Key points
- In apartments the two biggest jobs are tenant requests and unit turnovers, and both run on a clock.
- Sort each request into a tier as it arrives: emergency, urgent, routine or scheduled.
- Entering an occupied unit takes written notice; California and Ontario both look for 24 hours, except in emergencies.
- A turnover runs to a sequence, with vendors booked before move-out, because every empty day is lost rent.
- Split the budget in two: operating costs every year, and capital items such as roofs and boilers.
What property maintenance covers
On a rental property, maintenance has six jobs. In apartments, tenant requests and unit turnovers are the biggest, and both run on a clock: the lease and local law for one, lost rent for the other.
- Tenant requests. Problems reported from inside someone’s home or shop.
- Unit turnovers. Getting a vacant unit ready for the next resident, often called a make ready.
- Shared systems. Boilers, roofs, hallway lighting, laundry rooms, elevators, fire protection and parking.
- Vendors. Commonly the elevator, fire protection tests, pest control, landscaping and snow, and the big turnover work.
- Budget. Repairs and big replacements.
- Records. What was reported, what was done, and the tests that a lender, an insurer, a city inspector or a housing agency may ask to see.
In a small commercial building the lease decides how much of this is yours.
Types of property maintenance
Five kinds of work come up on a rental property:
- Preventive: the boiler’s start-up before the heating season.
- Corrective: a dripping faucet a tenant reported.
- Routine: hallway bulbs, the lawn.
- Emergency: water coming through a ceiling.
- Seasonal: hose bibs drained before the first frost.
The types of maintenance guide defines the general terms, and the emergency maintenance guide covers the first hour.
Property maintenance vs facility maintenance
The trade work is the same. Who it is for, where it happens, the rules on top and how cost is counted differ:
| Facility maintenance | Property maintenance | |
|---|---|---|
| Who the work is for | The organization that occupies the building | An owner, and the tenants who pay rent |
| Where much of it happens | Mechanical rooms, roofs, shared spaces | Inside people’s homes, after notice |
| Rules on top of fire and building codes | Workplace safety | Landlord and tenant law: repairs, heat, entry, deposits |
| How cost is counted | Per square foot | Per unit, and days a unit sits empty |
The facility maintenance guide covers the building systems side in depth.
Tenant requests and response times
Sort every request into a tier as it arrives, and tell the tenant which tier it is in and what happens next.
| Tier | Examples | Common target |
|---|---|---|
| Emergency | No heat in freezing weather, water coming through a ceiling, sewage backing up, no water, a door that will not lock, a smoke alarm missing or sounding without cause | Someone on the way within hours, day or night |
| Urgent | No hot water, refrigerator not cooling, the only toilet not working, no cooling in a heat wave | Same or next day |
| Routine | Dripping faucet, slow drain, a burner out, a sticking closet door | Within a few working days |
| Scheduled | Worn carpet, scuffed paint, a fixture the tenant would like changed | At an agreed date, or at the next turnover |
A gas smell is not a maintenance request
The tenant leaves and calls the gas utility or 911 first, and you follow.
These targets are common practice, and some are law where you are. Your leases may also promise response times; hold yourself to them. Each month, track the time from request to first answer and from request to done.
Where a target is law: heat in New York City
New York City requires heat from October 1 to May 31: at least 68°F (20°C) in the daytime when it is below 55°F (13°C) outside, and 62°F (17°C) at night. Hot water must be at 120°F (49°C) all year.
The process side (one way in, a queue someone reads every day, an answer back on every request) is in the maintenance request process guide.

Notice before entering a unit
Entering an occupied unit usually takes written notice, and the rules depend on where the property is. Two examples:
Both make exceptions for emergencies and for a tenant who agrees at the time (in Ontario, section 26).
Unit turnovers
A turnover starts the day the resident hands back the keys and ends when the next one could move in. Every day in between is rent the owner does not get back, so the work runs to a sequence, with vendors booked before move-out:
- Pre-move-out walk. Where the lease and the law allow one, walk the unit early to order parts and book vendors.
- Move-out inspection. Take photos of every room, for the deposit and for the scope of work.
- Trash-out and repairs. Plumbing, electrical, doors, appliances, drywall.
- Paint, then flooring, then cleaning. In that order, so nothing is done twice.
- Safety and locks. Test every smoke and carbon monoxide alarm; rekey or change the locks.
- Final walk. By someone other than the person who did the work.
Where turnover steps are law
- Texas sets a 7-day deadline to rekey after each turnover and requires a smoke alarm test when each tenancy starts (Property Code sections 92.156 and 92.258).
- Ontario’s Fire Code asks for smoke and carbon monoxide alarm tests after every change of tenancy.
- Housing built before 1978: EPA’s lead renovation rule covers paint work by in-house staff as well as contractors.
The make ready checklist sets out these rules with the room-by-room checks and a day-by-day sequence.
Property maintenance checklist: shared systems and how often
Shared systems run on a routine, from monthly walks to yearly service, because the owner pays when they are ignored: a roof that leaks into three top-floor units, a boiler that quits in January.
| System | What to do | How often |
|---|---|---|
| Heating plant and water heaters | Start-up service before the heating season; leaks, relief valves, flues | Yearly, with a monthly look in season |
| Roof, gutters and drains | Inspect, clear drains, photograph problems | Spring and fall, and after severe weather, as the roofing contractors’ association recommends |
| In-unit heating and cooling | Change filters, clear condensate drains | Quarterly or at the maker’s interval, and at every turnover |
| Smoke and CO alarms | Test each one; replace alarms at the end of their life | Yearly and at every turnover where a rule asks; the U.S. Fire Administration advises replacing smoke alarms every 10 years |
| Common areas | Hallway and stair lights, exit signs, emergency lights, extinguishers, laundry dryer exhaust | Monthly |
| Fire alarm, sprinklers, elevators | Contractor inspections and tests | As your fire code and elevator authority require |
| Parking lot and grounds | Pavement, lighting, drainage, snow | Monthly, with seasonal work in the parking lot maintenance checklist |
If the property takes HUD assistance, HUD’s NSPIRE standards list what its inspectors check in units and common areas, from smoke and carbon monoxide alarms to dryer exhaust vents. The apartment maintenance checklist turns that routine into checks by interval.
Managing vendors
Keep one record per vendor: what they cover, their after-hours number, their license and insurance, and the response time in the contract.
Give every vendor visit a work order, the same as your crew’s work, and attach their report to it. A visit with no work order is not in the building’s history, and nobody can answer “when was this last done?”
Splitting the budget: operating and capital
Split the maintenance budget in two:
For the capital side, list each big item with its age, the years of life you expect from it and a replacement price from a contractor’s quote. Divide the price by the years left to get what to set aside each year: a roof quoted at $240,000 (a made-up figure) with 8 years left needs $30,000 a year. A boiler whose repair jobs keep coming back is telling you its replacement date.
Property maintenance example: a 120-unit property’s year in hours
A made-up property: 120 apartments in three buildings, built in 1985 (after 1978, so the lead rule above does not apply). Linda Foster, the property manager, runs a two-person crew, Matt Greene and Tony Russo. Every number is invented to show the arithmetic.
ExampleWhere the crew's hours go
- Requests. Three a year per unit, 360 in all, averaging 1.25 hours each: 450 hours.
- Turnovers. 40% of units turn over in the year, 48 move-outs. Each takes the crew about 16 hours, with painting and carpet cleaning by vendors: 768 hours. Twenty of the 48 fall in June, July and August.
- Planned work. Nine routines, from in-unit filter changes (120 hours) to contractor visits (30): 348 hours.
That is 1,566 hours. Two people on site about 1,800 hours a year each have 3,600, so this work takes about 44% of the crew’s year. Grounds, snow, parts runs and on-call nights take most of the rest.
The planned work, routine by routineNine routines and their hours: 348 a year
| Routine | How many | Times a year | Hours each | Hours a year |
|---|---|---|---|---|
| In-unit filter change | 120 units | 4 | 0.25 | 120 |
| Smoke and CO alarm test | 120 units | 1 | 0.25 | 30 |
| Boiler room check | 3 | 12 | 1 | 36 |
| Common-area walk | 3 buildings | 12 | 1.5 | 54 |
| Roof, gutters and drains | 3 roofs | 2 | 3 | 18 |
| Parking lot and grounds | 1 lot | 12 | 1 | 12 |
| Laundry dryer exhaust cleaning | 3 rooms | 1 | 4 | 12 |
| Heating start-up and freeze prep | 3 buildings | 2 | 6 | 36 |
| Contractor visits: let in, escort, read the report | 15 visits | 1 | 2 | 30 |
| Total | 348 |
The year is not even. In July, 7 turnovers take 112 hours, cooling calls climb, and the planned routine still needs its 29 hours a month. So book the summer painters and carpet cleaners in the spring, and put the yearly alarm tests and dryer exhaust cleaning in January and February.
Turn time is where the money is. With rents of $1,500 a month in this example, an empty unit costs about $50 a day, so cutting each turnover from 10 days to 6 keeps the owner $9,600 a year (4 × 48 turnovers × $50). That is why days-to-turn belongs on the monthly report next to request response times.
Records to keep
Keep these by unit and by building: every request, with its dates and what was done; move-in and move-out inspections, with photos; alarm tests and rekeys; contractor reports; and lead-safe work records, for buildings older than 1978.
A shared spreadsheet can hold this for a few dozen units while one person keeps it current. Past that, the history ends up on the technician’s phone. What a CMMS is explains what moves into maintenance software.
How Maintensor handles a rental property
In Maintensor, each building is a location and each unit can be a location inside it, with its open work and history. Tenants report problems as requesters:
- Free on every plan. You invite each one by email, and they sign in with a code. They press Report a problem and follow it on My requests.
- On Pro and Max, a QR label posted in a unit opens Report a problem with that unit filled in, for a tenant who has signed in, and tenants are emailed when their request is approved, declined or done.
- Who decides. Only an admin approves or declines requests; technicians with Full user seats see the work orders, not the request queue.
A turnover is a work order on the unit with your make ready procedure attached as its checklist. Routines on shared systems are work orders that repeat. See how this looks for a building on the facility maintenance software page.
What it does not do
- There is no public form and no photo on a request.
- There are no work order templates and no way to copy a work order, so each turnover is a new work order; the procedure carries the steps.
- Maintensor is for the maintenance side of the property: it has no leases, rent, tenant screening or owner statements.