Equipment maintenance log

An equipment maintenance log is the running record of one machine: every service, repair and inspection, one line each, with the date, work done and found, who did it, parts, hours, meter reading and next due date.

Free, no sign-up. Print it, or type into the Word file.

By MaintensorUpdated

The blank equipment maintenance log on one Letter page on its side: the machine's details, from its name and tag to the vendor to call, then thirteen lines for each job's date, type, work done and found, who did it, parts, hours, meter reading, next due date and work order number.

What the form holds

The machine details at the top, filled in once, are the same as the machine’s row in an asset register. Below them, a line for every job. The Excel file has room for thirty jobs, a list for the type of work and a total of the hours.

DateThe day the work was done, not the day it was written up.
TypePM for preventive, R for repair, I for inspection or C for a contractor's visit. A log you cannot sort by type hides the repairs.
Work done and foundWhat you found, what you did, and any reading, with its unit. Not "Serviced", "OK" or "fixed".
ByThe name of the person who did the work, not initials nobody will recognize in two years.
PartsEach part, its number and the quantity, not "Misc. parts".
HoursLabor hours on the job, not clock times.
MeterThe reading off the hour meter, odometer or counter, not a guess.
Next dueThe date, or the meter reading, of the next service, not "soon".
WO numberThe work order the job was done under. The number leads to the detail: the steps, readings and sign-off.

A blank work order is in the work order template. Add the columns the maker’s manual asks you to record, such as oil analysis results or a torque value, and drop the meter column if the machine has no meter.

A filled-in example: an air compressor

ExampleAir compressor AC-1, January to March

A made-up plant. The machine, the names, the readings and the service intervals are invented; the real intervals come from your compressor’s manual, and the air compressor maintenance checklist lists the checks.

Field Entry
Machine name and tag Air compressor AC-1
Location Compressor room, building services
Make and model Rotary screw, 25 hp (18.6 kW)
Serial number RS25-118734
In service since March 2019
Meter Hour meter
Main service intervals Monthly inspection; oil filter and air filter every 2,000 hours; separator element every 4,000 hours
Date Type Work done and found By Parts Hours Meter Next due WO number
Jan 6 PM Monthly inspection. Intake filter clean, drains cycle, no leaks heard. Discharge 110 psi (7.6 bar), 185 °F (85 °C). Ben Carter None 0.5 10,410 Feb 3; filters at 10,800 h WO-2210
Jan 22 R Shut down on high temperature at 2 p.m. Cooler fins packed with dust; blown out from the clean side. Ran an hour at 186 °F (86 °C). James O’Neil None 1.5 10,570 WO-2264
Feb 3 PM Monthly inspection. Coolers dusty again, cleaned. Air leak at the quick coupler on drop 4, tagged. Ben Carter None 0.75 10,690 Mar 3 WO-2291
Feb 5 R Replaced the leaking quick coupler on drop 4. Tom Reyes 1 quick coupler, 3/8 in 0.25 10,710 WO-2298
Feb 17 PM 2,000-hour service: oil filter and air filter changed, oil topped up, oil sample sent. Ben Carter 1 oil filter, 1 air filter, 1 gal (3.8 L) oil 1.5 10,830 Filters at 12,800 h; separator at 12,000 h WO-2330
Mar 3 PM Monthly inspection. Coolers clean. Oil sample report normal, filed behind this page. Ben Carter None 0.5 10,970 Apr 7 WO-2361
Mar 18 I Receiver tank checked outside: no rust, dents or leaks. Safety valve tested as the manual directs. Sarah Mitchell None 0.5 11,120 Next March WO-2392

About 10 hours a day. From January 6 to March 18 is 71 days, and the meter went from 10,410 to 11,120: 710 hours.

The separator is due around June 14. It is due at 12,000 hours, 880 hours past the March reading: 88 days at 10 hours a day. Put it on the schedule now, for the nearest weekend or shutdown.

The coolers are a pattern. One high-temperature trip in January and dusty coolers again two weeks later is the same problem twice. Either the monthly inspection gets a step to blow out the coolers, or someone finds where the dust comes from.

The labor was small; the trip was not. The log shows 5.5 hours of labor in ten weeks (0.5 + 1.5 + 0.75 + 0.25 + 1.5 + 0.5 + 0.5), but not what the January trip cost the plant in stopped air tools. Note that in the line when it happens.

How to keep it

One log per machine
Keep it in a sleeve on the machine, or in the shop binder under its tag. Identical machines still get a log each, so the bad one stands out.
Written when the job is done
By the person who did it. A log written up on Friday from memory records what someone remembers.
Every job gets a line
Preventive services, repairs, inspections, adjustments, part changes and contractor visits. Staple a contractor’s report behind the page.

When a check finds the machine unsafe

Take it out of service and tag it, write a work order for the repair, and log both.

How long to keep it: the rules that exist

For most machines no rule says how long to keep the maintenance log. Keep it for as long as you own the machine, and pass it to the buyer when you sell it: its value is the pattern over years, and an insurer, an inspector or a warranty claim may ask to see it.

What the rules sayFive US federal examples: presses, cranes, extinguishers, trucks and forklifts.

Where a rule does apply, it sets what must be recorded and sometimes for how long. A few US federal examples:

Equipment Rule What it asks to be recorded How long
Mechanical power presses OSHA 29 CFR 1910.217(e)(1) A certification record of periodic inspections and of maintenance and repair: the date, the signature of the person who did the work, and the press’s serial number or other identifier The paragraph sets no period
Overhead and gantry cranes OSHA 29 CFR 1910.179(j)(2) and (m)(1) Monthly certification records for hooks, hoist chains and running ropes: the date, the inspector’s signature, and an identifier for what was inspected Rope records kept on file where readily available; no period set
Portable fire extinguishers OSHA 29 CFR 1910.157(e)(3) The date of the annual maintenance check 1 year after the last entry, or the life of the shell, whichever is less
Commercial motor vehicles FMCSA 49 CFR 396.3 For each vehicle a carrier controls for 30 days in a row: its identification, what inspection and maintenance is due and when, and a record of inspection, repair and maintenance with the date and nature of each Where the vehicle is housed or maintained, for 1 year, and for 6 months after it leaves the carrier’s control
Forklifts OSHA 29 CFR 1910.178(q)(7) An examination before use, at least daily. OSHA’s 2000 letter of interpretation says the exam does not have to be documented The employer’s choice

Many sites write down the daily forklift check anyway, because a dated sheet shows it was done. Trucks and trailers have their own page: the vehicle maintenance log.

This is information, not legal advice. States that run their own OSHA plans can have different rules, boilers and pressure vessels are inspected under state or provincial rules, and in Canada each province and territory sets its own requirements for cranes, pressure equipment and workplace records.

Read the rule that applies to you, and the maker’s manual, which may set its own records for the warranty.

The log in Maintensor

In Maintensor, nobody writes the log by hand: an asset’s record builds it from the work orders done on the asset. Its Nameplate (Manufacturer, Model, Serial number), Location and Description are the header.

  • The Work orders tab is the log lines: what is open now, then what was done, newest first, each with who completed it, the day and its cost. Below the Max plan the cost is parts only; on Max it includes labor and other costs.
  • At the top, Last service shows the most recent completed work order, and This year counts the work orders completed this year and what they cost. When one part is used on an asset three or more times this year, the asset warns: check for a recurring fault.
  • Each line opens the work order behind it, with its checklist answers, parts, time and notes. The History tab records each change of the asset’s status (Operational, In maintenance, Down or Retired) with the reason typed, and its moves between locations.
A conveyor's work orders: four open with their due dates, a note that a V-belt has been used on it 10 times this year, and the latest finished jobs with their parts cost.
A conveyor's log in the app: four open work orders with their due dates, a note that a V-belt has been used on it 10 times this year, and the latest finished jobs with their parts cost.

What it does not do: an asset has no meter or readings. A Number step on a checklist can record the hour meter at each service, but the value stays on that work order’s checklist, and nothing comes due from it. The log has no export and no print layout.

A log kept in a spreadsheet can be imported on Pro and Max as done work orders, but an old paper log cannot. A Signature step records a signature drawn on the screen; it does not make a record meet a rule.

Questions

What people also ask.

More in the checklists, or see the whole product on the features page.

Is the equipment maintenance log free?

Yes. The PDF, Word and Excel files are free to download, with no sign-up, and free to print, copy and change for your own machines.

What should an equipment maintenance log include?

At the top, the machine: its name and tag, where it is, make, model, serial number and its main service intervals. Then one line per job: the date, the kind of work, what was done and found, who did it, the parts used, the hours spent, the meter reading if the machine has a meter, and when it is next due.

How long should equipment maintenance records be kept?

For most equipment no rule sets a period, so keep the log for as long as you own the machine and hand it over when you sell it. Where a rule applies, it sets the minimum. OSHA's rule for portable fire extinguishers, for example, asks for the annual maintenance record to be kept one year after the last entry or for the life of the shell, whichever is less.

Do daily operator checks go in the maintenance log?

Usually not line by line. Keep daily checks on their own sheet, and write a line in the maintenance log when a check finds something and a repair follows. Otherwise the log fills with ticks and the repairs get hard to see. Some rules ask for the inspection records themselves, so check what applies to the equipment.

What is the difference between a maintenance log and an asset register?

An asset register lists every machine you own, one line per machine: what it is, where it is and its nameplate details. A maintenance log follows one machine over time, one line per job. The register tells you what you have; the log tells you what has been done to it.

Start with the machine that gives you the most work.

Start the trial, add that one asset with its location and nameplate, and write its first work order. Its history builds from there, job by job.

30-day free trial. No credit card.