Conveyor belt maintenance checklist

Conveyor belt maintenance is a look at the running belt each shift, a locked-out inspection of tracking, splices, idlers and scrapers each week, a monthly service of the drive, and a survey of the whole line once a year.

Free, no sign-up. Print it, or type into the Word file.

By MaintensorUpdated

Page 1 of the blank conveyor belt maintenance checklist: the conveyor and visit, then the each-shift, weekly and monthly checks, each with a box for OK and Fail and a line for a note.
Page 1 of 2

The checks, from each shift to yearly

Belts rarely fail without warning: a belt that walks, a roller that stops turning, a worn scraper and a lifting splice all show first. One sheet per conveyor and visit; a failed check gets a work order. Add the maker’s tasks for your conveyor, and where they disagree with this list, the manual wins.

Each shift (belt running, from outside the guards)8 checks

  • Belt runs centered at the head, the tail and along the run
  • Load lands centered at the loading point
  • Sound along the line
  • Spillage and carryback under the return run and at transfers
  • Guards on, fastened, nothing tied back
  • Pull cords and stop buttons reachable
  • Start-up warning sounds before the belt moves, where fitted
  • Drive motor and reducer

Weekly (locked out, except the stop test)10 checks

  • Each pull cord and stop button, with the belt running
  • Belt top cover, bottom cover and edges
  • Mechanical splice
  • Vulcanized splice
  • Carrying and return idlers turn freely
  • Belt cleaner blades
  • Skirt boards and seals at the loading point
  • Take-up
  • Belt tension
  • Pulleys and idlers clean

Monthly (locked out)7 checks

  • Drive V-belts or chain, sprockets, coupling
  • Drive guards
  • Reducer oil level, breather and seals
  • Head, tail, snub and bend pulley bearings, greased per the chart
  • Pulley lagging
  • Pulleys square to the frame
  • Backstop or holdback on an incline

Yearly, at the shutdown7 checks

  • Belt cover thickness at several marked points, recorded
  • Every pulley: shell, lagging, shaft, bearings
  • Reducer oil changed, or sampled, at the maker's interval
  • Structure, walkways, crossovers, handrails
  • Guarding walked against the drawings
  • Periodic inspection of the conveyor's lockout procedure, by an authorized employee other than those who use it
  • Spares: belt, splice kit, idlers, cleaner blades
What counts as a fail, check by checkThe full tables, and where each check comes from.

The last column says where each check comes from: Rule links the regulation, Maker points to the belt, cleaner or reducer maker’s manual, and Practice is common plant practice.

Each shift (belt running, from outside the guards)

Check Fail when Basis
Belt runs centered at the head, the tail and along the run An edge rubbing the frame or running off the idler ends Practice
Load lands centered at the loading point Material landing to one side Practice
Sound along the line A squeal, a knock, or a roller rattling Practice
Spillage and carryback under the return run and at transfers Piles under the belt, material building on return idlers Practice
Guards on, fastened, nothing tied back Any guard missing or open. 1910.212(a)(1) requires guarding against ingoing nip points and rotating parts Rule
Pull cords and stop buttons reachable A cord slack, broken or blocked, a button hidden behind stock Practice
Start-up warning sounds before the belt moves, where fitted Silent Practice
Drive motor and reducer A new noise, a hot smell, oil on the floor Practice

Weekly (locked out, except the stop test)

Check Fail when Basis
Each pull cord and stop button, with the belt running The belt keeps moving, or restarts without the switch being reset Practice
Belt top cover, bottom cover and edges A cut or gouge to the carcass, a rip, frayed or folded edges, cover lifting Practice
Mechanical splice A fastener missing, cracked or pulling through; a splice not square to the belt Maker
Vulcanized splice The cover or plies lifting or separating at the splice Maker
Carrying and return idlers turn freely A seized roller, a flat spot, a shell worn thin enough to cut the belt Practice
Belt cleaner blades Worn past the wear line, not touching the belt, tensioner slack Maker
Skirt boards and seals at the loading point Gaps letting material out, rubber worn away Practice
Take-up A gravity take-up that will not move freely; any take-up near the end of its travel Practice
Belt tension Slipping at the drive pulley, or sag between idlers beyond the belt maker’s figure Maker
Pulleys and idlers clean Material caked on a pulley face or idler Practice

Monthly (locked out)

Check Fail when Basis
Drive V-belts or chain, sprockets, coupling Cracked or glazed belts, a stretched chain, hooked sprocket teeth, a worn coupling insert. 1910.219(p)(1) requires power-transmission equipment to be inspected at intervals not exceeding 60 days Rule
Drive guards Loose, damaged or missing. 1910.219(d)(1) requires guards on pulleys 7 feet (2.1 m) or less from the floor Rule
Reducer oil level, breather and seals Below the mark, a plugged breather, a leaking seal Maker
Head, tail, snub and bend pulley bearings, greased per the chart Running hotter than last month, rough, or purging dirty grease Maker
Pulley lagging Worn smooth, peeling, or tiles missing Practice
Pulleys square to the frame Out of square when measured against the frame Practice
Backstop or holdback on an incline The belt rolls back when stopped Maker

A thermometer or an infrared camera turns “running hot” into a number you can compare month to month.

Yearly, at the shutdown

Check Fail when Basis
Belt cover thickness at several marked points, recorded Worn to the belt maker’s limit Maker
Every pulley: shell, lagging, shaft, bearings Cracked shell or weld, worn shaft, rough bearing Practice
Reducer oil changed, or sampled, at the maker’s interval Overdue, or the sample shows water or wear metal Maker
Structure, walkways, crossovers, handrails A cracked weld, heavy rust, a missing rail or bolt Practice
Guarding walked against the drawings A nip point that can be reached, against 1910.212(a)(1) Rule
Periodic inspection of the conveyor’s lockout procedure, by an authorized employee other than those who use it Not done in the last year. 1910.147(c)(6) requires it at least once a year Rule
Spares: belt, splice kit, idlers, cleaner blades Not on the shelf for a conveyor that would stop the plant Practice

Before you start

Who checks
Operators watch the running belt each shift, from outside the guards. Technicians do the weekly and monthly checks locked out, and the yearly survey happens at a planned shutdown.
Lock it out
Under OSHA 1910.147(a)(2)(ii), servicing during production falls under the lockout rule when someone removes or bypasses a guard or puts part of their body into a danger zone. The lockout/tagout procedure guide covers the steps for one machine.
Stored energy
A loaded incline belt can roll back, and a gravity take-up keeps the belt under tension. Block or release that energy, then press start to prove the belt will not move.

When a check fails

  • Stop the line, lock it out, mark it Fail, and do not restart until it is fixed: a pull cord or stop that does not stop the belt, a missing guard, a splice with fasteners missing or pulling through, a rip across the belt.
  • Fail, and fix it this shift: a seized idler, or the belt rubbing the frame, before friction heat or a cut edge does more damage.
  • Flag, with a work order for this week: a worn cleaner blade, worn lagging, spillage building.
  • Pass with a note, and look again next week: a slight new noise, light carryback.

The same idler failing every few weeks is a cause to find, not a part to keep buying: root cause analysis is the method. The list is written for belt conveyors carrying bulk material or packages; a roller or chain conveyor keeps the drive, guard and stop sections and drops the belt ones.

Conveyor guarding and emergency stops: what OSHA asks

OSHA’s general industry rules have no general section on conveyors. 1910.212(a)(1) requires guarding against hazards such as ingoing nip points and rotating parts, which on a conveyor means the head, tail, snub and bend pulleys and the idlers where hands can reach.

What the rules sayOSHA's 1990 letter, the drive and lockout rules, construction sites, ASME B20.1, Canada.
  • Belt edges and pull cords. In a 1990 letter about walkways beside belt conveyors, since archived, OSHA wrote that nip points and the belt edge must be guarded and that an emergency stop pull cord along the length of the conveyor was also required.
  • The drive and lockout. 1910.219 covers the drive’s belts, pulleys, chains and couplings, and 1910.147 covers lockout, including stored energy.
  • Construction sites. 1926.555 requires a stop at the operator’s station, an audible warning before start-up, emergency stops that keep the conveyor stopped until reset, and lockout with a “Do Not Operate” tag during repairs.
  • ASME B20.1. 1926.555 refers to the 1957 edition of ANSI B20.1. Its current form, ASME B20.1 (2024), the Safety Standard for Conveyors and Related Equipment, covers the hazards of conveyors in their design, installation, inspection, maintenance and operation.
  • Canada. Provinces have their own machine guarding and lockout rules.

This is information, not legal advice: check the rules that apply to your plant and the conveyor maker’s manual.

Conveyor checks in Maintensor: three procedures and a lockout step

Make three procedures: the operator’s shift walk, the weekly locked-out inspection, and the monthly drive service. Set each work order to repeat: the shift walk on Weekly with the working days ticked, the inspection weekly, the drive service monthly.

  • Start the weekly and monthly ones with an Instruction step naming the lockout points and the take-up to block, then a Checkbox marked Required: “Locked out, take-up blocked, start button tried.” A skipped required step does not stop anyone finishing, but it is listed at sign-off and written to the work order’s history.
  • Make each line an Inspection check, and each reading a Number step: belt deflection, take-up travel left, bearing temperature. A Number step has no unit, so put the unit and the limit in its words, such as “Take-up travel left, inches (fail under 6)”.
  • A Fail asks for a note and a photo, and offers a follow-up work order and Mark asset down. Add the idler or blade to the follow-up as a part; when one part goes onto the same conveyor three or more times this year, the asset says so and asks you to check for a recurring fault.
Two steps of a checklist on a work order: a belt deflection reading of 15 mm, and a failed pulley alignment check with the technician's finding written under it.
Two steps of a conveyor check on a work order: a belt deflection reading of 15 mm, and a failed pulley alignment check with the technician's finding written under it.

What it does not do: a repeat goes by the day, so a plant on two shifts makes two shift-walk work orders, one per shift. An operator answering the shift walk in the app needs a Full user seat; a Requester can report a torn belt but cannot answer a checklist.

The manufacturing maintenance page shows the rest of a plant’s setup, and the preventive maintenance checklist covers the other equipment on the floor.

Questions

What people also ask.

More in the checklists, or see the whole product on the features page.

How often should a conveyor belt be inspected?

Watch the running belt every shift for tracking, noise, spillage and guards, and test the pull cords and emergency stops weekly. Inspect splices, idlers, scrapers and the belt surface weekly with the conveyor locked out, service the drive monthly, and survey the whole line once a year. The belt and drive makers' manuals may set shorter intervals for your duty.

How do you know when a conveyor belt needs replacing?

Replace a belt when its top cover is worn through toward the carcass, when cuts or rips reach the carcass across its width, when its edges are frayed beyond repair, or when the take-up has run out of travel and the belt cannot be tensioned without a new splice. The belt maker gives the wear limit for your belt.

What causes a conveyor belt to run off center?

The usual causes are material stuck to a pulley or idler, an idler or pulley out of square with the frame, a seized roller, a load dropped off center at the loading point, a splice cut out of square, or a frame that is not level. Clean and square things before adjusting tracking idlers, or the belt walks again.

Do you have to lock out a conveyor to clean or adjust it?

Lock it out whenever hands or tools go past a guard or into a nip point, which OSHA 1910.147 covers even during production. Some tracking adjustments need the belt running, and are done only from outside the guards, by a trained person, as your written procedure and the conveyor maker allow. Never clean a running pulley or idler.