OEE calculator

Work out overall equipment effectiveness from planned time, run time and what the machine made.

Free, no sign-up. Nothing you type leaves your browser.

Calculate OEE

Showing the example from further down this page. Type your own numbers over it.

The shift, less breaks and planned stops.

Planned time, less every stop.

The fastest time for one unit, from the rated speed or the best the line has held.

Everything made, good or not.

Made right the first time.

OEE76%90% × 88.9% × 95%Availability90%405 ÷ 450 minPerformance88.9%1 × 360 ÷ 405 minQuality95%342 ÷ 360 units

Performance is the lowest of the three, so start there.

OEE formula

OEE = availability × performance × quality

Availability
run time ÷ planned production time
Performance
ideal cycle time × total count ÷ run time
Quality
good count ÷ total count

How to calculate OEE

  1. Take one machine and one shift. Start with the machine that limits output.
  2. Enter the time. Planned time is the shift less planned stops such as breaks. Run time is that less every stop.
  3. Enter the output. The ideal time for one unit, then everything made and how many were good.

OEE example: one 8-hour shift on a packing line

A made-up line: 450 planned minutes, 45 minutes of stops, an ideal rate of one case a minute, 360 cases made and 18 rejected.

90%Availability
405 ÷ 450 min
88.9%Performance
360 ÷ 405 cases
95%Quality
342 ÷ 360 good
76%OEE
0.90 × 0.889 × 0.95

What your OEE tells you

Start with the lowest of the three parts:

  • Availability points at stops. Look at the stop log, and at the MTBF of the machine.
  • Performance points at slow running and short stops.
  • Quality points at scrap and rework, often after a changeover.

Compare a machine with itself

No score is good for every machine: it rests on what each site counts as planned time and where it takes the ideal rate from. Hold both fixed, and set the target from your own last three months.

OEE questions

My machine is rated in units per minute. What do I enter?

Ideal cycle time is the time for one unit, so turn the rate over: 60 cases a minute is about 0.017 minutes a case, and 2 cases a minute is 0.5.

Why does it say to check the ideal cycle time?

Because the numbers would put performance above 100%: the machine made more than its ideal rate allows in that run time. The ideal rate was set slower than the machine really runs. Use the maker's rated speed or the fastest rate the line has held.

Does planned maintenance count against availability?

That is each site's choice. Pick one rule, write it down and keep it, because changing it moves the figure with nothing changed on the floor.

More free tools

All tools
  • MTBF calculator

    Mean time between failures

    Operating hours ÷ failures

  • Downtime cost calculator

    What one stop really cost

    Each cost added up ÷ hours down

  • MTTR calculator

    Mean time to repair

    Hours down ÷ failures

Keep the downtime side on record.

Start the trial and set an asset to Down or In maintenance as it happens. On Pro and Max, Reporting shows Admins planned against unplanned downtime. The app does not work out OEE: it has no production counts.

30-day free trial. No credit card.