Commercial pool maintenance checklist

A commercial pool maintenance checklist covers the water, tested before opening and through the day, the safety items checked every morning (drain covers, gates, rescue equipment, lights), and the weekly, monthly and seasonal work behind them.

Free, no sign-up. Print it, or type into the Word file.

By MaintensorUpdated

Page 1 of the blank commercial pool maintenance checklist: the pool, the date and who checked, then the daily checks before opening and while open and the weekly checks, each with a box for OK and Fail and a line for a note.
Page 1 of 2

The checks, by visit

One sheet per pool and day: the daily checks before opening and while open, then the weekly and monthly work. A check that fails closes the pool or gets a work order the same day (below).

The numbers on this page come from CDC’s 2024 Model Aquatic Health Code (MAHC), the national model many health departments draw on. Your state or local pool code is the one that applies, and its numbers may differ.

Daily: before opening and while open11 checks

  • Free chlorine (or bromine), combined chlorine and pH before opening
  • Disinfectant and pH while open
  • Water temperature, heated pools
  • Water clarity
  • Drain, equalizer and suction outlet covers
  • Skimmers, weirs, inlets
  • Pump, filter, feeders, controller
  • Gates and enclosure
  • Rescue equipment
  • Emergency phone, first aid, signs
  • Deck, lights, chemical room

Weekly6 checks

  • Total alkalinity
  • Deep end sample
  • CYA, if stabilized chlorine is the main disinfectant
  • Salt, if a salt chlorinator is fitted
  • Brush and vacuum; clean the waterline tile
  • Filter

Monthly5 checks

  • Calcium hardness, CYA (if used), saturation index
  • GFCI devices at the pool
  • Test kit reagents and chemical log
  • Drain cover dates
  • Rescue equipment condition
What counts as a fail, check by checkThe full tables, what passes, and the MAHC section behind each interval.

Each check says what passes and what fails, and the last column says where the interval comes from.

Daily: before opening and while open

Check Pass Fail if Interval from
Free chlorine (or bromine), combined chlorine and pH before opening Within your code’s ranges Outside them: adjust and retest before opening MAHC 5.7.5.1
Disinfectant and pH while open Within range at each test Outside range: adjust, close if below minimum MAHC 5.7.5.2 (every 2 hours, manual feed), 5.7.5.3 (every 4 hours, controller)
Water temperature, heated pools Recorded with each chemistry test, within limit Above 104°F (40°C) MAHC 5.7.5.10
Water clarity Main drain or reference tile visible from the deck Bottom not visible: closed MAHC 5.7.6
Drain, equalizer and suction outlet covers In place, secure, unbroken Loose, cracked or missing: closed until replaced MAHC 5.7.1.5, 6.4.1.3.1
Skimmers, weirs, inlets Baskets clear, weirs in place, inlet covers on Weir missing, cover broken MAHC 6.4.1.3.1
Pump, filter, feeders, controller All running; filter pressure and flow recorded Not running: closed MAHC 6.4.1.3.1, 6.4.1.6
Gates and enclosure Gates self-close and latch; fence intact; no furniture to climb Gate propped or not latching MAHC 6.4.1.3.1
Rescue equipment Throwing device with rope and reaching pole with shepherd’s crook at the pool Missing or damaged MAHC 5.8.5.4 (unguarded pools over 2 feet deep)
Emergency phone, first aid, signs Phone works; kit stocked; signs posted and readable Phone dead, sign missing MAHC 5.8.5, 6.4.1.3.1
Deck, lights, chemical room Deck clear of glass and trip hazards; underwater lights intact; chemical room locked Glass, exposed wires, water in a light, unlocked chemical room MAHC 6.4.1.3.1

Weekly

Check Pass Fail if Interval from
Total alkalinity 60 to 180 ppm Outside: adjust MAHC 5.7.5.5
Deep end sample Included in one test this week Never sampled MAHC 5.7.4.3.3
CYA, if stabilized chlorine is the main disinfectant At or under 90 ppm Over: partial drain and refill MAHC 5.7.5.7.2
Salt, if a salt chlorinator is fitted In the maker’s range Outside it MAHC 5.7.5.11, or the maker
Brush and vacuum; clean the waterline tile No algae, film or scale Slime or algae on surfaces Common practice; the daily inspection in MAHC 6.4.1.3.1 also checks that slime and biofilm are gone
Filter Backwashed or cleaned at the pressure rise the maker gives Pressure past the maker’s limit The filter maker

Monthly

Check Pass Fail if Interval from
Calcium hardness, CYA (if used), saturation index In range Out of range MAHC 5.7.5.6 to 5.7.5.8
GFCI devices at the pool Trip on Test, restore on Reset Do not trip MAHC 6.4.1.3.2
Test kit reagents and chemical log Reagents in date; inventory log current Expired reagents MAHC 6.4.1.5
Drain cover dates Each cover inside the service life marked on it Past its date: plan replacement Common practice; CPSC recommends replacing expired covers
Rescue equipment condition Rope not frayed; pole and crook sound Frayed rope, cracked pole Common practice

Quarterly, twice a year and seasonal

Check When Interval from
Total dissolved solids Quarterly MAHC 5.7.5.9
Bonding conductors, where you can see them Every 6 months, and after any work near them MAHC 6.4.1.3.2
Drain covers and fasteners, by a qualified professional At least yearly CPSC recommendation
Secondary anti-entrapment system (safety vacuum release or pump shut-off) As its maker directs The maker
Heater, pump motor and seal, chemical controller probes As each maker directs The makers
Filter sand or cartridges replaced As the filter maker directs The maker
Outdoor pool opening and closing Each season: full daily list before reopening Your health department

Water chemistry targets

Values from the 2024 MAHC (5th edition). A spa here means a hot tub.

What Pool Spa MAHC section
Free chlorine, minimum, no cyanuric acid (CYA) 1.0 ppm 3.0 ppm 5.7.3.1.1.2
Free chlorine, minimum, with CYA 2.0 ppm CYA is phased out in spas 5.7.3.1.1.2, 5.7.3.1.3.1
Free chlorine, maximum Product label; above 10 ppm with swimmers closes Same 5.7.3.1.1.5, 6.6.3.1
Bromine, if used 3.0 to 8.0 ppm 4.0 to 8.0 ppm 5.7.3.1.2
pH 7.0 to 7.8; below 6.5 or above 8.0 closes Same 5.7.3.4.1, 6.6.3.1
Combined chlorine Act above 0.4 ppm Same 5.7.4.4.2
Total alkalinity 60 to 180 ppm Same 5.7.4.4.1
Calcium hardness 2,500 ppm maximum Same 5.7.4.4.3
CYA 90 ppm maximum; 300 ppm or more closes Phased out in spas 5.7.3.1.3.2, 5.7.3.1.3.3
Water temperature 104°F (40°C) maximum Same 5.7.4.7.2

For hot tubs, CDC’s Legionella control toolkit suggests control limits of 3 to 10 ppm free chlorine (or 4 to 8 ppm bromine) and pH 7.2 to 7.8, testing at least twice a day, and no CYA.

ExampleHow often to drain a hot tub

The toolkit’s water replacement interval is days = (spa gallons ÷ 3) ÷ average bathers a day. A made-up 600-gallon hot tub with 25 bathers a day works out to (600 ÷ 3) ÷ 25 = 8 days between drain, clean and refill.

Before you start

A certified operator
The person your health department accepts as the pool’s operator, often someone who holds a pool operator certificate, plus a trained backup for days off. Chemistry is not a job to hand to whoever is at the front desk.
How often
The water is tested before opening and through the day. The tables run daily, weekly, monthly, then quarterly and seasonal.
Your code's numbers
The MAHC is voluntary guidance that a state or county may adopt, change or ignore. Replace its numbers with your code’s, add your pump, filter, heater and controller makers’ tasks, and treat this list as a starting point, not as training.

When a check fails

The MAHC lists conditions that call for closing the pool at once (section 6.6.3), among them disinfectant below the minimum or above 10 ppm with swimmers present, pH below 6.5 or above 8.0, filtration or disinfection not running, a broken, loose or missing drain cover, a bottom you cannot see, and missing lifesaving equipment.

Close it, fix it, retest, and write down when it reopened. Every other failed check gets a work order the same day.

Records

The MAHC asks that operation, maintenance and management records be kept at least 3 years and shown to the health department on request (6.4.1.2.1). The daily record includes pH, disinfectant, combined chlorine, pump and filter pressures or flow, CYA if used, temperature, backwash times, and any equipment failure or calibration (6.4.1.6).

Many health departments supply their own log form: use it. A log is only worth what went into it, so read it: identical readings day after day are a sign of pencil whipping. For the equipment side, an equipment maintenance log keeps the pump, heater and filter history.

Drain covers and the VGB Act

The Virginia Graeme Baker Pool and Spa Safety Act applies to public pools and spas, and CPSC’s 2024 letter to pool operators spells out that this includes hotels, motels and apartment complexes. Every drain cover must meet the current federal standard, ANSI/APSP/ICC-16 2017, adopted at 16 CFR 1450.

What else the Act and CPSC askA second system for a single blockable drain, the cover's service life, and the yearly professional inspection.

A pool or spa with a single blockable main drain, or drains on the same plane less than 3 feet apart, also needs one of these: a safety vacuum release system, a suction-limiting vent system, a gravity drainage system with a collector tank, an automatic pump shut-off system, or a device that disables the drain.

Each cover is marked with a flow rating and a service life. CPSC’s Pool Safely FAQ recommends that operators inspect covers often and have them professionally inspected at least once a year, and its 2024 letter recommends replacing covers past the date on them. A cracked cover is a violation whatever its date.

Daily pool chemistry in Maintensor: readings and a signature

In Maintensor, the daily list becomes a procedure on a work order that repeats every day. The weekly and monthly tables become their own repeating work orders, weekly on a chosen day or monthly on a date.

  • Readings. Number steps for free chlorine, pH, combined chlorine, water temperature and filter pressure. A Number step has no units or limits, so put the unit and the range in the step’s name, and follow the readings with an Inspection check such as “Chemistry within the posted ranges”, which can be failed.
  • Checks and a signature. Inspection checks for the covers, gates and rescue equipment, and a Signature at the end. A Fail asks for a note and a photo and offers a follow-up work order.
Three answered steps of a checklist: a filter check passed, with the technician's note and a place to add a photo, a supply air temperature of 14 °C, and Yes chosen for a clear drain pan.
Three answered steps: a check passed with the technician's note, a temperature reading, and Yes for a clear drain pan.

Be clear about what it does not do. Readings stay on that day’s work order Checklist: there is no chart of chlorine across days, no export and no printed log, so keep the health department’s log sheet for the tests every 2 or 4 hours.

Only Full users and Admins answer checklists, so a backup operator at the front desk needs a Full user seat (pricing). The hospitality page describes a daily pool plant check for a hotel, and the hotel maintenance guide places the pool in the engineering week.

Questions

What people also ask.

More in the checklists, or see the whole product on the features page.

How often should a hotel pool's water be tested?

Under the 2024 Model Aquatic Health Code, disinfectant and pH are tested before the pool opens each day, then every 2 hours while it is open if disinfectant is fed by an erosion feeder or metering pump without an automated controller, or every 4 hours with one. Your health department's code may set a different schedule, and it is the one you follow.

What free chlorine level should a commercial pool have?

The 2024 Model Aquatic Health Code sets a minimum of 1.0 ppm free chlorine in a pool without cyanuric acid, 2.0 ppm with it, and 3.0 ppm in a spa. The maximum is the product label's, and above 10 ppm with swimmers present is a reason to close. pH is kept between 7.0 and 7.8. Local codes vary.

What does the Virginia Graeme Baker Act require of hotel pools?

Hotel pools and spas are public pools under the Act. Each drain must have an anti-entrapment cover that meets the current federal standard, ANSI/APSP/ICC-16, and a pool with a single blockable main drain, or drains less than 3 feet apart, needs a second system, such as a safety vacuum release system or an automatic pump shut-off.

How long should pool maintenance records be kept?

The Model Aquatic Health Code says at least 3 years, available to the health department on request. That covers the daily chemistry and pressure readings, equipment maintenance and failures, and incidents. Your state or local code may set a longer period or require its own log form.

Run one hotel's maintenance through it.

Start the trial, add the rooms, the pool plant and the kitchen, invite the front desk and housekeeping as requesters, free on every plan, and set each check to repeat.

30-day free trial. No credit card.