What is routine maintenance?

Routine maintenance is the small, frequent work that keeps equipment and buildings running: cleaning, lubricating, topping up, tightening and looking for problems. Each task takes minutes, and much of it is done by operators, drivers or housekeepers rather than technicians.

By MaintensorUpdated

What counts as routine maintenance

Routine maintenance is short, frequent and the same every time. Most of it is one of five things:

CleanLubricateTop up fluidsTighten and adjustLook and report

Most routines run by the calendar; some run by miles or engine hours, as the maker’s manual sets. It is the everyday end of preventive maintenance.

Who does routine maintenance

  • Operators clean and check their own machines at the start of a shift: in total productive maintenance, autonomous maintenance.
  • Drivers check their vehicles before a trip, as on a pre-trip inspection checklist.
  • Custodians and housekeepers see every room daily and report dripping faucets and dead lamps.
  • Technicians run the routes that need tools or training: grease routes and mechanical room rounds.

Some intervals are set by a rule. OSHA’s 29 CFR 1910.157(e)(2) requires portable fire extinguishers to be visually inspected monthly; provinces in Canada have their own rules.

Routine maintenance examples: daily, weekly and monthly tasks

Setting Task Who How often
Plant Wipe down a CNC machine, check coolant and way oil Operator Each shift
Plant Grease route on the conveyor bearings Technician Weekly
Warehouse Check forklift batteries: charge, water level, cables Driver Daily
Building Look at each fire extinguisher: in place, gauge, seal, tag Facilities staff Monthly
Fleet shop Walk-around: tires, lights, leaks, fluids Driver Before each trip
Hotel Test lamps, TV, air conditioner and drains while cleaning Housekeeper Each clean

Routine maintenance hours: small tasks, big total

Say a hotel engineer’s daily round has 12 checks at about 3 minutes each. The numbers are made up.

36 minA day
12 checks × 3 min
4.2 hA week
36 min × 7 days
218 hA year
4.2 h × 52 weeks

That is more than five 40-hour weeks. A round in nobody’s plan is the first thing dropped when a breakdown arrives, so give it an owner, a time in the day and a written route. The preventive maintenance schedule guide builds rounds into a schedule.

Routine vs preventive, scheduled and corrective maintenance

  • Routine vs preventive: routine is the small, frequent part of preventive work.
  • Routine vs scheduled: routine tasks are scheduled by nature, but most scheduled maintenance is bigger than a round.
  • Routine vs corrective: what a round finds becomes corrective maintenance, written up as its own job.

A round ticked the same way for months may not be happening: see pencil whipping.

Rounds in Maintensor: a repeating work order with a checklist

Procedures are the maintenance checklist software part of Maintensor, and a round is a procedure on a work order that repeats daily, or weekly on chosen weekdays. Steps can be a Checkbox, a Number for a reading, an Inspection check answered Pass, Flag or Fail, or a Photo.

A Fail asks for a note and a photo, then offers a follow-up work order. Repeats follow the calendar only: a task the manual sets by miles or run hours needs the calendar interval it usually works out to.

Only Admins and Full users answer checklists, so an operator, driver or housekeeper who does a round needs a user seat; free Requesters can only report a problem. There is no ready-made library of rounds: you build each one once.

Questions

What people also ask.

More in the glossary, or see the whole product on the features page.

What is the difference between routine maintenance and preventive maintenance?

Routine maintenance is the small, frequent end of preventive maintenance: daily wipe-downs, weekly greasing, monthly visual checks. Preventive maintenance also includes larger scheduled jobs that are not routine, such as a yearly boiler shutdown and cleaning or a gearbox oil change with a sample sent to a lab. All routine maintenance is preventive; not all preventive maintenance is routine.

Who is responsible for routine maintenance?

Routine maintenance is usually shared. Operators, drivers, custodians and housekeepers do the checks on the equipment and rooms they use every day, and technicians do the routes that need tools or training, such as greasing and mechanical room rounds. The maintenance lead owns the list: what is checked, by whom, how often, and what happens when a check finds a problem.

Write the steps down once.