Hotel maintenance for a small engineering crew

Hotel maintenance is the work that keeps every guest room sellable and the building behind it running: a preventive rotation through the rooms, the plant in the back of house, and a quick answer when the front desk calls.

By MaintensorUpdated 10 min read

Key points

  • Every non-urgent request goes into one queue; an emergency still gets a phone or radio call first.
  • In the example, 120 rooms once a quarter comes to 2 rooms a weekday: about 90 minutes.
  • One PTAC maker's manual says to clean the air filters at least monthly, more often than a quarterly room visit.
  • Out of order takes a room out of the count that can be sold; out of service leaves it in.
  • In the example week, planned work takes 20.5 of the crew's 120 hours, and the calls about 65.

What hotel maintenance covers

A hotel’s maintenance work falls into three piles, and a small crew has to keep all three moving at once.

Guest rooms
Small things repeated room after room: a through-the-wall air conditioner (a PTAC, packaged terminal air conditioner), a shower valve, lamps, a lock, a smoke alarm. Each room needs a planned visit, and each room generates calls.
The plant behind the rooms
Boilers and water heaters, the pool and spa, the kitchen with its hood, coolers and ice machines, the laundry, elevators, the generator and the fire systems.
What guests and staff report
The front desk and housekeeping both expect an answer the same day.

What sets a hotel apart is that the customer sleeps in the building. Work goes around occupancy and quiet hours, and a room that cannot be sold tonight is revenue that never comes back.

One queue for front desk and housekeeping requests

Put every non-urgent request from the front desk and housekeeping into one queue, and send an answer back.

The requests queue of a hotel: a slow shower drain in Room 508, a leaking ice machine, a flickering lamp in Room 318 and a lukewarm hot tub.
A hotel's requests queue: four problems waiting for a decision, each with who reported it, where, and how long it has waited.

A logbook, sticky notes and a radio all fail the same way: nobody owns an entry, nothing gets closed, and three shifts report the same complaint.

  1. One way in, except emergencies. Every non-urgent problem goes into one queue. Water through a ceiling or a guest locked out still gets a phone call or a radio call first, then a written record. For a gas smell, get people clear and call 911 or the gas utility first, then call engineering.
  2. Each person reports under their own name, so the morning engineer can ask the night auditor what the noise sounded like.
  3. Every request says four things: the room number, what is wrong, since when, and whether a guest is in the room.
  4. Engineering reads the queue at the start of each shift and after lunch, at least.
  5. The answer goes back. The front desk needs to know the room is fixed before it can release it.
  6. Run the queue beside the logbook for two weeks, then retire the logbook. Copy anything still open into the queue first.

Setting up a maintenance request process covers the request policy in more detail.

Request priorities and rooms out of order

A useful priority scheme in a hotel is set by the guest, not by the equipment. This is a suggestion, not a standard: set your own times, post them at the front desk, and let engineering set the final priority.

What is reported Priority Aim
A gas smell Emergency: get people clear and call 911 or the gas utility first, then phone engineering Now
Water coming through a ceiling, no heat in winter or no hot water in an occupied room, a door that will not lock Emergency: phone first, write it up after Now
Occupied room: no cooling, toilet blocked, no power at the bed High While the guest is still in the room, or move the guest
Vacant room out of order High Back in service before tonight’s arrivals
Vacant room, minor fault (a lamp, a slow drip) Medium Before the room is next sold
Cosmetic (a scuff, a sticking drawer) Low The next room PM

Many property management systems have two flags:

Out of order
Takes the room out of the count of rooms that can be sold.
Out of service
Leaves the room in the count, while the front desk avoids it.

Agree with the front office manager who sets each flag, and who clears it. A room left out of order after the repair is a lost night all the same.

The guest-room PM rotation, worked out for 120 rooms

At 45 minutes a room, 120 rooms once a quarter comes to 2 rooms a weekday: about 90 minutes.

A room PM is a planned visit to one vacant room: the PTAC, the bathroom, the lock, the smoke alarm, the furniture, the windows. The hotel room inspection checklist has the items.

Example120 rooms, every room once a quarter

Take a made-up hotel with 120 rooms on four guest floors of 30, and a target of every room once a quarter. All figures are invented for the example.

Step Arithmetic Result
Weeks in a quarter 52 ÷ 4 13 weeks
One floor at a time 4 floors × 3 weeks 12 weeks, plus 1 week to catch up rooms that were occupied
Rooms a week 30 rooms ÷ 3 weeks 10 rooms
Rooms a day 10 rooms ÷ 5 weekdays 2 rooms
Minutes a room, timed on five rooms 45 minutes, door to door
Engineer time a week 10 × 45 minutes 7.5 hours

Two rooms a day fits before lunch, and it survives a busy day. A rotation that needs a full day a week is the first thing dropped when the calls pile up.

To keep the rotation running:

  • Book the rooms with the front desk, and confirm they are vacant, the day before.
  • Work one floor at a time, so the parts cart stays on one floor and a pattern (every tub on the 300 stack draining slowly) shows up together.
  • Keep a list of rooms skipped because a guest stayed, and do them in week 13.

PTAC units

The room PM visits each PTAC once a quarter, but the filters need more.

What one maker's manual says

Friedrich’s installation and operation manual for its SG series PTACs says to clean the air filters at least monthly, and to inspect the coils, base pan, wall sleeve and drain annually or semi-annually.

Intervals differ by maker, so check your own units’ manual.

ExampleA weekly filter route

In the example hotel, filters get their own weekly route: one floor each week, so every room’s filters are cleaned every four weeks. At about 5 minutes a room (made up), 30 rooms is 2.5 hours a week. Swap in a floor’s worth of clean filters and wash the dirty set in the shop, not in a guest bathroom. Skip the rooms that get their room PM that week.

Once a year, in the slow season, pull each chassis for the coil, base pan and sleeve cleaning the manual calls for. Keep at least one spare chassis on the shelf: swapping a failed unit takes far less time than repairing it in an occupied room.

Back of house: pool, kitchen, laundry and boiler room

The back of house is five areas, each with daily checks, longer intervals and rules of its own: the pool and spa, the kitchen, the laundry, the boiler room, and hot water in the rooms.

The five areas: checks, intervals and rulesPool and spa, kitchen, laundry, boiler room and hot water, with whose rules apply
Area Daily Longer intervals What sets the rules
Pool and spa Chemistry tested before opening and through the day; drain covers, gates, safety equipment Weekly alkalinity, monthly hardness and cyanuric acid, yearly drain cover inspection Your health department’s pool code, often based on CDC’s Model Aquatic Health Code. See the pool maintenance checklist
Kitchen Cooler and freezer temperatures, dish machine temperatures Hood filters, ice machine cleaning, hood system and suppression service The FDA Food Code as your state adopted it, and NFPA 96 for the hood. See commercial kitchen equipment maintenance
Laundry Lint screens and lint compartments, as the dryer manual directs Dryer belts, door seals, exhaust ducts The dryer and washer manuals
Boiler room A walk: pressures, temperatures, leaks, sounds Burner service, safety valve tests, the inspection certificate your jurisdiction requires Your state or provincial boiler rules. See the boiler maintenance checklist
Hot water in rooms Water temperature at the heater outlet Flushing taps and showers in rooms that sit empty Your water management program

Legionella: what CDC tells hotels

CDC’s guidance for hotel owners and managers says low occupancy cuts water flow, which can lower disinfectant levels and hot water temperatures. It also says water management programs are now an industry standard for most hotels in the United States.

If your hotel has a water management program, its flushing and temperature checks belong on the maintenance schedule like any other routine.

A worked weekly plan

A week of 120 engineer hours can hold 20.5 of planned work and about 65 of calls, with 34.5 left for the backlog. Take the made-up 120-room hotel, with a chief engineer, Frank Morris, and three engineers: Alex Turner and Brian Cho on days, Megan Doyle on evenings. Their 120 hours a week do not count Frank’s. First, the planned work:

The planned work, job by jobSeven kinds of work, 20.5 hours a week, and who does each
Work How often Hours a week
Pool test before opening, and readings through the day Daily 3.5
Boiler room walk Daily 2
Guest-room PM 10 rooms 7.5
PTAC filter route One floor 2.5
Kitchen: hood filters, ice machines, a cooler each month Weekly and monthly 2
Laundry: lint compartments, belts Weekly 1
Monthly rounds, one a week: extinguishers, emergency lights, generator run Monthly 2
Planned total 20.5

Alex does the pool test, the boiler walk, the PTAC filters and the monthly round. Brian does two room PMs each weekday. Megan does the kitchen and laundry jobs in the evening.

Then the calls. Say last month’s requests and repairs took about 65 hours a week:

120 hEngineer hours a week
20.5 hPlanned work
65 hRequests and repairs
34.5 hLeft for the backlog
120 − 20.5 − 65

The backlog is the recaulking, the corridor touch-up, the replacement of the worst lamps. If the calls take 90 hours next month, the planned work still fits, and the backlog waits.

The three engineers take requests as they come, High first, and whoever works the weekend does the pool test and boiler walk. Frank reads the queue three times a day and moves planned work when an emergency eats a morning. How to build a weekly maintenance schedule covers balancing a week against the hours people have.

Mistakes that cost rooms

  • A rotation sized to an ideal week. If 2 rooms a day does not survive a normal Tuesday, make it 1 room a day and a longer cycle, and say so.
  • Fixing a room and losing the finding. The third slow drain on the same stack is a drain line problem, not three hair traps. It only shows if each repair is written against its room.
  • No spare for the item that empties rooms: a PTAC chassis, a lock, a shower valve cartridge.

A hotel in Maintensor: rooms as locations, staff as requesters

In Maintensor, the hotel is a location with each floor under it and each room under its floor, so a work order can be for one room. The hospitality page shows the app with a demo hotel.

  • Who reports. Front desk and housekeeping staff are Requesters, free on every plan, each with their own sign-in.
  • The answer. An Admin approves a request into a work order or declines it with a reason.
  • Who reads the queue. Only Admins see it, and an Admin also has full access to users and settings, so choose deliberately who reads it on each shift. Keep the radio for whatever cannot wait.

A floor’s PTACs can be one asset with a unit for each room, and a unit can be marked Down with a reason while the rest stay Operational. The room inspection becomes a procedure on a work order that repeats every 3 months.

The Planner (Pro and Max) lays the week out by person against an 8 hour day. A room’s QR label (Pro and Max) opens Report a problem with the room filled in, for staff signed in as requesters. One repeating work order per room is 120 recurring work orders, and the Free plan holds 5: see pricing.

What it does not do

Maintensor does not connect to a property management system, so the out of order flag is still set there. There is no guest form, and a room’s QR label opens only for someone signed in, never for a guest. A request carries no photo, and nothing works offline.

Questions

What people also ask.

More in the blog, or see the whole product on the features page.

How often should hotel rooms get preventive maintenance?

Once a quarter is a common interval for a full guest-room PM, worked a few rooms a day as rooms come vacant. Some items need more than the room visit gives them: one PTAC maker's manual calls for cleaning the air filters at least monthly, so a quarterly room PM needs a monthly filter route beside it. Check the manual for your own units.

How long does a hotel room PM take?

It depends on the checklist, the age of the rooms and whether PTAC filters are washed in the room or swapped for a clean set. The worked example on this page assumes 45 minutes, a made-up figure. Time five rooms with your own checklist, door to door, and build the rotation on that number rather than on a guess.

What is the difference between out of order and out of service?

In many property management systems, an out of order room cannot be sold and leaves the count of available rooms, usually for a fault a guest cannot live with, such as no cooling or a leak. Out of service is for a minor fault: the room stays in the count, but the front desk avoids assigning it. The words and rules differ by system.

Should housekeeping report maintenance problems directly to engineering?

Yes. Housekeepers see every room every day, so they find most small faults first: dripping taps, dead lamps, loose towel bars, slow drains. Give them a way to report each one in a line, with the room number, and show them when it is fixed. Emergencies still go by phone or radio.

Do small hotels need maintenance software?

A 30-room motel with one maintenance person can run on a request book and a wall calendar, as long as every entry gets closed. Software starts to pay when requests arrive from several people and shifts, when rooms are missed in the rotation, or when nobody can say when a unit was last serviced.

Run one hotel's maintenance through it.