CMMS implementation for a small crew: the first two weeks

CMMS implementation for a crew of 3 to 15 is about ten working days, not a project with consultants. Enter locations, the 20 or so assets that make the most work and their recurring jobs, then invite the crew.

By MaintensorUpdated 10 min read

Key points

  • The order is locations, assets, recurring work, the crew, then requesters, because each step needs the one before.
  • Start with the 20 or so assets that make the most work, not all 400.
  • From day 6, if it is not a work order, it did not happen.
  • A spreadsheet can be imported, but a cleaned short list beats a long messy one.
  • Let people outside the crew send requests only once the crew answers its own work in the system.

The two-week checklist

The first two weeks are ten working days, and the manager or lead does the setup in the gaps of normal work, about two hours a day. “The 20 assets” are the ones that make the most work. If CMMS is a new term, start with what a CMMS is.

Day Do this Done when
1 Write the location tree; photograph the nameplates of the 20 assets Every location the 20 sit in exists
2 Enter the 20 assets with nameplate and photo Each has a location, maker, model and serial
3 Enter the recurring jobs for those assets, with an owner and a real first due date No two big jobs land on the same day by accident
4 Write 2 or 3 checklists; turn every open whiteboard job into a work order; wipe the board The board is empty and the list is not
5 Invite everyone who does the work; 20-minute walk-through; one real job each to close that shift Every person has closed a work order
6 From today, every job is a work order; stand-up from the list No job done today exists only on paper
7 Read every closed work order; answer the notes Every problem in a note has a reply or a follow-up job
8 Invite a few requesters: shift leads, front desk, warehouse supervisor The first request is approved, or declined with a reason, the same day
9 Fix what annoyed the crew; add the assets that came up Nobody asks where to tap
10 Count jobs in the system against jobs done on a word; pick the next 20 assets You know what weeks 3 and 4 add

The order of work, and why it runs that way

The order is locations, assets, recurring work, the crew, then requesters, because each step needs the one before it.

  1. Locations first. Every asset sits somewhere, and the location is how a technician finds it.
  2. Assets next. The asset is where a job’s history collects.
  3. Recurring work third. A preventive job belongs to an asset, so the asset has to exist first.
  4. The crew fourth. When technicians first sign in, their real jobs should be waiting. An empty screen on day one tells them the system is optional.
  5. Requesters last. A request that gets no answer teaches people to stop sending them. Open that door only once the crew is answering its own work in the system.

Plan on a small first batch

A spreadsheet can be imported (see the last section), but cleaning the list is the slow part, and a cleaned short list beats a long messy one. So the real decision is how little to clean and enter before you start. Add the rest as work touches it.

Start with 20 assets, not 400

Start with the 20 or so assets that make the most work, and add the rest as work orders need them. Entering an asset properly means its name as on the tag, its location, its maker, model and serial number, and a photo of the nameplate.

Example400 assets first, or 20

Say entering one takes 7 minutes, counting the walk to read the plate (a made-up figure; time a few of your own).

  • Everything first: 400 × 7 min = 2,800 min, about 47 hours. More than a week of one person’s time before the crew sees a single work order.
  • The 20 first: 20 × 7 min = 140 min, under 2.5 hours. One afternoon, and the crew starts on day 5.

If the 400 already sit in a spreadsheet, an import saves the typing, but not the walk to the nameplate, the cleaning or the checking. That is why the first 20 still come first.

Choose the 20 by three tests. Most of the time they pick the same machines:

They make the most work
Count the whiteboard photos, the texts or the old log for the last three months.
They stop something when they fail
A line, shipping, guest rooms, heat.
They already have a recurring service
One that someone is keeping track of in their head or a spreadsheet.

In a plant that might be the compressors, the main conveyors and the boiler. In a hotel, the boilers, the chiller, the elevators and the kitchen’s refrigeration.

The other 380 come in on their own, each the first time a work order needs it. The equipment that never gets work was never worth typing. The guide to building an asset register covers which fields are worth keeping.

Day by day: what the checklist cannot hold

Days 1 and 2: locations and the first 20 assets

Keep the location tree to two or three levels: site, then building or area, then room or line, such as “Plant, Packing hall, Line 2”. A hotel might go “Main building, Floor 4, Room 412”, but add a room only when it has an asset or gets work. The glossary entry on asset hierarchy explains how deep to go.

The locations list: the plant at the top, three areas under it, and under Building services a boiler room, a lab and two roof wings with their asset and open work counts.
A location tree: the plant at the top, three areas under it, and rooms under Building services with their counts of assets and open work.

Name each asset the way the crew says it, plus the tag: “Air compressor AC-1”, not “the big one by the dock”.

Day 3: the recurring work on those assets

Pull the recurring jobs off the whiteboard, the PM spreadsheet and the manuals, with one recurring work order per job and asset. Expect 15 to 30 in all. Building a preventive maintenance schedule covers intervals and how to spread the load.

Set each first due date from the last service

Set it from when the job was last done, not from today. If you set them all to start this week, they all come due in the same week every quarter.

Day 4: two or three checklists, and the open jobs

Write checklists only for the recurring jobs where the steps matter: a lockout, readings to take, a sequence that someone always gets wrong. The preventive maintenance checklist has tasks to start from. Leave the rest as a title and a description for now.

Every open job on the whiteboard becomes a work order with a title, an asset, a priority and a person. Photograph the board and wipe it: two systems side by side is how the new one dies.

Day 5: invite the crew, and show them in 20 minutes

At the start of a shift, with the crew on their own phones, show four things:

Find my workStart a jobAdd a note and a photoComplete it

Days 6 to 9: every job goes through it

From day 6 the rule is simple: if it is not a work order, it did not happen. A job that comes in by voice gets typed in by whoever took the call. Start each shift with ten minutes at the list instead of the board: what is overdue, what is due today, who has it.

Answer the notes

Read every closed work order in the second week and answer the notes. A technician who writes “belt starting to crack, replace next month” and hears nothing will write “done” next time.

On day 8, tell the new requesters one thing: send it here and you will see the answer. Then answer every request that day, even when the answer is no and here is why. The maintenance request process covers what to ask for and how to say no.

Day 10: count, then pick what comes next

Count three things: jobs that went through the system against jobs done on a word; work orders closed with a real note; recurring jobs done on time. Then decide whether parts come next (only the parts that have stopped a job).

What to leave out at first

Leave out for now Why Add it when
Old jobs from the binder Days of typing that nobody reads Never: keep the binder as a read-only archive
Old jobs from a spreadsheet An import is quick, but a long history buries the jobs that matter You would look them up: import the history of your critical assets, as done work orders
The full parts list Counting a storeroom is a project of its own A job stops for a part; start with those parts
A checklist for every job Long checklists get ticked without being done Different people keep doing the same job differently
Every optional field Fields nobody fills in teach people to skip fields A question you need answered depends on it
Reports Two weeks of records say nothing After a full month, better a quarter

How to get technicians to close work orders

Technicians close work orders when closing is quick and someone reads what comes back.

One reason rollouts stall

The DOE’s O&M Best Practices Guide (Release 3.0, section 4.3) lists a lack of commitment to keep using the system among the common pitfalls. It notes that most successful installations have a “champion” who keeps it in use.

On a crew of six, that is the manager, every day, for the first month.

  • Make closing faster than not closing. Ask for what was found, what was done, a photo where it helps. A closed work order with one honest line beats a perfect one left open.
  • Close it at the machine. On the phone, when the job ends, not at the end of the shift from memory.
  • Stop accepting a spoken “done”. For the first two weeks, the answer to “that’s done” is “close it and I’ll look”.
  • Read what comes back, and act on it. A note that leads to a follow-up job is the strongest reason to write the next one.
  • Never use it to blame. If logged time is held against someone, the times stop being true.
  • Ask what annoys them, and fix it in week two. A step that does not fit, a field nobody needs.

How to write a work order a technician can act on covers the titles that make the history worth reading later.

Doing it in Maintensor

  • The crew. When you create the organization, the Invite your team step takes email addresses and one role for everyone on the list. Skip it until day 5 and invite people later from Settings, Users. Anyone who runs a checklist needs a Full user seat.
  • Locations and assets. Every asset needs a location. A machine with identical stations (ten CNC bays, a row of dock doors) can be one asset with units.
  • Recurring work. A work order takes a Repeat setting and a due date. When it is completed, the next one is created, and its date counts from the last due date, not the day the job was done; a job finished very late skips to the first date after today.
  • Requesters. They are free on every plan, so day 8 costs nothing. They sign in, press Report a problem, and follow the answer on My requests. Only Admins see the request queue, so whoever answers on day 8 must be an Admin.

Importing a spreadsheet

Import is on Pro and Max, so it is on for the whole trial. An Admin selects what the file holds (locations, assets, parts, vendors, work orders or users), from a template or their own file, and every row is shown before anything is saved. Procedures are not imported, so day 4’s checklists are typed in.

Import in the order of this plan

Locations, assets, then work orders, because a work order file matches its assets by name. An import has no undo, which is one more reason to start with the 20.

A PM list in a spreadsheet can come in as work orders with a due date and a Repeat column. A crew of 15 can come in as one users file: each person gets an invite email, and the bill for new paid users is shown before anyone is invited.

30 days of Pro
Every new team starts with 30 days of Pro, which covers these two weeks with room to spare.
Free after that
The Free plan holds 3 users, 3 procedures and 5 recurring work orders and has no import. A crew of six with a real schedule will need a paid plan.
Max, yearly
Max on a yearly plan includes assisted setup.

See every part of the product.

Questions

What people also ask.

More in the blog, or see the whole product on the features page.

How long does a CMMS implementation take for a small team?

A crew of 3 to 15 can be working in a CMMS within two weeks if it starts with the 20 or so assets that make the most work and adds the rest as work orders need them. Entering every asset first can take weeks of one person's time and pushes back the day the crew starts using it.

Should we enter our old work orders into the new CMMS?

Not by hand. Old jobs typed in after the fact take days and are rarely read, so keep the binder or the whiteboard photos as a read-only archive. If the old jobs already sit in a spreadsheet, they can be imported as done work orders in one pass, but bring in only what someone would look up, such as the history of your critical assets. Use the last service date of each recurring job to set its first due date, and let the new history start on the day the crew does.

What if technicians will not use the CMMS?

Find out why before pushing harder. The usual reasons are too many fields to fill in, no easy way to use it on a phone, and notes that nobody reads or answers. Cut what you ask for to a title, a note and a photo, read every closed job in the first weeks, and stop accepting a spoken "done".

Who should own the CMMS on a small crew?

The person who hands out the work, usually the maintenance manager or lead. They set it up, approve requests, read what comes back and run the morning look at the list. A system with no owner drifts back to the whiteboard within weeks, whatever it cost.

Try it on the work you have this week.