What is a maintenance bill of materials?

A maintenance bill of materials (BOM) is the list of spare parts that fit one asset: each part's name and number, how many the machine holds, and whether you stock it. It is not the manufacturing BOM.

By MaintensorUpdated

What a maintenance BOM lists

A maintenance BOM, also called an equipment parts list or spare parts list, is written per asset. Each line is one part: what it is, its reference number on the maker’s drawing, the part number you order by, how many the machine holds, and how many you keep.

Manufacturing BOM Maintenance BOM
Lists What goes into a product you make The parts that fit a machine you own
Quantities Per unit of product Per machine, and how many to stock

How to build a maintenance BOM in six steps

  1. Open the manual. Its parts list and exploded drawings give each part a reference number.
  2. Get the list for your serial number. The maker or dealer has it for your exact build.
  3. Read the work history. Two or three years of work orders show what was used.
  4. Look at the machine. Belt, filter and bearing numbers are printed on the parts.
  5. Decide what to stock. Wear parts, and long-lead parts that would stop a critical machine. One pump maker’s manual suggests at least a set of bearings and a spare of each moving part; reorder points set how many.
  6. Note shared parts. If a twin pump takes the same seal, one spare covers both.

Keep it in step with the machine

Update it when a part is superseded (keep the old number beside the new), as the last step of any job that modifies the machine, and yearly against the parts its work orders used.

Maintenance BOM example: a pump

A made-up end-suction pump, P-101, with an identical twin, P-102. Part numbers, prices and lead times are invented; the bearing sizes are standard.

Ref Part Part number In the pump Keep Why
1 Mechanical seal MS-150-A 1 1 Replaced twice in 3 years
2 Casing gasket GK-210 1 2 Replaced with every seal job
3, 4 Bearings 6309 and 3309 1 each 1 set The maker suggests a set
5 Impeller IMP-85 1 0 3-week lead time accepted: P-102 can carry the load
6 Shaft sleeve SL-45 1 1 Scored by worn seals
7 Coupling element CE-20 1 1 Cheap, and the pump stops without it

At made-up prices (seal $420, two gaskets at $15, bearing set $90, sleeve $110, coupling element $35), $685 on the shelf covers both pumps for the failure their history says comes every 18 months.

The same columns are a free Excel file, one sheet per asset, with 60 lines and a box at the top for the asset, its make, model and serial number, and the machines that share its parts.

The blank maintenance BOM template on one Letter page: the asset's details, then lines for ref, part, part number, how many in the machine, how many to keep, and why.
  • Download ExcelTo fill in for each asset and print, with 60 lines. 18 KB

Maintenance BOM vs asset hierarchy, MRO inventory and a job’s parts list

  • The asset hierarchy stops at components; the BOM is the level below.
  • MRO inventory is the whole storeroom; the BOMs say why each part is in it.
  • A job’s parts list is the few parts one work order needs, taken from the BOM.

Spare parts inventory management covers the storeroom around the BOMs.

Linking parts to the assets they fit in Maintensor

In Maintensor’s spare parts inventory management software, a part’s record has a “Used on” list of assets, and each asset’s Parts tab shows the parts it uses with what is on hand across all locations, marking any below its reorder level.

The link has no quantity: it says a part fits, not how many the machine holds, so note the count in the asset’s Description.

The parts a conveyor uses: bearings and grease in stock, and a V-belt marked Below reorder level with 7 on hand.
The parts a conveyor uses: bearings and grease in stock, and a V-belt marked Below reorder level with 7 on hand.

Questions

What people also ask.

More in the glossary, or see the whole product on the features page.

Where do you find the parts for a maintenance BOM?

In the maker's manual and its recommended spares, from the maker or dealer for your serial number, in the work orders, and on the machine itself, where belt, filter and bearing numbers are printed.

Does every asset need a bill of materials?

No. Start with the assets that stop production when they fail, the ones whose parts take weeks to arrive, and families of identical machines that share parts. A short set of BOMs for the machines that matter beats a complete set nobody finishes.

Know what is on the shelf before the job starts.

Start the trial, add the parts your crew uses most with a reorder level, and put them on a work order. A job that needs more than the storeroom holds says so.

30-day free trial. No credit card.