Bearing lubrication: how much grease and how often

Bearing lubrication with grease comes down to two numbers for each bearing: how much and how often. The bearing's size sets the amount; its speed, size, heat and dirt set the interval.

By MaintensorUpdated 9 min read

Key points

  • Grease to add from the side: 0.005 × outside diameter × width, in grams and millimeters.
  • Weigh the grease gun once, then write the strokes on the chart and at the fitting.
  • Every 15 °C above 70 °C halves the interval, and a vertical shaft halves it again.
  • Too much grease is as real a fault as too little: a bearing packed full runs hot.
  • A lubrication schedule rounds intervals down to calendar dates and groups the points into routes.

What goes wrong: too little, too much, or the wrong grease

A bearing can get too little grease, too much, or the wrong kind. Grease is oil held in a thickener. The oil bleeds out slowly to keep a film between the balls or rollers and the rings, and with time and heat the grease ages until it cannot. Relubrication puts fresh grease in before that happens.

Nearly two-thirds of motor failures

The DOE’s tip sheet on motor life says bearing failures account for nearly two-thirds of all motor failures. It lists what shortens bearing life: too much lubricant, the wrong interval, contaminated lubricant, the wrong lubricant, vibration, misaligned couplings and tight belts.

Too little grease is only one of the three. The other two:

Too much
The DOE’s pumping system sourcebook warns that overgreasing interferes with the ball or roller motion and can cause overheating (page 33). Timken says excessive relubrication can raise operating temperature through grease churning (page 11).
The wrong grease
The TECO-Westinghouse motor manual says not to mix different kinds of grease: thickeners of different types can destroy each other’s properties, and even greases with the same thickener can clash through their additives.

A bearing packed full runs hot; a bearing given the right amount warms up briefly and settles.

Greasing a bearing, step by step

  1. Check the grease against the lubrication chart. Same grease, every time. Tag each fitting and each gun with its grease, so a gun of the wrong one never reaches it.
  2. Wipe the fitting and the gun’s nozzle. The TECO manual says to clean the fitting thoroughly first, or dirt goes in with the grease.
  3. Open the drain, where the housing has one, so old grease has somewhere to go. SKF, a bearing maker, says a housing must have a way for used grease to be purged.
  4. Pump the counted strokes, slowly. The next section works out how many.
  5. Let it run. The TECO manual says to run the motor 10 to 30 minutes after greasing so excess grease vents out, then refit the drain plug. SKF notes that excess grease spreads or escapes during this running-in, and the temperature then drops. A bearing that stays hot after that gets a work order.

Running or stopped?

OSHA 1910.219(p)(7) says machinery shall be oiled when not in motion, wherever possible, and that the regular oilers wear tight-fitting clothing. The TECO manual advises regreasing a running motor so the grease spreads evenly, while staying clear of rotating parts.

Where a fitting is reached without going near a moving part, often by a fixed extension line outside the guard, greasing it running follows both. Where it is not, lock the machine out, grease it stopped, and run it after. The lockout/tagout procedure guide covers the steps.

How much grease: the replenishment formula

SKF’s page on grease quantities gives the amount to add at each relubrication, from the side of the bearing:

Gp = 0.005 × D × B

Gp
the grease to add, in grams
D
the bearing's outside diameter, in millimeters
B
the bearing's width, in millimeters

Through holes in the middle of the outer or inner ring, it is Gp = 0.002 × D × B. In inches and ounces the side rule is Gp = 0.114 × D × B, since one square inch is 645 square millimeters and one ounce is 28.35 grams.

Find the bearing number on the motor’s nameplate or in the machine’s manual, and its D and B in the bearing maker’s catalog.

ExampleA 6309 motor bearing, in strokes of the gun

A made-up motor’s drive-end bearing is a 6309: a deep groove ball bearing, 45 mm bore, 100 mm outside diameter and 25 mm wide.

  1. Gp = 0.005 × 100 × 25 = 12.5 grams, about 0.44 ounce.
  2. Grams mean nothing at the fitting, and every gun is different, so weigh yours. Pump 10 strokes onto a kitchen scale: say they weigh 14 grams, so one stroke is 1.4 grams.
  3. 12.5 ÷ 1.4 = 8.9, so 9 strokes. The smaller 6207 at the other end (72 mm by 17 mm) takes 0.005 × 72 × 17 = 6.1 grams, 4 strokes.

Write the strokes down

Write the strokes on the chart and on a tag at the fitting. “A few pumps” is how bearings get packed solid.

How often: the relubrication interval from speed and size

SKF’s page on grease life and relubrication estimates the interval from a diagram. It reads hours off one of three lines, for how heavily the bearing is loaded, against this speed figure:

n × dm × bf

n
the speed, in revolutions per minute
dm
the bearing's mean diameter, 0.5 × (d + D), where d is the bore
bf
a bearing factor: 1 for deep groove ball bearings, higher for most roller bearings

The diagram holds for a horizontal shaft, a rotating inner ring, clean conditions and 70 °C (160 °F). Then it adjusts:

Condition Adjustment
Every 15 °C (27 °F) above 70 °C Halve the interval
15 °C (27 °F) below 70 °C Double it, once only
Vertical shaft Halve it
Shielded bearing or good external seals Multiply by 0.8
Open bearing, moderate seals Halve it
Open bearing, poor seals Multiply by 0.3
Open bearing, very dirty place Grease continuously
High vibration Shorter, per the machine’s maker

SKF adds that intervals above 30,000 hours are not reliable, because most greases age out before then.

ExampleThe same motor, run around the clock

The made-up motor runs at 1,780 rpm, around the clock, horizontal, with its bearing at about 70 °C. Its drive end:

  1. dm = 0.5 × (45 + 100) = 72.5 mm.
  2. n × dm × bf = 1,780 × 72.5 × 1 = 129,050.
  3. On the diagram’s line for lightly loaded bearings (C/P of 15 or more), the interval is about 10,000 hours at 200,000 and longer as the figure falls. At 129,050 it reads about 15,000 hours.
  4. The motor’s end shields keep dirt out reasonably well, so multiply by 0.8: 12,000 hours.
  5. Around the clock is 168 hours a week. 12,000 ÷ 168 = 71 weeks, about 16 months.
  6. Round down to a date the crew will keep: once a year. If the motor’s lubrication plate says sooner, the plate wins.

C is the bearing’s load rating in the catalog, and P the load on it. A chart reading is a round number, not a precise one; if you do not know the load, the lines for heavier loads give shorter, safer intervals.

Now put the same bearing in a vertical pump motor in a dusty room, where some dirt gets past its seals, at 85 °C. Halve for heat, the vertical shaft and the dirt: 15,000 × 0.5 × 0.5 × 0.5 = 1,875 hours, or 11 weeks around the clock.

12,000 hHorizontal, clean, 70 °C
on the schedule: once a year
1,875 hVertical, dusty, 85 °C
on the schedule: every 8 weeks

Same bearing, same speed, about one sixth of the interval.

Slow and dirty bearings: when the environment sets the interval

At conveyor speeds the diagram gives very long intervals, and the grease is no longer the limit: dirt and water are. Timken’s mounted ball bearing catalog (table 7, page 12) sets relubrication of its greased mounted units by surroundings:

Where it runs Relubricate
Indoors Not required
Outdoors Two or three times a year
Severe outdoor exposure Once a month
High contamination or washdown Once a week

Timken counts normal service as clean and dry, between -30 and 180 °F (-34 and 82 °C), below a speed limit. The amount, for these units, is until the first grease shows at either seal lip.

SKF’s advice for very slow bearings that need protection from dirt and corrosion is to fill 70 to 100 percent of the housing. The conveyor belt maintenance checklist has the pulley bearings on its monthly list.

A lubrication schedule and chart for a small crew

The lubrication chart is the list of every grease point. A made-up plant’s first page:

The first page of the chartSix grease points: the bearing, the grease, the amount and how often
Point Bearing Grease Amount Every
Tower fan motor, drive end 6309 Plate grease 9 strokes 12 months
Tower fan motor, other end 6207 Plate grease 4 strokes 12 months
Vertical pump motor, drive end 6309 Plate grease 9 strokes 8 weeks
Washdown conveyor, take-up units Ball units Food grade Until it purges Weekly
Exhaust fan motor Sealed None None Never
Pump P-4 bearing frame Pump manual Pump manual Pump manual 3 months

The lubrication schedule turns the chart into routes. Group points by interval and by where they are, so one person walks one route: the weekly washdown route, the 8-week pump room route, the yearly motor route at the shutdown.

  • Round down. 71 weeks becomes a year; 11 weeks becomes 8. A route done a little early costs a few strokes of grease.
  • Calendar, from hours. Divide the interval in hours by the hours the machine runs in a week, once, and write the result on the chart. A time-based schedule is simpler to keep than counting run hours.
  • List what is never greased. Sealed bearings on the chart, marked none, stop the over-eager.
  • Write what you found. Grease that comes out dark, gritty or watery, a bearing that runs hot or growls: that is a work order, not a note. A temperature gun or infrared thermography gives a number to compare next time.

Pump bearings follow the pump maker’s own figures, which the pump maintenance checklist traces, and the motor’s grease checks sit on the electric motor maintenance checklist. The preventive maintenance schedule guide covers fitting routes around the rest of the week’s work.

Lubrication routes in Maintensor

Maintensor is preventive maintenance software, and a lubrication route is a work order that repeats.

  1. Make one work order per route, with its interval as the repeat: Weekly for the washdown route, Weekly with Every 8 for the pump room, Yearly for the motors.
  2. Attach a procedure: an Instruction step naming the grease, then one Checkbox per point with its amount, such as “Tower fan motor, drive end: 9 strokes, drain plug out”. Where a point needs a look, add an Inspection check; a Fail asks for a note and a photo and offers a follow-up work order, and the job can still be closed without them.
  3. Put the grease cartridges on the route as a planned part. They carry to each new work order, and stock comes off at completion.
The work order list filtered to recurring work: a daily forklift inspection due today, then two monthly services, a weekly lubrication and a quarterly check due this week.
The work order list filtered to recurring work: a weekly lubrication route sits among the week's daily, monthly and quarterly jobs.

The next route is created when this one is completed. A route finished late moves to the first date after today instead of piling up.

What it does not do

Repeats go by the calendar only, with no run-hour counter, meter or sensor, so the hours-to-weeks step above is done once by hand.

A work order has one asset, so a route across a line goes on the location, and each machine’s greasing shows in the route’s history rather than on the machine’s own record; give a critical machine its own work order.

Only Admins and Full users answer checklists, so whoever walks the route in the app needs a user seat.

Questions

What people also ask.

More in the blog, or see the whole product on the features page.

What is the difference between a lubrication chart and a lubrication schedule?

A lubrication chart lists every grease point: the machine, the bearing, the grease, how much and how often. A lubrication schedule turns the chart into work: which route is done on which day, by whom. The chart changes when a machine or a grease changes; the schedule changes when people or shifts do. Small crews often keep both on one sheet.

Do sealed bearings need grease?

Usually not. A bearing sealed on both sides is greased at the factory for its life, unless its housing has a grease fitting and the maker says to relubricate it, as some mounted units do. With no fitting, leave it alone and replace the bearing at the end of its life. List it on the lubrication chart with no grease, so nobody forces grease past the seal.

What grease should be used for electric motor bearings?

The grease named on the motor's lubrication plate or in its manual, or one the motor maker says is compatible. One motor maker fills its open bearings with a polyurea grease and warns that mixing greases with different thickeners can destroy their properties. If you must change grease, ask the maker how to purge the old one out first.

Set up your first recurring job.

Start the trial, pick one machine and one task, and set it to repeat. When the job is done, the next one appears on its own, due on the schedule's next date.

30-day free trial. No credit card.