical Conveyors, pumps, gearboxes, presses, hydraulics, bearings, chains Lubrication routes, belt changes, alignment, seals and bearings, rebuilds
Electrical Motors, variable frequency drives, motor control centers, panels, lighting Fault finding, infrared scans, motor insulation tests, replacing starters and drives
Instrumentation and controls Sensors, transmitters, control valves, PLCs, safety interlocks Calibration, loop checks, testing interlocks, keeping a current copy of every PLC program
Utilities Air compressors and dryers, boilers, chillers, cooling towers, dust collectors Daily rounds and readings, filters, water treatment, the inspections your jurisdiction requires
Facility Roof, dock doors, heating and cooling, lighting, fire protection, floors Seasonal service, repairs, contractor tests of life safety systems

Facility maintenance keeps a building fit for the people in it; industrial maintenance keeps a process running, and the building is one part of the job.

Types of industrial maintenance

Plant work falls into eight types. Keep them apart on your work orders, because the split shows where the crew’s hours go. Types of maintenance explains the main ones in more depth.

  • Preventive. Services on a schedule: monthly greasing, a weekly locked-out check of each conveyor belt, a compressor service at the hours in its manual.
  • Inspections a rule requires. Forklifts, lockout procedures, cranes, boilers: see the box below.
  • Condition-based. Work that a reading calls for, such as a connection that shows hot on an infrared scan.
  • Predictive. Readings such as vibration or oil analysis trended over months, so the repair is planned before the part fails. It pays on the few machines whose failure stops the plant.
  • Corrective. A defect found on a round, fixed before it fails.
  • Reactive and emergency. Breakdowns. A stopped line jumps the queue.
  • Projects. Installing, moving and changing machines.
  • Shutdown work. Jobs that need the line stopped, saved for a planned shutdown.

Inspections a rule requires

  • Forklifts. In the US, OSHA requires forklifts and other powered industrial trucks to be examined before use, at least daily (29 CFR 1910.178(q)(7)). A written record is how you show it happened.
  • Lockout procedures. In the US, each one is inspected at least once a year, with a certification naming the machine, the date, the employees included and the inspector (29 CFR 1910.147(c)(6)).
  • Cranes. Overhead and gantry cranes get frequent inspections, daily to monthly, and periodic ones every 1 to 12 months (29 CFR 1910.179(j)); the crane inspection checklist sets out both.
  • Boilers and pressure vessels. Inspected under state or provincial rules, which also cover their certificates.

In Canada, each province sets its own workplace safety rules.

What an industrial maintenance technician does

An industrial maintenance technician, also called a maintenance mechanic or industrial mechanic, keeps production machinery running: finding why a machine stopped, replacing worn parts, lubricating, adjusting and calibrating, and testing the machine before it goes back to production.

The title covers three jobs that the Bureau of Labor Statistics groups together:

Machinery maintenance workers
Clean, lubricate and make minor repairs.
Industrial machinery mechanics
Find and fix the harder faults.
Millwrights
Install, take apart and move machines.

In a small plant one technician covers more than the title says: bearings, belts, gearboxes and hydraulics; motors and drives, within the voltages they are qualified for; welding a bracket; and writing down what was found on a breakdown, so the next person does not start from nothing.

The trades on a small crew

A small plant rarely has one of each trade. A crew of three might be a mechanic who also welds, an electrician who also looks after the PLCs, and a technician who runs the lubrication route and the storeroom. In Canada, the Red Seal program lists Industrial Mechanic (Millwright), Industrial Electrician and Instrumentation and Control Technician as trades, each learned by apprenticeship; the questions at the end of this page have US training.

What the crew cannot cover goes to contractors:

  • Electrical fault finding: in-house only when someone is trained and qualified for the voltages involved. OSHA’s electrical work practice rules set the training for qualified persons (29 CFR 1910.332).
  • PLC and control changes: in-house when someone owns the programs and keeps a backup; contract when the integrator who wrote them holds the only copy.
  • Tests your code assigns to a licensed or certified person (boilers, elevators, fire alarms, sprinklers): always contract, unless that person is on staff.
  • Installing and moving machines: small, familiar ones in-house; contract when it needs rigging, a crane or alignment the crew has not done before.

Operator checks and maintenance PMs

Operators do short checks each shift, because they hear a change before anyone else, and maintenance owns the rest. The split that works in most small plants, and the core of autonomous maintenance:

Task Operators, each shift Maintenance
Clean the machine; look for leaks, loose bolts, damaged guards Yes Fixes what operators find
Lubricate the points marked for operators Yes, from a chart at the machine Owns the chart, and every point behind a guard
Read gauges: air pressure, oil level, temperature Yes, and writes the number down Sets the limits; acts on a reading out of range
Anything that needs a guard off or lockout Only if trained and authorized under your lockout program Yes
Adjust, replace, rebuild No Yes

When operator checks work

They work when the operator’s list is short, every item can fail, and a failed check becomes a job the same day. They stop working the week operators learn that a reported problem goes nowhere.

A weekly routine for a small plant

Plan only the hours left after breakdowns and overhead, then give each kind of work a day. Take a made-up plant: two packaging lines, about 45 machines, one shift, five days a week. Maria Chen leads and plans; Ben Carter is the mechanic, James O’Neil the electrician and Sarah Mitchell the general technician.

ExampleHow many hours the crew can plan

Last quarter’s work orders show roughly what comes off the week’s 120 hours:

120Hours a week
3 technicians × 40 h
30Breakdowns
10Meetings, parts runs, paperwork
80Hours to plan
120 − 30 − 10

Say 50 of the 80 go to PMs and inspections, 20 to corrective backlog and 10 to project work.

Planning all 120 hours would leave nobody free when a line stops. If the PM list needs 70 hours a week, it does not fit: cut it, spread it or add people before Monday.

Maintenance gives each kind of work a fixed day:

Day Maintenance
Monday Maria reads the weekend’s requests and confirms the week; Line 1 PMs
Tuesday Lubrication route on both lines (Ben, about 4 hours); corrective backlog
Wednesday Line 2 PMs; electrical round of panels and drives (James)
Thursday Utilities round: compressor, dryer, dust collector and boiler readings (Sarah); project work
Friday Close the week’s work orders, count critical spares, plan next week (one hour)
One Saturday a month Lines stopped: shutdown jobs saved during the month

A PM that slips then shows within the week, not at the end of the month. The weekly maintenance schedule guide covers putting each job on a person’s day.

Records worth keeping

Keep an asset list, work order history for each machine, PM checklists with their readings, and downtime by machine. No general rule asks for these, but they are good practice, and a plain equipment maintenance log covers one machine’s history and readings.

A rule does come in for forklift examinations, lockout procedure inspections, and boiler and pressure vessel certificates: the box under Types of industrial maintenance says what each one asks for. The rules are information, not legal advice: check the ones that apply to your plant and each machine’s manual.

Industrial maintenance example: a quarter of breakdowns, sorted by machine

Sorting breakdowns by machine shows which few checks are worth adding. In the first quarter, the same made-up plant’s crew closed 300 work orders: 135 preventive, 150 reactive and 15 other, so half were breakdowns. Sorting those by machine took Maria 20 minutes:

Machine Reactive work orders What they were
Case packer, Line 1 41 26 glue jams, 9 sensor faults, 6 other
Air compressor 29 21 high-temperature trips
The other 43 machines 80 No more than 6 on any one machine

Two machines had 70 of the 150 breakdowns. Reading what the jobs said found two causes, and a small check for each:

Case packer: glue on the nozzles
Glue built up over a shift. Operators now wipe the nozzles at each start-up (5 minutes).
Compressor: a clogged cooler
The cooler now gets blown out every Thursday on Sarah’s utilities round, with the discharge temperature written down (20 minutes).

In the second quarter, with the other machines unchanged at 80 breakdowns:

14Case packer
down from 41
4Compressor
down from 29
34%Breakdowns
98 of 290 work orders, down from 50%

The numbers are made up; the method is not

Count breakdowns by machine, read what the jobs say, and add the smallest check that would have caught the cause.

When a plant does not need all this

A shop with one maintenance person and 15 machines can run on a paper list of PMs and a notebook of what broke. That stops working when requests get lost between shifts, PMs are missed and nobody notices, or nobody can say when the compressor was last serviced. That is when a CMMS earns its place.

A plant in Maintensor: locations, assets and repeating PMs

In Maintensor the plant is a tree of locations, with each machine an asset in one of them. The page on manufacturing maintenance software shows a plant set up this way.

The locations list: the plant at the top, three areas under it, and under Building services a boiler room, a lab and two roof wings with their asset and open work counts.
The locations list: the plant at the top, three areas under it, and under Building services a boiler room, a lab and two roof wings, each with its count of assets and open work.

PMs are work orders that repeat, and completing one creates the next. A failed Inspection check asks for a note and a photo, then offers a follow-up work order. An asset warns when one part has been used on it three or more times this year. An asset list in Excel or CSV can be imported on Pro and Max; otherwise it is typed in.

Operators can be Requesters, free on every plan, and report a problem in a line, picking the machine. To answer the start-up checklist in the app, an operator needs a Full user seat; otherwise the check stays on paper and only failures come in as requests.

On Pro and Max, the Planner lays out each person’s week against an 8 hour day, and Reporting, for Admins, shows downtime, MTTR, MTBF and the machines with the most unplanned downtime.

What it does not do

Services come due by the calendar only, never by run hours or a meter, and nothing reads a sensor. There are no failure codes or shift handover notes.

Questions

What people also ask.

More in the blog, or see the whole product on the features page.

What is the difference between industrial maintenance and facility maintenance?

Facility maintenance keeps a building safe and comfortable for the people in it: heating and cooling, roofs, plumbing, lighting and life safety systems. Industrial maintenance keeps a production process running: the machines, the controls and the utilities that feed them. A plant needs both, and in a small plant the same crew usually does both.

Is industrial maintenance a skilled trade?

Much of it is. In Canada, Industrial Mechanic (Millwright), Industrial Electrician and Instrumentation and Control Technician are Red Seal trades, learned through apprenticeship. In the US, millwrights usually serve a 3 or 4 year apprenticeship, and industrial machinery mechanics typically learn through more than a year of on-the-job training, according to the Bureau of Labor Statistics.

Should operators or maintenance do the daily checks on production machines?

Operators are usually best placed to do the daily checks: they run the machine all shift and notice a change first. Their list should be short and need no tools or lockout: clean, look for leaks and loose parts, read the gauges, lubricate the points marked for them. Anything behind a guard or needing lockout stays with maintenance.

Run one line's maintenance through it.

Start the trial, add the machines on one line with their recurring jobs and checklists, and let the crew close work from the floor on a phone.

30-day free trial. No credit card.