Roof inspection checklist for commercial roofs

A roof inspection checklist covers a commercial roof's membrane, seams, flashing, drains, curbs and penetrations, and the ceiling underneath. The roofing contractors' association recommends an inspection at least twice a year, in spring and fall, and after severe weather.

Free, no sign-up. Print it, or type into the Word file.

By MaintensorUpdated

Page 1 of the blank roof inspection checklist: the building and roof area, the date and who checked, then the checks of access, edges and skylights, the field of the roof, seams, flashing and penetrations, and drains, scuppers and gutters, each with a box for OK and Fail and a line for a note.
Page 1 of 2

The checks, by area

One sheet per roof and visit, for single-ply (TPO, PVC, EPDM), built-up, modified bitumen and metal panel roofs. Water still standing 48 hours after rain is a fail, and so is anything that can let water in: each becomes a work order with a photo and a due date.

Access, edges and skylights4 checks

  • Hatch or roof door
  • Guardrails (OSHA 1910.29) and anchors (maker's manual)
  • Skylights (OSHA 1910.28(b)(3))
  • Walkway pads to equipment

The field of the roof8 checks

  • Standing water
  • Membrane surface
  • Blisters and wrinkles
  • Built-up and modified bitumen
  • Ballast
  • Underfoot
  • Metal panels
  • Debris

Seams, flashing and penetrations6 checks

  • Seams and laps (run a blunt, rounded tool along them)
  • Base flashing at walls, parapets and curbs
  • Counterflashing, coping and edge metal
  • Pipe boots and vents
  • Pitch pans
  • Expansion joints

Drains, scuppers and gutters3 checks

  • Roof drains
  • Overflow drains and scuppers
  • Gutters and downspouts

Rooftop equipment and curbs6 checks

  • Equipment curbs
  • Access panels
  • Condensate lines
  • Kitchen exhaust fans
  • Pipe and conduit supports
  • Equipment no longer used

From inside, below the roof4 checks

  • Ceiling tiles and the underside of the deck
  • Roof drain pipes inside
  • Top-floor walls under parapets
  • Leaks reported since the last round
What counts as a fail, check by checkThe full tables, area by area.

Every line is common practice, to adjust with your roof maker’s guide, unless a rule or NRCA is named.

Access, edges and skylights

Check Fail if
Hatch or roof door Will not stay open, or is left unlocked
Guardrails (OSHA 1910.29) and anchors (maker’s manual) A rail loose or missing; an anchor damaged or corroded
Skylights (OSHA 1910.28(b)(3)) Cover or screen missing, cracked or loose
Walkway pads to equipment Missing, loose, or the membrane beside them worn

The field of the roof

Check Fail if
Standing water Still there 48 hours after rain, in drying weather (NRCA’s definition of ponding)
Membrane surface Punctures, cuts, splits, or worn through near equipment
Blisters and wrinkles New, larger than in the last photos, or split open
Built-up and modified bitumen Bare spots where gravel or granules are gone; cracking
Ballast Stone or pavers blown off or piled up; bare membrane showing
Underfoot A soft or spongy spot, which may be wet insulation
Metal panels Rust through, loose or missing fasteners, open laps
Debris Branches, trash, screws and cut-offs: bag them and take them down

A puddle the morning after rain is not yet a fail; one still there on the third day is. NRCA’s roofing manual uses the same 48 hours to judge whether a roof drains properly.

Seams, flashing and penetrations

Check Fail if
Seams and laps (run a blunt, rounded tool along them) The tool slips in, or an edge lifts
Base flashing at walls, parapets and curbs Pulled away, split at a corner, or sagging
Counterflashing, coping and edge metal Loose, lifted, open joints, missing fasteners or sealant
Pipe boots and vents Split boot, loose clamp, open top
Pitch pans Filler shrunk away from the pipe, or cracked
Expansion joints Cover torn or pulled loose

Drains, scuppers and gutters

Check Fail if
Roof drains Strainer dome missing or broken; debris in the bowl; clamp ring loose
Overflow drains and scuppers Blocked, or stains below showing water has run through them
Gutters and downspouts Blocked, pulling away, leaking at the joints

Rooftop equipment and curbs

Check Fail if
Equipment curbs Flashing open at corners; curb rusted or rotted
Access panels Loose or missing; screws lying on the membrane
Condensate lines Broken, or draining onto a seam
Kitchen exhaust fans Grease on the membrane, which damages some membranes (ask the maker)
Pipe and conduit supports On bare membrane, sunk in, or cutting it
Equipment no longer used A dead unit, curb or pipe left on the roof: the roofer removes it and patches

The service on the units themselves is in the HVAC maintenance checklist.

From inside, below the roof

Check Fail if
Ceiling tiles and the underside of the deck Stains, wet tiles, rust or drips
Roof drain pipes inside Drips at the drain body or the joints
Top-floor walls under parapets Stains, peeling paint, white salt deposits
Leaks reported since the last round Any not yet traced to a cause on the roof

Mark every finding on the plan by its column line. A stain at D-7 inside and an open curb flashing near D-7 on top are one problem, not two.

A warehouse roof’s year, and a winter of leaks

ExampleOne roof, 19 person-hours, three drips

A made-up distribution warehouse: one single-ply roof of 120,000 square feet (about 11,000 m²), 12 drains, 2 overflow scuppers, 6 rooftop units and one hatch. Kevin Brooks and Tyler Jensen do the rounds. Every number is invented to show the arithmetic.

Visit People Hours Person-hours
Spring inspection, April 2 3 6
Fall inspection, October 2 3 6
Drains after the leaves fall 2 1 2
After a June windstorm 2 1.5 3
Escorting the roofer, 2 visits 1 2 2
Total 19

The drips. That winter, three are reported: in December on racking near column D-7, in January on the floor by the same rack row, and in February after a thaw, one bay over at D-8. Each is mopped up and written down with its column line, so the spring inspection starts at D-7.

The cause. It finds the base flashing on the uphill side of rooftop unit 4’s curb pulled away for about 10 inches: water ran along the deck under the membrane and came through at the low points. The installer repairs it under the warranty.

Without the log, it would have been three mop-ups and a fourth leak in March.

After a storm: wind, hail and heavy snow

Wait until the roof is safe to walk, and start inside, where the ceiling shows what the roof let through.

  • Wind. Edge metal and coping lifted, membrane loose at corners, ballast moved, units shifted on their curbs.
  • Hail. Dents in metal panels, caps and unit fins; bruises or cracks in the membrane, which a roofer should confirm.

Heavy snow

FEMA’s snow load safety flyer lists warning signs of an overstressed roof, among them sagging ceiling tiles, sprinkler heads dropping below the ceiling, popping or creaking noises, sagging metal decking, doors and windows that no longer open or close, cracks in walls, severe leaks, and water collecting where it does not drain on a low-slope roof.

If any appear, FEMA says to evacuate promptly and have the local building authority or a qualified design professional inspect the structure. It calls snow removal dangerous and only for qualified people; OSHA’s rooftop snow removal guide covers the hazards to workers.

Who fixes what

Your crew clears debris, strainers, drains and gutters; repairs to a roof under warranty go to the roofer who installed it. A roof near the end of its life belongs on the capital list with a date and a price, not on a pile of patch work orders; deferred maintenance covers deciding what can wait.

Who fixes what on a commercial roofInspections, warranty repairs, temporary patches, leaks at a unit's curb, and snow.
Work Who
Debris, strainers, drains and gutters Your crew
Spring, fall and storm inspections Your crew, or a roofer for a roof you cannot judge
Repairs to a roof under warranty The roofer who installed it, as NRCA advises, to avoid conflicts with the warranty
A temporary patch while it still rains Your crew, if the warranty allows; tell the roofer that day
A leak at a unit’s curb The roofer for the flashing, the HVAC contractor for the unit
Snow removal Qualified people only, as FEMA says

Before you start

Two people
Two people from the maintenance crew, trained for the fall hazards on that roof: one inspects, one watches the edge. Repairs to the membrane, seams and flashing go to a roofer.
Spring, fall and storms
The National Roofing Contractors Association (NRCA) recommends maintenance inspections at least twice a year, preferably in spring and fall, and after severe weather such as a hailstorm, tornado or hurricane, with what you find written down, photographed and filed. Under trees, look at the drains monthly through the fall (common practice).
A dry, calm day
Go up in daylight on a dry, calm day: a wet membrane is slippery and hides open seams. Take a roof plan with the column grid, and photograph from the same spots each time.

When a check fails

An active leak comes first: protect what is under it, call the roofer the same day, and mark the spot on the roof and on the ceiling. Anything else (an open seam, a split pipe boot, a drain that holds water) becomes a work order with a photo and a due date.

This roof inspection checklist is a starting point to adapt with your roof maker’s care guide and warranty, not a substitute for training, a roofer or the rule.

Fall protection: what OSHA requires

In OSHA’s general industry rules, a low-slope roof has a slope of 4 in 12 or less (29 CFR 1910.21), and work on one falls under 1910.28(b)(13), by distance from the edge. Less than 6 feet (about 1.8 m) from the edge, that means a guardrail, safety net, travel restraint or personal fall arrest system.

The fall protection rules in fullEach distance from the edge, warning lines, skylights, training, pitched roofs, and the rules in Canada.
  • Less than 6 feet (about 1.8 m): a guardrail, safety net, travel restraint or personal fall arrest system.
  • 6 feet to less than 15 feet (4.6 m): the same, but a designated area may be used for work that is both infrequent and temporary.
  • 15 feet or more: one of those systems or a designated area, or none for work that is both infrequent and temporary; in every case the employer must implement and enforce a work rule that nobody goes within 15 feet of the edge without fall protection.

A designated area is marked by a warning line, which 1910.29(d) sets at 34 to 39 inches (86 to 99 cm) high and at least 6 feet from the edge for temporary and infrequent work, 15 feet for other work.

Skylights count as holes: 1910.28(b)(3) requires protection from falling through any hole 4 feet (1.2 m) or more above a lower level, and 1910.29(e) requires a cover to hold twice the load that may be put on it and be secured in place. Anyone who uses personal fall protection must first be trained by a qualified person (1910.30(a)).

1910.28(a)(2)(ii) leaves out inspecting conditions before work starts or after it ends, except where fall protection meeting 1910.29 is installed and available; whether your rounds fit that is for your safety lead to decide from the rule’s text.

Pitched roofs. Smaller buildings often have a pitched roof of shingles or metal. Steeper than 4 in 12, it is not low-slope, and 1910.28(b)(1) requires protection on any walking-working surface with an unprotected side or edge 4 feet (1.2 m) or more above a lower level.

Common practice is to look from the ground with binoculars and from a ladder at the eave, and leave walking it to a roofer. Look for missing or curled shingles, granules in the gutters, lifted flashing and a sagging ridge. The apartment maintenance checklist puts this look on its spring and fall rounds.

This is a summary, for information: read the rule that applies to you. A reroof or other construction work falls under OSHA’s construction rules, 29 CFR part 1926. In Canada, each province sets its own fall protection rules. The fixed ladder and the hatch have their own checks in the ladder inspection checklist.

Roof inspections in Maintensor: one location per roof section

Make the roof a location under its building, and each section of a large roof a location under that; rooftop units are assets there. There is no library of ready-made checklists, so build this one once as a procedure.

  • The steps. A Heading step for each area, an Inspection check (Pass, Flag or Fail) for each line, and a Photo step per roof section.
  • The repeats. Attach it to a work order on the roof that repeats monthly, every 6 months, on a date (April, then October); the next one is created when the current one is completed. Repeats run by the calendar only, so the after-storm visit is a work order you create by hand, with a shorter copy of the procedure.
  • A failed check. The inspector adds a note and a photo before moving on and can create a follow-up work order for the roofer; attach the roofer’s report to it as a PDF.
The locations list: the plant at the top, three areas under it, and under Building services a boiler room, a lab and two roof wings with their asset and open work counts.
Locations nested under a plant: under Building services, a boiler room, a lab and two roof wings, each with its asset and open work counts.

People under the roof can report a drip as requesters, free on every plan. A request takes no photo, so ask them to write the column line under Any detail, and give the leak’s work order the roof section as its location: the list filtered by that location then shows every leak and repair it has had.

Only Admins and Full users answer checklists, so the inspectors need user seats; the roofer does not. The building’s other rounds are in the facility maintenance checklist, and how they fit together is on the facility maintenance software page.

Questions

What people also ask.

More in the checklists, or see the whole product on the features page.

What is an infrared roof moisture survey, and when is one worth it?

It finds wet insulation under a membrane that looks fine from above. A trained roofer or roof consultant scans the roof with a thermal camera on an evening after a sunny day, as wet areas cool more slowly, and checks suspect spots with core samples; ASTM C1153 describes the practice. It is worth it before you choose between repairing and replacing a roof, and after a leak that keeps coming back.

How do I stop contractors from damaging the roof?

Keep the hatch locked and the key with maintenance, so nobody goes up without you knowing. Ask every contractor which area they will work in, and walk it with them when they finish: dropped screws, cut-offs and a dragged toolbox are how a new puncture starts. Ask for walkway pads to any equipment that is serviced often, and photograph the area before and after.

Can I print this roof inspection checklist?

Yes. The form at the top of the page is a PDF to print or a Word file to change, with every area's checks on it. Take it up with a roof plan marked with the column lines, and write each finding next to its grid position, so it can be matched with a stain on the ceiling below.

Run one building through it.

Start the trial, add one building with its floors, rooftop units and boiler, and invite the people who report problems as requesters, free on every plan.

30-day free trial. No credit card.