Maintenance work order template

A maintenance work order template is a blank form with a place for everything one job needs: what and where, who and when, the steps, the parts, the time and a sign-off.

Free, no sign-up. Print it, or type into the Word file.

By MaintensorUpdated

Page 1 of the blank maintenance work order: the work order number and who wrote it, the job with boxes to tick for the type of work and the priority, the assignment and dates, and seven numbered steps with a column for done, pass or fail.
Page 1 of 2

What the form holds

Seven blocks on two pages, in the order a job moves through them. The Excel file adds drop-down lists, a cost for each part and totals for parts and hours.

Work orderThe work order number, the date it was written, who wrote it, and the request it came from, if there was one.
The jobThe asset and where it is, what is wrong or what is due, what was seen and when it started, the type of work (reactive, preventive, inspection or other) and the priority (low, medium, high or emergency).
Assignment and datesWho the job is assigned to, the start and due dates, an estimate in hours, whether a lockout is needed and its procedure number, and any permits or a second person needed.
StepsSeven numbered lines, each with Done, Pass or Fail, and a reading or note.
PartsFour lines: the part, its number, the quantity, the storeroom it came from and the unit cost.
TimeThree lines: who worked, on what date, for how many hours.
Completion and sign-offWhat was found, what was done, the cause if it is known, the number of any follow-up work order, when the asset was back in service, and who completed and who reviewed the job, each with a signature and a date.

What each field is for, and how to write a title a technician can act on, is in what a work order is.

A filled-in example: a rooftop unit that stopped cooling

ExampleWO-3127, written on a Tuesday afternoon in June

A made-up office building; every name, number and part is invented.

Field Entry
Work order number WO-3127
Date written Tuesday, June 9, 1:35 p.m.
Written by Susan Clarke, building manager
From request number REQ-488, from a tenant’s office manager: “2nd floor west is 79 degrees”
Asset Rooftop unit RTU-3, serves 2nd floor west
Location Roof, west wing
What is wrong RTU-3: 2nd floor west at 79 °F (26 °C) against a 73 °F (23 °C) setpoint; unit running
What was seen Warm since late morning. The building controls show RTU-3 calling for cooling since 10 a.m., with supply air at 66 °F (19 °C).
Type of work Reactive
Priority High: an occupied floor, and 88 °F (31 °C) forecast for tomorrow
Assigned to Jason Miller
Start and due Tuesday, June 9
Estimate 2 hours
Lockout Yes: the unit disconnect, under the building’s written procedure for RTU-3
Steps 1. Lock out RTU-3 at the unit disconnect and confirm it does not start on a call from the thermostat. 2. Check the filters and note their condition. 3. Check the blower belt for wear and tension. 4. Look at the condenser coil from outside and inside. 5. Clean the coil as the unit maker’s manual directs. 6. Restore power, run 20 minutes, record supply and return air temperatures. 7. If the temperatures stay off, stop and call the HVAC contractor for a refrigerant check.
Readings Before: supply 66 °F (19 °C), return 78 °F (26 °C). After 20 minutes: supply 56 °F (13 °C), return 76 °F (24 °C).
Parts 4 pleated filters, 20 x 25 x 2 in (508 x 635 x 51 mm); 1 blower belt, BX48; 1 gal (3.8 L) of coil cleaner. All from the main storeroom.
Time Jason Miller, 2 h 15 min
What was found Condenser coil matted with cottonwood fluff across its whole face. Filters loaded. Blower belt glazed and loose.
What was done Coil cleaned, filters and belt replaced, belt tensioned to the maker’s figure.
Cause, if known Cottonwood season, and filters a month past their change date.
Follow-up WO-3131: add a condenser coil check to RTU-3’s service in May and June.
Back in service Tuesday, June 9, 3:50 p.m.; 2nd floor west at 74 °F (23 °C) by 5 p.m.
Completed by Jason Miller, signed, June 9
Reviewed by Susan Clarke, signed, June 10

Three entries make it useful a year from now: the readings before and after, the cause, and the follow-up that changes the schedule so it does not happen again next June.

Step 7 stops where it does on purpose. In the US, anyone whose work could reasonably be expected to open the refrigerant circuit must pass an EPA-approved Section 608 certification exam (40 CFR 82.161). In Canada, provincial rules set who may handle refrigerant.

Check which refrigerant rule applies to you before the form sends anyone into the circuit. The routine service the job points to is in the HVAC maintenance checklist, and the lockout step follows the site’s written lockout/tagout procedure.

How to use this form

Two people fill it in
The supervisor or planner writes the top part before the job. The technician writes the rest at the job: readings, parts actually used, time, and what was found and done. The supervisor reads it and signs it off.
One form per job
One problem, one asset. A second problem found on the job gets its own form, so each machine’s history stays true.
A starting point
Cut the fields you never use and add the ones your site needs: a permit number, a cost center, a customer’s signature. Copy the maker’s steps or readings in word for word.

When a step fails

A failed step stops the job, not the paperwork. If a step finds something unsafe, the equipment comes out of service and is tagged, and the new problem gets its own work order. Write its number in the follow-up box.

Short versions: a preventive job and an inspection

A preventive work order comes round again and again, so the form shrinks: the job and its steps are the same every visit, and what is worth writing down is the readings and anything found. Keep these:

The jobThe work order number, the asset and its location, the task and its interval (for example, a monthly service) and the due date.
The procedureThe one used, with its version or date: the same steps on every visit, kept with the form or attached to it.
The readingsEach against its limit.
What it tookThe parts used and the time.
What was foundWhether anything was found, with the number of the follow-up work order. Then who did it, and when.

The preventive maintenance checklist and the machine’s manual are where to start a procedure. A “next due” box only helps if someone copies the date onto the schedule.

An inspection form is a list of checks, each with a pass or fail and room to say what failed. A failed check is not repaired on the inspection form: it gets its own work order, and that number goes in the last column. Flag means it works today but needs watching.

ExampleA monthly dock door round

Made up: the door, the results and the work order number are invented.

Check Result Note, or follow-up work order number
Door opens and closes fully, without binding Pass Smooth, no binding.
Photo eyes stop and reverse the closing door Fail The door did not reverse on the left photo eye. Door tagged out. WO-3142.
Bottom seal and weatherstripping intact Flag Torn at the left corner, still seals. Look again next month.
Cables, rollers and hinges: no fraying, no rust, rollers seated Pass Clean, rollers seated.
Dock leveler lip extends and stores Pass Extends and stores fully.
Dock bumpers in place and intact Pass Both intact.

Below the checks: inspected by, date and signature. Leave spring and cable repairs to a trained door technician; the full set of checks for the leveler is in dock leveler maintenance.

Filing it so it helps later

  • Lead the title with the asset, then the symptom: “RTU-3: 2nd floor west warm”, not “AC”.
  • Write numbers, not adjectives: “supply 66 °F”, not “warm”.
  • “Fixed” is not a finding. Say what was found and what was done.
  • Write the cause when you know it, and “unknown” when you do not.
  • File closed forms by asset, not by date. A folder per machine becomes an equipment maintenance log with no extra writing.

The same form in Maintensor

In Maintensor, a work order is a record with the fields of this form, and only the title is required. Every work order gets a number, and photos, PDFs and documents can be attached, up to 25 MB.

  • The job and the assignment. Title, Description, Asset, Location, Priority (None, Low, Medium or High) and Type of work (Reactive, Preventive or Other). Then Assigned to (people, teams or both), Starts, Due and Estimate, with dates only and no time of day, and Categories, the procedures and the parts, each from a storeroom.
  • The steps block is a procedure, built once from steps such as Checkbox, Number, Inspection check (Pass, Flag or Fail), Photo and Signature. The same procedure can be attached to any number of work orders; a change is published as a new version.
  • The time block is the Time and cost tab: time runs from Start work, and can be added or fixed by hand. Notes go on the History tab, which also records who created the work order, who was assigned and each change of status.
Work order management software: one work order in Maintensor, with its status, priority, asset, assignee, due date and checklist.
One work order in the app, with its status, priority, asset, assignee, due date and checklist.

What it does not have: no work order templates, no way to copy a work order, and no printable work order. A job that comes round on a schedule is set to repeat instead, and each new work order carries the last one’s title, description, asset, people, procedures and parts.

There is no Inspection or Emergency type and no cause field, so a cause goes in a note. An inspection is a work order whose procedure is a list of Inspection checks: a Fail asks for a note and a photo, then offers a follow-up work order. Only Admins and Full users answer checklists.

Questions

What people also ask.

More in the checklists, or see the whole product on the features page.

What should a maintenance work order form include?

At least the asset and where it is, what is wrong or due, the priority, who is assigned, the start and due dates, the steps to follow, the parts used, the time spent, what was found and done, and a sign-off. A work order number, and a box for the request it came from, tie it to the rest of the paperwork.

Is the work order template free?

Yes. The PDF, Word and Excel files are free to download, with no sign-up, and free to print, copy and change for your own work.

Can I use this work order template in Excel or Word?

Yes. Download the Excel or Word file, and fill it in on the screen or print it. The Excel file has drop-down lists for the type of work, the priority and the result of each step, works out the cost of each part, and adds up the parts and the hours. Change the fields to suit your site: add a permit number, a cost center or a second signature if you need one.

Who fills in a maintenance work order form?

The supervisor or planner fills in the top part before the job: the asset, what is wrong, the priority, the person, the dates, the steps and the parts expected. The technician fills in the rest at the job: readings, parts used, time, and what was found and done. The supervisor reads it and signs it off when the job closes.

Does a work order form need a signature?

Most maintenance jobs do not need one, but a signature helps wherever someone has to answer for the work: a lockout that was removed, a repair a manager approved, or an inspection a rule requires a signed record of. Where a rule asks for a signature, follow its wording on what the record must show.