What is autonomous maintenance?

Autonomous maintenance (jishu hozen) is the pillar of total productive maintenance in which operators care for their own machines: they clean, inspect, lubricate and tighten to a written standard, and report what they cannot fix.

By MaintensorUpdated

What operators take on in autonomous maintenance, and what they hand off

The operator is beside the machine all shift and notices a new noise or a fresh drip first. Autonomous maintenance turns that into a routine with a standard: the operator cleans, inspects, lubricates and tightens, and anything beyond that goes to maintenance as a reported problem.

It is one of the eight pillars of total productive maintenance, and a natural first one to start on.

Lock out before cleaning inside a guard

Under OSHA’s 29 CFR 1910.147, cleaning and lubricating where an unexpected start-up could hurt someone is servicing, and the lockout rule applies. Train operators on the machine’s lockout procedure first. Check the rule against your own work; in Canada, your province’s occupational health and safety rules apply.

The seven steps

The usual program has seven steps, named as in Masaji Tajiri and Fumio Gotoh’s Autonomous Maintenance in Seven Steps:

1. Initial cleaningA deep clean, inside the guards; every abnormality gets a tag.
2. Countermeasures to sources of contaminationLeaks fixed, dirt stopped at the source, hard-to-reach points opened up.
3. Cleaning and lubricating standardsThe routine written down: what, how, how often, how long.
4. Overall inspectionLessons on the machine's drives, hydraulics, pneumatics and electrics.
5. Autonomous maintenance standardsThe routine revised with what step 4 taught.
6. Process quality assuranceThe settings and parts that make good product added to the checks.
7. Autonomous supervisionThe team runs and improves its own standards.

The TPM guide explains each step, and how to start on one machine with a check of ten minutes or less.

Autonomous maintenance example: a case packer’s 38 tags

ExampleA case packer on Line 1, at a made-up food plant

Three operators run it across two shifts. The initial cleaning, with a technician on hand and the machine locked out, produced 38 tags. The operators dealt with 22: dirty photo-eyes, loose guard bolts, missing labels on valves. The other 16 went to maintenance, such as a worn chain guide and a leaking air fitting.

The plant then split the work on the machine:

Task Operator Maintenance
Wipe photo-eyes and product guides Each shift
Read the air pressure against the green band Each shift, written down Adjusts the regulator if it is out
Oil the chain from the marked can Weekly Checks chain tension and wear monthly
Test the emergency stop and guard switches At start-up Repairs any that fail
Replace a worn chain guide Yes

The daily check takes about eight minutes: short enough to get done.

Autonomous maintenance vs technician PMs, required checks and TPM

  • Preventive and routine maintenance by technicians covers the skilled scheduled work; autonomous maintenance covers the daily basics.
  • Pre-use inspections required by a rule are narrower. In the US, OSHA requires powered industrial trucks to be examined before being placed in service, at least daily (29 CFR 1910.178(q)(7)); a forklift inspection checklist covers it.
  • Total productive maintenance is the program around it, with planned maintenance, improvement teams and training as other pillars.

Operator checks in Maintensor, and the seats operators need

The check becomes a procedure on a work order that repeats each production day; a Fail on an Inspection check asks for a note and a photo and offers a follow-up work order. Only Admins and Full users answer checklists, so each operator who does the check in the app needs a Full user seat.

Requesters are free on every plan but can only report a problem in words, which an admin approves into a work order or declines with a reason.

Questions

What people also ask.

More in the glossary, or see the whole product on the features page.

What is the difference between autonomous maintenance and preventive maintenance?

Autonomous maintenance is the daily basic care operators give their own machines: cleaning, inspecting, lubricating and tightening. Preventive maintenance is the scheduled work maintenance technicians do: services, part replacements, adjustments that need tools and training. The two divide the work on the same machine, and each makes the other easier.

Should operators do repairs in autonomous maintenance?

Generally no. Operators clean, inspect, lubricate, tighten and report. Repairs, adjustments that need special tools, and anything that needs a skilled trade stay with maintenance. A plant may train operators for a few simple tasks, such as changing a worn guide, once the daily routine is solid and the lockout procedure covers it.

Write the steps down once.

Start the trial and type one routine in as a procedure: the checks, the readings, a photo where it matters. Attach it to a job that repeats, and every technician works through the same list.