What is proactive maintenance?

Proactive maintenance goes after the causes of failure, such as misalignment, dirty oil or careless installation, rather than the failures. Preventive work replaces the belt before it fails; proactive work asks why the belt keeps failing and fixes that.

By MaintensorUpdated

Proactive maintenance, loosely and strictly defined

Loosely, proactive means anything that is not reactive: preventive, condition-based and predictive work all count.

Strictly, it means going after causes. NASA’s reliability-centered maintenance guide for its facilities (2008) defines it as “the collection of efforts to identify, monitor and control future failure with an emphasis on the understanding and elimination of the cause of failure.” Its techniques include precision rebuild and installation, failed-part analysis and root-cause failure analysis. This entry uses the strict sense.

Symptom or cause

The usual fix replaces the part. Asking why it failed early finds causes like these:

Pump bearings fail every few monthsMisalignment, too much grease, or dirt in the grease.
A press's hydraulic pump keeps failingDirty oil from a missing breather or a skipped filter.
A rooftop unit trips on hot daysA dirty condenser coil.
Guest-room door closers breakA closer too small for a heavy fire door.

Proactive maintenance example: a V-belt changed 10 times a year

A conveyor’s V-belt has been replaced 10 times this year. Asking why (the 5 whys is a good method) finds worn grooves on the drive pulley and a motor out of line with it. A new pulley, fitted and aligned on a weekend, fixes the cause.

$2,800Belts a year, before
10 changes × $280
$855The first year after
$435 fix + $420 of belts
$420Each year after that
1.5 belts × $280
The numbers, line by lineEvery number is made up.
Item Figure
One belt change: an hour at $45, a $35 belt, 30 minutes of stopped line at $400 an hour $280
Ten changes a year $2,800
The fix: a new pulley at $300, and 3 hours at $45 to fit and align it $435, once
Belts after the fix, each lasting eight months: 12 ÷ 8 1.5 a year, or $420
The first year: $435 + $420 $855

Preventive maintenance could only have made the belt changes tidier. Aligning shafts and pulleys to a measured standard is precision maintenance.

Three repeats in a quarter

Once a month, sort closed work orders by asset. Any asset with the same repair three times in a quarter gets a why, a fix for the cause, and a new check on its preventive checklist. The root cause analysis guide covers the method.

Proactive vs reactive, preventive and predictive, on one pump

Approach The question it asks On a pump
Reactive It failed: what do we fix? Replace the seized pump
Preventive When is it due? Grease it every month
Condition-based and predictive Is it starting to fail? A vibration reading shows a bearing defect
Proactive Why does it fail at all? Fix the misalignment that wears out the bearings

The types of maintenance guide sets all of them side by side.

Repeat-failure warnings and problem assets in Maintensor

Maintensor points at repeat failures but does not analyze them. When one part has been used on an asset three or more times this year, the asset’s record says so and adds: “Check for a recurring fault.” On Pro and Max, Reporting’s Assets view ranks the most problematic assets for admins, with their unplanned downtime, reactive work orders, MTBF and repair cost.

A conveyor's work orders: four open with their due dates, a note that a V-belt has been used on it 10 times this year, and the latest finished jobs with their parts cost.
A conveyor's work orders, with a note that a V-belt has been used on it 10 times this year.

There is no root cause analysis tool, and no failure code or cause field: the cause goes in the work order’s notes. A new check goes into the procedure as a new version, which the next recurring work order picks up.

Questions

What people also ask.

More in the glossary, or see the whole product on the features page.

What is the difference between proactive and preventive maintenance?

Preventive maintenance does scheduled work so a known failure happens less often: grease the bearing every month. Proactive maintenance asks why the failure happens at all and removes the cause: align the shaft that is wearing out the bearings. Preventive work treats a failure as a fact to manage; proactive work treats it as a problem to solve. Most crews need both.

Is predictive maintenance proactive?

In the loose sense, predictive maintenance is proactive, because it acts before a failure. In the strict sense it is not: predictive maintenance detects a failure developing so the repair can be planned, while proactive maintenance removes the cause so the failure stops developing. A vibration reading that finds a bad bearing is predictive; fixing the misalignment that ruined it is proactive.