Pre-trip inspection checklist

A pre-trip inspection checklist lists the driver's checks before a commercial vehicle leaves: brakes, steering, lights, tires, coupling and emergency equipment. In the US, a report (the DVIR) is needed only for a defect; in Canada, one every 24 hours.

Free, no sign-up. Print it, or type into the Word file.

By MaintensorUpdated

Page 1 of the blank pre-trip inspection and DVIR form: the trip details, then the engine compartment, cab and controls, and air brake checks, each with a box for OK and Defect and a line for a note.
Page 1 of 2

The checks, engine to trailer

Work in the sheet’s order. With the engine off: under the hood and a look for leaks. Then start the engine for the cab and the air system, then the lights, and last the walk-around: tires, wheels, coupling, trailer and load.

Engine compartment (engine off, parking brake set)4 checks

  • Oil, coolant, power steering and washer fluid
  • Belts, including the air compressor belt
  • Hoses and wiring
  • Steering box and linkage

Cab and controls (engine running)11 checks

  • Seat belt
  • Doors
  • Gauges and warning lamps
  • Steering wheel play
  • Horn
  • Wipers and washer
  • Defroster and heater
  • Windshield and mirrors
  • Emergency equipment
  • Parking brake
  • Service brake

Air brakes6 checks

  • Pressure build-up
  • Leaks
  • Leak-down test, engine off
  • Low-air warning
  • Spring brakes and tractor protection
  • Chambers, hoses and slack adjusters

Lights and reflectors (lights and four-way flashers on)3 checks

  • Headlamps, low and high beam
  • Tail, brake, turn and four-way lamps
  • Clearance, marker and identification lamps, reflectors and reflective tape

Tires, wheels and hubs4 checks

  • Tread depth
  • Pressure and condition
  • Wheels and nuts
  • Hub seals

Suspension, frame, exhaust and fuel4 checks

  • Springs, U-bolts and air bags
  • Frame
  • Exhaust
  • Fuel tank

Coupling (tractor and semitrailer, or pintle hitch)4 checks

  • Fifth wheel mounting
  • Jaws and kingpin
  • Air and electrical lines
  • Pintle hook and safety chains

Trailer and cargo4 checks

  • Landing gear
  • Tandem slider
  • Doors, tailgate and tarps
  • Cargo and tiedowns
What counts as a defect, check by checkThe full tables, with the defects Canada counts as major.

The Major column marks the items Canada’s NSC Standard 13 calls major defects, with which no one may drive. A blank there does not make a defect safe to drive with: a loose steering part still parks the truck.

Engine compartment (engine off, parking brake set)

Check What counts as a defect Major
Oil, coolant, power steering and washer fluid Below the mark, or a fresh drip under the engine
Belts, including the air compressor belt Cracked, frayed, glazed or loose
Hoses and wiring Hose cracked, bulging or leaking; wire chafed or loose
Steering box and linkage Missing nut, bolt or cotter pin; leaking box; a crack or welded repair

Cab and controls (engine running)

Check What counts as a defect Major
Seat belt Missing, loose, or will not latch Major
Doors A cab or sleeper door will not close securely Major
Gauges and warning lamps Oil pressure, temperature or charging out of range; a warning lamp stays on; the ABS lamp does not light at start-up and then go out
Steering wheel play More than normal. Appendix A to Part 396 sets limits by wheel size: on a 20 inch wheel, 2½ inches manual or 5¼ inches power Past the limit
Horn Does not sound
Wipers and washer Blade torn or missing; fails to clear the driver’s view In rain or snow
Defroster and heater Defroster does not clear the windshield Major
Windshield and mirrors Crack or damage in the driver’s view; a mirror missing, broken, loose or badly aimed
Emergency equipment Fire extinguisher missing, not charged or not mounted; warning devices short: three reflective triangles, or the fusees the rule allows instead (393.95)
Parking brake The vehicle moves when gently pulled against it in low gear Major
Service brake Pedal fades or sinks under steady pressure, or the vehicle pulls to one side in a low-speed stop Pedal fade

Air brakes

Check What counts as a defect Major
Pressure build-up Builds slowly, or the governor cuts out outside the range in your driver’s manual
Leaks Any air leak you can hear, brakes released or applied
Leak-down test, engine off Pressure falls faster than the limit in your driver’s manual Major
Low-air warning No warning as pressure is fanned down. Appendix A fails a warning that does not work at 55 psi and below (or half the governor cut-out pressure, if lower) Major
Spring brakes and tractor protection Spring brakes do not apply as pressure falls; trailer brakes do not apply when the trailer supply is cut (393.43) Major
Chambers, hoses and slack adjusters Broken or missing part; hose chafed, kinked or leaking; pushrod stroke past its limit in 393.47 Past the limit

On hydraulic brakes, check instead that fluid is at the mark (less than a quarter full is major), the pedal holds firm and the power assist works.

Lights and reflectors (lights and four-way flashers on)

Check What counts as a defect Major
Headlamps, low and high beam Out, or cracked lens Both low beams out
Tail, brake, turn and four-way lamps Out, or cracked lens Both rear tail lamps, both rear brake lamps, or a rear turn signal out
Clearance, marker and identification lamps, reflectors and reflective tape Out, missing, or covered by dirt or load (393.9)

Tires, wheels and hubs

Check What counts as a defect Major
Tread depth Less than 4/32 inch (3.2 mm) on a front tire of a truck or tractor, or 2/32 inch (1.6 mm) on any other (393.75) Major
Pressure and condition Flat, or a leak you can hear; cut to the cords; bulge or separation; marked not for highway use; touching another tire Flat, cords showing, marked not for highway use, or touching
Wheels and nuts Loose, missing or broken nut; rust streaks from a nut (a sign it is loose: check it); cracked wheel or rim Loose, missing or broken nut, or a cracked wheel or rim
Hub seals Oil below the sight glass mark, or oil on the wheel

Suspension, frame, exhaust and fuel

Check What counts as a defect Major
Springs, U-bolts and air bags Broken or shifted leaf; loose U-bolt; air bag leaking or flat Loose U-bolt, flat air bag, broken main leaf or a shifted part
Frame Cracked, sagging or shifted member Major
Exhaust Leak under or ahead of the cab Fumes in the cab
Fuel tank Cap missing; tank loose; fuel dripping Loose tank or dripping fuel

Coupling (tractor and semitrailer, or pintle hitch)

Check What counts as a defect Major
Fifth wheel mounting Loose or missing bolts; cracked plate or bracket; the fifth wheel shifts on its mounting Cracked plate or bracket, or shifts on its mounting
Jaws and kingpin Jaws not closed around the kingpin; release handle not locked; a gap between the fifth wheel and the trailer Major
Air and electrical lines Glad hand leaking or seal torn; line chafing, kinked or dragging
Pintle hook and safety chains Latch not locked; chains missing or not attached (393.70) Major

Trailer and cargo

Check What counts as a defect Major
Landing gear Not fully raised, or crank handle loose
Tandem slider Locking pins not fully engaged
Doors, tailgate and tarps Not latched or secured
Cargo and tiedowns Load can shift or fall; strap cut or frayed, chain link worn (393.104) Major

The trailer inspection checklist covers the trailer in full, with its yearly checks.

The report at the end of the day

One page per vehicle per day. The US rule asks for the vehicle, the defects and the signatures; Canada’s also asks for the carrier, the time and place and the odometer, and a report even when there are no defects. A fleet that runs in both countries uses every line.

CarrierCompany name.
VehicleUnit number and plate; trailer number too.
When and whereDate, time, city or highway.
OdometerThe reading at the inspection.
DefectsEach defect found or reported, or "no defects".
DriverPrinted name and signature.
RepairRepaired, or repair not needed; by whom and when; signature.
Next driverReviewed, with signature.

File the signed reports with each vehicle’s maintenance log, so a defect and its repair can be found together later.

Write the defect so a mechanic can find it

“Brakes bad” sends a mechanic hunting. “Right rear trailer brake chamber leaking air when applied” does not. Ticking every box without looking has a name, pencil whipping, and it is the usual way a daily check stops working.

Before you start

Who and when
The driver, before the first trip of the day and whenever taking over a vehicle. In Canada, at least every 24 hours.
Add your makers' items
Add the items in your truck and trailer makers’ manuals, and follow your state’s or province’s commercial driver’s manual for the air brake tests.
A starting point
This list does not replace a commercial driver’s license or training. The fleet maintenance guide covers the rest of a small fleet’s program.

When a check fails

If the defect affects safe operation, the vehicle does not leave: tag the key, tell the shop and write the defect on the report. Smaller defects go on the report for the shop to fix.

What the rules require

In the US, the driver must be satisfied before driving that the vehicle’s brakes, steering, lights, tires, coupling and emergency equipment are in good working order, and writes a report at the end of the day only when a defect was found or reported. In Canada, NSC Standard 13 asks for an inspection and a written report every 24 hours.

What the rules sayThe US rules before, during and after the trip, who they cover, and Canada's NSC Standard 13.

United States

  • Before driving. The driver must be satisfied that the service brakes (with trailer brake connections), parking brake, steering, lights and reflectors, tires, horn, wipers, mirrors, coupling devices, wheels and rims and emergency equipment are in good working order (392.7), and that the emergency equipment is in place (392.8).
  • The last report. If the last report listed defects, the driver reviews it and signs it, to acknowledge the review and that the repairs have been certified (396.13).
  • On the road. Cargo and its tiedowns are checked within the first 50 miles, then again at each change of duty status, every 3 hours or every 150 miles, whichever comes first (392.9).
  • At the end of the day. The driver writes and signs a driver vehicle inspection report for each vehicle driven, covering the same items and listing any defect that would affect safety or cause a breakdown (396.11).
  • With no defects. No report is needed when no defect was found or reported: property carriers were relieved of it in December 2014, passenger carriers in 2020.
  • Repairs and records. The carrier repairs each listed defect that affects safety, signs that it was repaired or that repair is unnecessary, and keeps the reports three months. A rule in force since March 23, 2026 made explicit what was already allowed: the report may be made and kept electronically, under 49 CFR 390.32.
  • Who it covers. Commercial motor vehicles in interstate commerce, mainly those rated at 10,001 pounds or more. Section 396.11 does not apply to a carrier with one vehicle, driveaway-towaway operations or private non-business passenger carriers. States set rules for trucks that stay in the state.

Canada

NSC Standard 13 covers trucks, tractors and trailers over 4,500 kg registered weight, and each province puts it into its own rules:

  • Inspect to Schedule 1 every 24 hours, from a copy of the schedule the carrier provides.
  • Write a report each time, recording “no defects” when there are none. It names the vehicle’s plate or unit number, the carrier, the date, time and place, and the odometer reading if there is one, with the printed name and signature of the person who inspected, and of the driver if different.
  • The driver carries the schedule and the report, and shows them to an inspector on demand.
  • Minor defects are reported to the carrier before the next inspection. Major defects are reported at once, and no one may drive with one.
  • The driver hands the report in within 20 days; the carrier keeps it with the repair certification for at least six months.

These are summaries for information. Read the rule that applies to you.

A pre-trip procedure in Maintensor: odometer, name and signature

Build the checklist once as a procedure: a Heading step for each area, an Inspection check for each line (Pass, Flag or Fail), a Number step for the odometer, a Text step for the driver’s printed name, and a Signature step at the end. There is no built-in DVIR or pre-trip form, so this page is the template.

  • The name step is needed because a Signature step stores the drawn signature and the time, not which user signed.
  • Attach the procedure to a work order on each truck that repeats Weekly on the days it runs, or Daily. The fleet page shows a pre-trip check in use.
  • On a Fail, the driver cannot go on until there is a note and a photo, and is then offered a follow-up work order for the shop and Mark asset down, which sets the truck’s status to Down.
Run mode on a failed check: Fail is chosen for the pulley alignment, the finding is written, a photo is asked for, and a follow-up work order is offered.
Run mode on a failed check, here a pulley alignment on a plant checklist: the finding is written, a photo is asked for, and a follow-up work order is offered. A failed brake lamp works the same way.

What it does not do: only Full users and Admins answer checklists, so a driver who does the inspection in the app needs a Full user seat. A driver with the free Requester role can report a defect, picking the truck, but cannot answer a checklist. The app runs in a phone’s browser and needs a network connection.

The app does not print or export the report, so a Canadian driver who must show the report on demand may still carry it on paper. Whether a record kept in the app meets 396.11, 390.32 or your province’s rules is yours to check: Maintensor records what was done and certifies nothing.

Questions

What people also ask.

More in the checklists, or see the whole product on the features page.

Is the pre-trip inspection checklist free?

Yes. The PDF and Word files are free to download, with no sign-up, and free to print, copy and change for your own trucks.

Is a pre-trip inspection required by law?

In the US, 49 CFR 392.7 and 396.13 require the driver of a commercial motor vehicle to be satisfied that it is in safe operating condition before driving, but the federal rules do not require a written pre-trip form. In Canada, National Safety Code Standard 13, as each province adopts it, requires a trip inspection every 24 hours with a written report.

When does a driver have to fill out a DVIR?

Under 49 CFR 396.11, a driver writes a driver vehicle inspection report at the end of each day's work on each vehicle driven, but only when a defect was found or reported. Since December 2014 for property carriers, and 2020 for passenger carriers, no report is needed when there are no defects. A motor carrier with one vehicle is exempt.

How long must driver vehicle inspection reports be kept?

In the US, the carrier keeps each driver vehicle inspection report, the repair sign-off and the next driver's review for three months from the date the report was written, under 49 CFR 396.11(a)(4). In Canada, NSC Standard 13 asks carriers to keep each trip inspection report and its repair certification for at least six months.

Can a pre-trip inspection report be electronic?

Yes. In the US, 49 CFR 390.32 allows required records and signatures to be electronic, and since March 2026 sections 396.11 and 396.13 say so directly. The electronic record has to be retainable and reproducible when an official asks for it. In Canada, NSC Standard 13 accepts a report in an equivalent electronic format.

Put your trucks and trailers on the calendar.

Start the trial, add each vehicle with its VIN, set its services to repeat by date, and keep every repair on its record. Services come due by the calendar, not by mileage.

30-day free trial. No credit card.