Downtime cost calculator

Add up what one stop really cost: lost margin, wages, scrap, rush parts, outside help and penalties.

Free, no sign-up. Nothing you type leaves your browser.

Calculate the cost of a stop

Showing the example from further down this page. Type your own numbers over it.

Units lost for good × the margin on each.

People × idle hours × hourly cost.

People × overtime hours × overtime rate.

Units scrapped × their cost.

Rush fees and expedited shipping.

Call-outs, contractor hours, rentals.

Late charges, rent credits.

From the stop until it runs again.

Cost of the stop$12,044$8,400 + $1,614 + $900 + $530 + $600Cost per hour down$2,007$12,044 ÷ 6 h

Lost margin is the biggest line: 70% of the stop.

Downtime cost formula

cost per hour = (lines A to G added up) ÷ hours down

Lines A to G
lost margin, idle labor, overtime, scrap, rush parts, outside help, penalties
Hours down
from the stop until the line is running again

How to calculate downtime cost

  1. Take one stop. A real one, recent enough to find its numbers.
  2. Fill in the lines that apply. Leave the rest blank: a blank counts as $0.
  3. Enter the hours down. Then read the total and the cost per hour.

Three rules that keep it honest

Margin, not revenue
The price less what you did not pay because the unit was never made. Wages are not subtracted.
Lost for good, or made up?
If overtime makes up the output, the stop cost the overtime, not the margin.
Wages once
Operators' wages for output lost for good are already inside the lost margin.

Downtime cost example: a packaging line down for 6 hours

A made-up line lost 3,600 cases. A Saturday shift made up 2,400 of them, so 1,200 were lost for good.

$8,400Lost margin
1,200 cases
$1,614Overtime to catch up
$12,044Cost of the stop
all five lines
$2,007An hour
$12,044 ÷ 6 h

Half of the stop was spent waiting for a gearbox. Those 3 hours cost roughly $6,000, and a spare gearbox costs $2,600.

What your downtime cost tells you

  • Weigh it against a spare. The sum above is the case for keeping one on the shelf.
  • Find out why it stopped. The root cause worksheet takes one failure through to an action.
  • Keep a tally. The downtime cost guide shows a running list, and a second example with a chiller.

Downtime cost questions

Should I use a typical cost per hour for my industry?

No. A dollars-per-hour figure borrowed from someone else's industry tells you nothing about your line or your building. Add up your own stop, from numbers you can look up.

Does the repair go in here?

No. Repair cost is what the fix itself took: parts at their normal price and your own crew's hours. Downtime cost is what the stop cost everyone else. Keep them apart, and report them side by side.

What if we made up the lost output on overtime?

Then the stop cost you the overtime, not the margin. Count each unit in one line only: lost margin for output gone for good, overtime for output made up later.

More free tools

All tools
  • MTTR calculator

    Mean time to repair

    Hours down ÷ failures

  • OEE calculator

    Overall equipment effectiveness

    Availability × performance × quality

  • Root cause worksheet

    The 5 whys and a fishbone on one page

    One page to print, or save as a PDF

Keep the record of each stop.

Start the trial and set an asset to Down when it stops. Its History lists each change, and on Pro and Max, Reporting ranks for Admins the five assets with the most unplanned downtime, with their repair cost.

30-day free trial. No credit card.