Make ready checklist for apartment turnovers

A make ready checklist is the list a maintenance technician works through to get a vacant apartment ready for the next resident: every room, appliance, fixture, alarm and lock checked and fixed, then a final walk by someone else.

Free, no sign-up. Print it, or type into the Word file.

By MaintensorUpdated

Page 1 of the blank make ready checklist for apartment turnovers: the building, unit and visit, then the checks of the entry and living areas, the kitchen and appliances, and the bathrooms, each with a box for OK and Fail and a line for a note.
Page 1 of 3

The checks, room by room

One sheet per vacant unit. The technician works through the rooms and fixes what fails, and someone else does the final walk at the end. Add your appliance makers’ instructions, your property’s finish standard (paint colors, flooring, fixtures) and your local rules.

Entry and living areas7 checks

  • Entry door opens, closes and latches; weatherstrip and threshold intact
  • Deadbolt and knob lock from both sides; door viewer clear
  • Walls and ceilings
  • Floors
  • Lights, switches and outlets; cover plates on
  • Closet doors and shelves
  • Blinds

Kitchen and appliances9 checks

  • Refrigerator on an appliance thermometer after a few hours closed
  • Range: each burner, oven bake and broil; knobs present
  • Range anti-tip bracket
  • Dishwasher: run a short cycle
  • Sink, faucet and disposal; look under the sink
  • Range hood fan and light
  • Cabinets and drawers
  • Countertop, backsplash and sink caulk
  • GFCI outlets near the sink: press Test, then Reset

Bathrooms8 checks

  • Toilet: flush three times, check the base and tank
  • Sink, tub and shower: flow, drains, hot water
  • Hot water temperature at the tap, on a thermometer
  • Caulk and grout around the tub or shower
  • Exhaust fan (hold a tissue to the grille)
  • GFCI outlet
  • Mirror, cabinet, towel bars, grab bars where fitted
  • Floor around the toilet and tub

Bedrooms and closets4 checks

  • Door closes and latches; privacy lock if fitted
  • Windows open, stay open and lock; screens intact
  • A bedroom window that serves as the emergency way out
  • Outlets, lights and closet

Heating, cooling and water heater6 checks

  • Heat: run it until every room warms
  • Cooling: supply air clearly cooler than the room
  • Filter replaced, with the date written on the frame
  • Condensate drain and pan
  • Thermostat responds; batteries new
  • Water heater in the unit: fittings, relief valve discharge pipe, the space around it

Smoke and carbon monoxide alarms3 checks

  • Each smoke alarm: press the test button; read the date of manufacture on the back
  • Each carbon monoxide alarm, in units with fuel-burning appliances or an attached garage
  • Test written down: date, unit, alarm, who tested

Windows, doors and locks4 checks

  • Every window: lock, balance, screen, glass
  • Patio or balcony door: slides, locks, security bar
  • Balcony railing
  • Exterior door locks rekeyed or cylinders changed; new keys and mailbox key logged

Final walk6 checks

  • Every line above passed, or has an open work order with a date
  • Clean throughout, including inside appliances, cabinets, light fixtures and window tracks
  • Photos of every room for the move-in record
  • Utilities on, thermostat set, hot water at the taps
  • Keys, fobs and remotes counted
  • Signed off by someone who did not do the work
What counts as a fail, check by checkThe full tables, room by room.

A check fails when the item does not work, is damaged beyond normal wear, or is unsafe.

Entry and living areas

Check Fail if
Entry door opens, closes and latches; weatherstrip and threshold intact Drags, will not latch, or daylight shows around it
Deadbolt and knob lock from both sides; door viewer clear Bolt does not throw fully, lock loose, viewer missing
Walls and ceilings Holes, nail pops, or a stain that may be a leak (find the source before painting over it)
Floors Tears, burns, lifted seams, soft spots underfoot
Lights, switches and outlets; cover plates on Dead outlet, cracked or missing plate, flickering fixture
Closet doors and shelves Door off its track, rod or shelf pulling out
Blinds Broken slats, or a loose cord loop within a child’s reach

Kitchen and appliances

Check Fail if
Refrigerator on an appliance thermometer after a few hours closed Above 40°F (4°C) in the fridge or above 0°F (-18°C) in the freezer, the figures the FDA gives; torn door gasket
Range: each burner, oven bake and broil; knobs present A burner will not light or heat; any gas smell (shut it off, call the gas utility)
Range anti-tip bracket Missing, or the range leg not seated in it. The CPSC says the bracket can save a child from serious injury or death when a range tips
Dishwasher: run a short cycle Leaks, does not drain or does not heat
Sink, faucet and disposal; look under the sink Drip at the trap or supplies, disposal jams or hums
Range hood fan and light Fan dead, filter caked with grease
Cabinets and drawers Water damage under the sink, broken hinge, drawer off its slides
Countertop, backsplash and sink caulk Burns, chips, open seams, missing caulk
GFCI outlets near the sink: press Test, then Reset Power does not cut, or will not reset

Bathrooms

Check Fail if
Toilet: flush three times, check the base and tank Runs on, rocks, leaks at the base or the supply
Sink, tub and shower: flow, drains, hot water Slow drain, drip, hot water slow to arrive
Hot water temperature at the tap, on a thermometer Above 120°F (49°C) from the unit’s own water heater, the setting the CPSC recommends; on a central plant, above its mixing valve setting
Caulk and grout around the tub or shower Gaps, mold that will not clean off, soft wall behind the tile
Exhaust fan (hold a tissue to the grille) Dead, or does not draw
GFCI outlet As in the kitchen
Mirror, cabinet, towel bars, grab bars where fitted Loose, cracked or rusted
Floor around the toilet and tub Soft spots, stains, lifted vinyl

Bedrooms and closets

Check Fail if
Door closes and latches; privacy lock if fitted Will not latch, lock jammed
Windows open, stay open and lock; screens intact Painted shut, broken balance, torn screen
A bedroom window that serves as the emergency way out Blocked by fixed bars, a window air conditioner or furniture
Outlets, lights and closet As in the living areas

Heating, cooling and water heater

Check Fail if
Heat: run it until every room warms A cold room; a burning smell that lasts; any doubt about a fuel-burning unit’s venting (call a licensed technician)
Cooling: supply air clearly cooler than the room Warm air, ice on the lines, a noisy fan
Filter replaced, with the date written on the frame Old filter still in, or no date on the new one
Condensate drain and pan Water standing in the pan, line clogged
Thermostat responds; batteries new No response
Water heater in the unit: fittings, relief valve discharge pipe, the space around it Rust or a drip at fittings, water in the pan, storage against it

The HVAC maintenance checklist covers the full service on the building’s shared equipment.

Smoke and carbon monoxide alarms

Check Fail if
Each smoke alarm: press the test button; read the date of manufacture on the back No sound, missing where one was, or over 10 years old
Each carbon monoxide alarm, in units with fuel-burning appliances or an attached garage No sound, or past the end-of-life date on its label
Test written down: date, unit, alarm, who tested Not recorded

Windows, doors and locks

Check Fail if
Every window: lock, balance, screen, glass Cracked glass, missing lock (a fogged double pane is cosmetic: note it)
Patio or balcony door: slides, locks, security bar Will not lock
Balcony railing Loose post or rail, gaps wider than your building code allows
Exterior door locks rekeyed or cylinders changed; new keys and mailbox key logged An old key still works

Final walk

Check Fail if
Every line above passed, or has an open work order with a date Any open safety item
Clean throughout, including inside appliances, cabinets, light fixtures and window tracks Dust, grease, debris
Photos of every room for the move-in record Missing
Utilities on, thermostat set, hot water at the taps Anything off
Keys, fobs and remotes counted Count short
Signed off by someone who did not do the work Signed by the technician

A typical turn, day by day

The order matters more than the day count: repairs before paint, paint before floors, floors before cleaning, so nothing is done twice.

ExampleA standard make ready over 3 to 5 days

Day Work Who
Before move-out Pre-move-out walk; order parts; book painter, carpet cleaner and cleaners Supervisor
Day 0, keys back Move-out inspection with photos of every room; scope list written; utilities on Supervisor or manager
Day 1 Trash-out; repairs to plumbing, electrical, doors, drywall and appliances; HVAC filter Technician
Day 2 Paint: touch-up or full Technician or painter
Day 3 Flooring: carpet cleaned or replaced, hard floors repaired Vendor
Day 4 Cleaning; alarms tested; locks rekeyed Cleaners and technician
Day 5 Final walk against this list; open items closed; unit marked ready Someone other than the technician

A light turn folds days 2 and 3 into one. A heavy one, with new flooring or cabinets, runs longer.

Before you start

Two people
The technician works through the rooms. A second person, the supervisor or the property manager, does the final walk: when the person who did the work also signs it off, the walk tends to find nothing, the same way pencil whipping empties an inspection of meaning.
When
Once per vacancy, starting the day the keys come back. A walk before move-out, where your lease and local law allow one, lets you order parts and book vendors early.
Paint before 1978
In housing built before 1978, patching and sanding during a make ready can fall under EPA’s lead paint rule, so know your building’s age before the scraper comes out.

When a check fails

Fix it before the next step in the sequence, or write a work order for anything that needs a part or a vendor. A safety fail (an alarm, a GFCI outlet, a gas appliance, the range’s anti-tip bracket, a lock) keeps the unit off the market until it is fixed.

Gas, electrical panel and refrigerant work goes to a licensed technician.

What the rules say about alarms, locks and lead paint

In some places, testing the alarms and rekeying the locks at every turnover is the law. In housing built before 1978, EPA’s lead paint rule sets how much paint a make ready may disturb without a certified firm.

What the rules sayAlarm tests in Texas, Ontario and HUD housing, rekeying in Texas, and EPA's lead rule.
  • Smoke alarms in Texas. Texas Property Code section 92.258 requires the landlord to test the smoke alarm at the beginning of each tenant’s possession.
  • Ontario. Ontario’s Fire Code has landlords test smoke and carbon monoxide alarms every year and after every change of tenancy, and keep a written record.
  • Replacing alarms. The U.S. Fire Administration advises replacing smoke alarms every 10 years.
  • HUD housing. HUD-assisted properties are inspected against the smoke and carbon monoxide alarm standards in HUD’s NSPIRE standards.
  • Everywhere else. Other states, provinces and cities have their own rules on where alarms go and who tests them; check yours, and test each alarm the way its maker’s instructions say.
  • Rekeying in Texas. Texas Property Code section 92.156 requires a security device operated by a key, card or combination to be rekeyed within 7 days after each tenant turnover. Rekeying at every turn is good practice everywhere.
  • Lead paint. In housing built before 1978, EPA’s lead renovation, repair and painting rule applies to work that disturbs more than 6 square feet of paint in a room (20 square feet outside), and to any window replacement: those are the limits of “minor repair and maintenance” in 40 CFR 745.83.
  • Who may do that work. It needs an EPA or state certified firm and certified renovators using lead-safe practices, and EPA says the rule covers in-house maintenance staff as well as outside contractors.

This is information, not legal advice; your state may run its own lead program.

Turnovers in Maintensor: one procedure, a new work order each time

Maintensor has no ready-made checklists, so build this one once as a procedure: a Heading step for each room, then an Inspection check (Pass, Flag or Fail) for each line. Make each apartment a location inside its building, and for each turnover create a work order on the unit with the procedure attached.

  • Readings. Add a Number step for the refrigerator temperature, with the limit in the step’s name (“Fridge °F, pass at 40 or below”), since a Number step has no units or limits of its own.
  • The final walk. A Photo step per room for the move-in record, and a Signature step. It keeps the drawn signature and the time but not who drew it, so put a Text step for the walker’s name beside it.
  • A Fail. The technician adds a note and a photo before moving on and is offered a follow-up work order, for the carpet vendor or a part on order. Required steps left open are listed at sign-off and written to the work order’s history.
Five steps in the procedure builder, each with its type and a Required box: a checkbox, a number, an inspection check, a text answer and another number.
Building the procedure: each step has a type and a Required box, here a checkbox, a number, an inspection check, a text answer and another number.

What it does not do: there are no work order templates and no way to copy a work order, so each turnover is a new work order, but the procedure carries every step, and a change to the list is published once as a new version.

Only Admins and Full users answer checklists, so the technician and the walker each need a user seat; a vendor’s painter does not.

The yearly alarm test in occupied units is a separate work order that repeats each year; the apartment maintenance checklist puts it with the building’s other rounds. The facility maintenance software page covers running a building; the property maintenance guide covers requests, vendors and a 120-unit worked example.

Questions

What people also ask.

More in the checklists, or see the whole product on the features page.

What does make ready mean in property management?

Make ready is the work that gets a vacant unit ready to rent again after a resident moves out: repairs, paint, flooring, cleaning, appliance and alarm checks, and new keys. It ends with a final walk that confirms the unit is rent ready, meaning a new resident could move in that day with no open items left.

How long should a make ready take?

A common target for a standard make ready, with repairs, paint touch-up and a clean, is 3 to 5 working days when vendors are booked before move-out. A full repaint, new flooring or cabinet work adds days. Measure it from the day the keys come back to the day the unit passes its final walk, because that is the time the owner collects no rent.

What is the difference between a make ready and a turnover?

A turnover is the whole change from one resident to the next: the notice, the move-out inspection, the deposit, the marketing and the move-in. The make ready is the maintenance part in the middle, the days when the unit is repaired, painted, cleaned and checked. In everyday use many teams say turn and make ready for the same thing.

Should smoke alarms be tested at every turnover?

Yes, and in some places it is the law. Texas requires landlords to test the smoke alarm at the start of each tenancy, and Ontario's Fire Code has landlords test smoke and carbon monoxide alarms after every change of tenancy. Where no rule asks, a turnover is still the one time the unit is empty and every alarm can be tested.

Run one building through it.

Start the trial, add one building with its floors, rooftop units and boiler, and invite the people who report problems as requesters, free on every plan.

30-day free trial. No credit card.