What is an asset hierarchy?

An asset hierarchy arranges everything you maintain in levels, from the site down to each machine's components. It decides where each work order lands, so you can read the history of one motor, one line or a building.

By MaintensorUpdated

The levels of an asset hierarchy, from site to component

Each level answers a different question, from “which building?” down to “which motor?”.

Level What it is Example Gets work orders?
Site The plant, building or campus Plant 1 Rarely
Area A building, hall, floor or yard Production hall Sometimes: lighting, floors, doors
System or line Machines that do one job together Line 1; the compressed air system Sometimes
Asset A machine with its own nameplate Conveyor 1 Yes, most of the work
Component Part of a machine, maintained or swapped as a unit Conveyor 1 gearbox Yes, where it has its own work
Part What you replace from the shelf A bearing, a V-belt No: parts are used on work orders

The names vary from site to site; what matters is using the same ones everywhere.

Asset hierarchy example: a sauce plant, from site to motor

ExampleA made-up plant that cooks and bottles sauces

  • Plant 1 (site)
    • Production hall (area)
      • Line 1 (line)
        • Filler, Line 1 (asset)
        • Conveyor 1 (asset)
          • Conveyor 1 drive motor (component)
          • Conveyor 1 gearbox (component)
    • Utility room (area)
      • Air compressor 1 (asset)
    • Roof (area)
      • Rooftop unit 1, offices (asset)

Suppose Conveyor 1 had 11 work orders last year. Filed against the conveyor alone, that reads as “the conveyor is unreliable”. Filed at the right level, it shows 6 of the 11 were on the gearbox, so the fix is a gearbox rebuild, not a new conveyor. And everything under Line 1 is what Line 1 cost.

Asset hierarchy vs the asset register, locations and a BOM

  • The asset register is the list; the hierarchy is the shape it hangs in.
  • A location is a place; an asset is equipment. The boiler room is a location and the boiler an asset.
  • A bill of materials lists the parts below a machine. Parts belong in the storeroom, linked to the assets they fit, not as more levels of the tree.

How deep a small team should go

Add a level only where work lands

Before any new level or record, ask: will someone write a work order against it, or want its history on its own? A criticality score tells you which machines deserve a component level.

As made-up arithmetic, a plant with 40 machines might need 12 locations, 40 machine records and about 20 components: 72 records, not the 600 a breakdown to every motor and valve would take. The asset register guide covers naming, tagging and building the list.

Parent locations and parent assets: the hierarchy in Maintensor

In Maintensor, locations nest: each can have a Parent location, and filtering the work order list by a location takes in every place inside it. An asset sits in one location and can have a Parent asset, as a motor has its conveyor, chosen when the asset is created or later on its record, which lists its sub-assets.

The asset list groups assets by location, not under their parent, so name components after their machine (“Conveyor 1 gearbox”). Each asset keeps its own work orders; the app does not add a component’s work to its parent’s.

The locations list: the plant at the top, three areas under it, and under Building services a boiler room, a lab and two roof wings with their asset and open work counts.
Locations inside locations: the plant, three areas under it, and under Building services a boiler room, a lab and two roof wings, each with its asset and open work counts.

Questions

What people also ask.

More in the glossary, or see the whole product on the features page.

What is the difference between an asset hierarchy and an asset register?

The asset register is the list: one line per asset with its tag, location and nameplate details. The hierarchy is the structure the list hangs in: which place holds each asset, and which machine each component belongs to. A register with a location column and a part-of column already describes a hierarchy.

How many levels should an asset hierarchy have?

Most small sites do well with two or three levels of location (site, area, then room or line) and one or two of equipment (the machine, then its components). Add a level only when someone will write work orders against it or ask for its history on its own. A deep tree nobody uses makes every job harder to file.

Start with the machine that gives you the most work.

Start the trial, add that one asset with its location and nameplate, and write its first work order. Its history builds from there, job by job.