Key points
- It has five lines: labor, parts, contractors, tools and training, and a contingency priced by a quote.
- Build it from the asset list, the preventive schedule and last year's work orders.
- Check the planned hours against the hours logged on work orders last year, not the hours paid.
- In the worked example, the crew's pay is 74 percent of the budget and mostly stays put.
- The 2 to 4 percent of replacement value rule was written for many buildings, not one small site.
What a maintenance budget covers
A maintenance budget is an operating budget: the money to keep what you have working for twelve months. It has five lines.
| Line | What it holds |
|---|---|
| Labor | Straight-time pay with payroll taxes and benefits, plus overtime |
| Parts | Preventive parts, repair parts, spares to stock |
| Contractors | Contracts and call-outs for work your crew does not do |
| Tools, training and rentals | Tools, courses, a rented lift |
| Contingency | A failure you can name but cannot date, priced by a quote |
Build it from the work, not from a percentage of what the site is worth, and track it monthly, so a line running over shows up in March, not December.
New equipment, expansions and big replacements usually go in the capital budget, and accounting rules draw the line. Ask your accountant which side each big job goes on before the year starts.
Repair or improvement: what the tax rules sayThe US and Canadian tests, with a link to each
Repair or improvement is a tax question too. In the United States, the IRS’s tangible property regulations treat a betterment, a restoration or an adaptation to a new use as an improvement to capitalize. They give a safe harbor for routine maintenance: recurring work that keeps property in its ordinarily efficient operating condition.
In Canada, the CRA’s business income guide asks whether a cost gives a lasting benefit, and whether it restores a property or improves it beyond its original condition.
How to build a maintenance budget in seven steps
- Group the assets, with a count, from your asset register: a budget needs groups, not serial numbers.
- Add up preventive hours and parts for each group, from your preventive maintenance schedule.
- Count last year’s repairs from the work orders: hours logged, parts used. Adjust for known changes, such as a machine replaced or a shift added. Take credit for fewer breakdowns only once a year of records shows it.
- Check the hours against the crew’s logged hours from last year. A gap becomes overtime, a contractor or a hire, and the budget says which.
- Price the labor. Straight time is
people × paid hours × loaded rate, the loaded rate being the wage plus payroll taxes and benefits. Overtime comes from last year’s call-ins. - List the contractors by trade, each with its contract, a quote or last year’s call-outs.
- Name the contingency: the failure most likely to land this year that no other line covers, priced by a quote.
Then set the total beside last year’s actual spending, with a sentence for each line that moved.
Maintenance budget example: a plant with a crew of three
Riverside Plant’s budget comes to $419,660. The plant and every number here are made up, and round, to show the arithmetic. It is one building with two packing lines. Maria Chen manages maintenance with three technicians: Ben Carter, James O’Neil and Ana Kovac. At this plant Maria’s own pay sits in plant overhead, so it is not in this budget. Where your manager sits is a question for finance.
The total
| Line | Amount |
|---|---|
| Labor | $309,600 |
| Parts | $56,560 |
| Contractors | $33,000 |
| Tools, training and rentals | $8,500 |
| Contingency | $12,000 |
| Total | $419,660 |
Nearly three quarters is the crew’s pay (309,600 ÷ 419,660 = 74 percent). Its straight time, $299,520, hardly moves whatever the year brings. Everything else, 419,660 − 299,520 = $120,140, is where surprises land.
Here is where each line comes from.
The preventive work, from the schedule
The schedule’s seven groups come to 1,024 hours and $21,360 of parts a year.
The schedule, group by groupEach group's count, its services, its hours and its parts.
| Asset group | Count | Schedule, each asset | Hours a year | Parts a year |
|---|---|---|---|---|
| Packing machines | 8 | Monthly service 4 h, yearly overhaul 16 h | 8 × (12 × 4 + 16) = 512 | 8 × (12 × $45 + $600) = $9,120 |
| Conveyors | 14 | Quarterly check 2 h | 14 × 4 × 2 = 112 | 14 × $150 = $2,100 |
| Air compressors | 3 | Monthly check 1 h, yearly service 8 h | 3 × (12 × 1 + 8) = 60 | 3 × $900 = $2,700 |
| Forklifts | 4 | Quarterly service 3 h | 4 × 4 × 3 = 48 | 4 × 4 × $120 = $1,920 |
| Rooftop units | 6 | Quarterly filters 2 h, belts once a year | 6 × 4 × 2 = 48 | 6 × (4 × $60 + $80) = $1,920 |
| Dock doors and levelers | 6 | Quarterly check 1.5 h | 6 × 4 × 1.5 = 36 | 6 × $100 = $600 |
| Building rounds | 1 route | Weekly 4 h | 52 × 4 = 208 | Lamps and plumbing parts, $3,000 |
| Total | 1,024 h | $21,360 |
Repairs, from last year’s work orders
Last year the plant closed 380 reactive work orders, with 1,140 hours logged and $36,000 of parts. The oldest case packer, which took 140 of those hours and $6,000 of the parts, was replaced in December from the capital budget. The main parts vendors have announced increases of about 4 percent.
So this year’s repairs are:
- Hours:
1,140 − 140 = 1,000 - Parts:
($36,000 − $6,000) × 1.04 = $31,200
Only repair parts get the 4 percent, because it starts from last year’s prices. The schedule’s parts above, and the pay rates, contracts and quotes below, are this year’s. Call-outs and invoices carried from last year stay flat because no trade here has announced a rise; if yours has, raise them too.
Add 200 hours of other work (installs, moves, shutdown help), the same as last year.
Can the crew do it?
Yes. This year’s plan is 1,024 + 1,000 + 200 = 2,224 hours. Last year the technicians logged 2,320 hours on work orders, 96 more. The plan fits what the crew really delivered: no hire, no extra contractor.
Compare logged with logged
Do not compare with paid hours. The crew is paid for 3 × 2,080 = 6,240 hours, but holidays, vacation, training, walking, waiting for parts and unwritten jobs take most of that, as the wrench time entry explains.
Labor
- Straight time:
3 technicians × 2,080 paid hours × $48 loaded rate = $299,520 - Overtime: 180 hours of call-ins, as last year:
180 × $56 = $10,080
Together, labor is $309,600.
The $48 is a $34 wage plus payroll taxes and benefits. An overtime hour is time and a half on the wage, $51, plus $5 of payroll taxes; benefits here do not rise with overtime. In the United States, the Fair Labor Standards Act requires at least time and a half for non-exempt employees’ hours over 40 in a workweek (US Department of Labor). In Canada, each province sets its own rules.
Parts, contractors and the rest
Parts come to $21,360 preventive + $31,200 repairs + $4,000 critical spares = $56,560. The spares are a case packer gearbox at $2,600 and a conveyor motor at $1,400.
Six trades come to $33,000: the crew does not do this work.
The contractors, trade by tradeWhat each does, and whether the figure is a contract, a quote or last year's bills.
| Trade | What | Basis | Amount |
|---|---|---|---|
| HVAC contractor | Spring and fall service, plus repairs | Contract $7,200 + last year’s call-outs $3,000 | $10,200 |
| Fire protection contractor | Sprinkler, alarm and extinguisher testing | Contract | $6,500 |
| Electrician | Infrared scan of the panels, plus repairs | Quote $1,800 + last year’s call-outs $5,000 | $6,800 |
| Forklift dealer | Repairs beyond the crew’s skills | Last year’s invoices | $4,000 |
| Overhead door company | Dock door springs and repairs | Last year’s invoices | $3,000 |
| Roofer | Inspection after winter, small repairs | Quote | $2,500 |
| Contractors | $33,000 |
Tools, training and rentals come to $8,500: $4,000 of tools and consumables, $3,000 of training, and $1,500 to rent a scissor lift for a week.
The contingency has a name
Compressor C-1 is 21 years old, runs hot in summer and leaks oil at the airend, and the dealer has quoted $12,000 to rebuild the airend. If C-1 holds out, the money stays unspent. A flat percentage is a guess; a dealer’s quote is something the approver can check.
Tracking the budget month by month
Spread each line over the months it will be spent in: the overhauls in the July shutdown, the roofer after winter. Straight-time pay needs watching only for headcount, so it stays off the monthly sheet, and so does the contingency until it is drawn.
At the end of March the made-up plant is $2,820 over budget to date.
March, line by lineBudget, actual and the reason for each line
| Line | Budget to date | Actual to date | Difference | Why |
|---|---|---|---|---|
| Overtime | $2,520 | $4,480 | +$1,960 | C-1 tripped on two February weekends: 35 extra hours |
| Preventive parts | $3,680 | $3,540 | −$140 | On plan |
| Repair parts | $7,800 | $10,900 | +$3,100 | Conveyor CV-7 gearmotor $2,400, C-1 cooling fan $700 |
| Critical spares | $4,000 | $4,000 | $0 | Bought in January |
| Contractors | $8,000 | $6,200 | −$1,800 | Electrician’s scan moved to April |
| Tools, training, rentals | $2,000 | $1,700 | −$300 | |
| Total | $28,000 | $30,820 | +$2,820 |
Read it in three steps:
- Separate timing from real. The electrician’s $1,800 scan moved to April, so that money is not saved, only late. Put it back and the quarter is over by
2,820 + 1,800 = $4,620. - Find the cause. Compressor C-1 accounts for
1,960 + 700 = $2,660of that: $1,960 of overtime after it tripped on two February weekends, and a $700 cooling fan. - Carry it to the year. If the next three quarters go like the first, C-1’s breakdowns cost
4 × 2,660 = $10,640this year, most of the $12,000 rebuild, which is still needed at the end. That is the case for drawing the contingency now.
Agree a threshold with the approver, such as 10 percent or $1,000 over budget to date, and explain each line past it. The maintenance KPIs guide has a one-page monthly report this sheet can join.
Making the case to the person who approves it
Show what a round-number cut really takes before anyone agrees to one, then argue each line at risk. An approver tends to see one number, and a cut as a percentage of it. Straight-time pay cannot give any of the cut without a layoff, so it all falls on the $120,140 that can move.
10% of $419,660
41,966 ÷ 120,140
Argue each line at risk with four facts: what it buys, what happens without it, what that cost last time (from your records), and who accepts the risk if it goes. Three lines from the made-up plant:
The three linesA spare gearbox, a roof inspection and the C-1 rebuild: what each costs, and what going without it cost
| Line | Amount | Without it | What it cost last time (made up) |
|---|---|---|---|
| Spare case packer gearbox | $2,600 | The next failure waits for a courier | Last spring Line 2 waited 3 hours for one, costed at about $6,000 on the downtime cost worksheet |
| Roofer’s spring inspection | $2,500 | Loose flashing is found by the next leak | A storeroom leak two years ago: $1,800 of ceiling tiles, $3,200 of soaked stock |
| C-1 rebuild contingency | $12,000 | The failure is paid from other lines, or approved in a hurry | Last August: call-ins, 18 h × $56 = $1,008, and a rental compressor for a week, $2,000 |
If a line is cut anyway, do not quietly drop the work. Put it on the deferred maintenance list with the date and its price, and ask for the decision in writing, so next year’s budget starts from a list the approver has seen.
When a percentage rule of thumb misleads
Budgets are often quoted as a percentage of what the assets would cost to replace, usually 2 to 4 percent. At a small site that percentage misleads in four ways:
Use it, if at all, as a question once the budget is built: if yours is far outside the range, can you say why?
Where 2 to 4 percent comes fromThe 1990 report, what later reports said of it, and the plant metric
The 2 to 4 percent figure with a clear source is the National Research Council’s, from its 1990 report Committing to the Cost of Ownership: routine maintenance and repair for “a substantial inventory of facilities” typically takes 2 to 4 percent of their aggregate current replacement value.
A later NRC report calls it widely quoted, while noting that there is no single, agreed-upon guideline for how much is adequate. GAO recommended that NASA fund maintenance at that level in 1990.
For plants, SMRP’s metric 1.5 sets total maintenance cost against replacement asset value to compare sites. SMRP’s material on it is paid, so no target from it is quoted here.
What Maintensor records toward a budget
Maintensor keeps the hours and costs the budget sheet is built from.
- Time, on every plan. Time runs on a work order from Start work until the job is put on hold or done, and Add time and Fix time enter or correct it by hand. That gives step 3 from records, not memory.
- Cost, on Max. An Admin sets each person’s hourly rate. A work order adds labor cost and other costs (Contractor, Equipment rental, Travel or Other) to its parts, with totals per work order and per asset. Below Max, an asset’s costs are parts only.
- The month’s actuals. Reporting is open to Admins on Pro and Max. The Cost and labor view, on Max, shows total cost, labor, parts and other costs for a date range, with labor utilization. Plans are on the pricing page.

What it does not do
Maintensor does not hold the budget: there is no budget to enter, no forecast and no export. The plan and the monthly sheet stay in your spreadsheet. Costs count in the month a work order is completed, and a yearly contract counts only if it is entered on a work order.