MTTR calculator

Work out mean time to repair from the hours machines were down and how many failures caused them.

Free, no sign-up. Nothing you type leaves your browser.

Calculate MTTR

Showing the example from further down this page. Type your own numbers over it.

Each stop to its restart, added up.

The stops those hours came from.

MTTR4.3 h

52 h ÷ 12 failures = 4.3 h

About 4 h 20 min for each failure.

MTTR formula

MTTR = hours from failure to back in service ÷ number of failures

Clock starts
when the machine stops, or when someone notices the failure
Clock stops
when the machine is running and doing its job again

How to calculate MTTR

  1. Pick the period. A quarter gives enough failures to mean something.
  2. Add up the hours down. From each stop to back in service, all of it.
  3. Count the failures. The same stops, above a threshold you set once.

MTTR example: six assets over one quarter

A made-up small plant had 12 failures across six assets, with 52 hours down in all.

52 hHours down
12 failures
1.6 hHands-on, average
19 h ÷ 12
2.4 hWithout the dock door
26 h ÷ 11
4.3 hMTTR
52 h ÷ 12

One dock door was down 26 hours, almost all of it waiting for a spring that was not in stock. One missing part nearly doubled the average.

What your MTTR tells you

  • Find the longest repair. Put it beside the figure and ask where its hours went. The fix is often on the storeroom shelf: the reorder point calculator helps there.
  • Check the repairs held. A fast patch lowers MTTR and fails again. Read it beside the first-time fix rate.
  • Say which clock you used. Repair time and work order time go by the same name.

Pick one clock

Some crews time from the stop, some from when a technician starts, some from when the work order opens. Write yours at the foot of every report, and do not switch.

MTTR questions

Does waiting for a part count in MTTR?

Yes. Everything between the stop and the restart counts: waiting for a technician, finding the fault, waiting for parts, the repair, testing and restart. That wait is often the biggest part of the figure, and the easiest to fix.

How do I enter minutes?

As a share of an hour: 90 minutes is 1.5, and 20 minutes is about 0.33. Add up all the stops in hours first, then enter the total.

Do planned stops count?

No. Leave out preventive maintenance, changeovers and cleaning. Counting them punishes the crew for doing preventive work.

More free tools

All tools
  • MTBF calculator

    Mean time between failures

    Operating hours ÷ failures

  • First-time fix rate calculator

    Repairs that held on the first attempt

    Fixed first time ÷ repairs closed

  • Downtime cost calculator

    What one stop really cost

    Each cost added up ÷ hours down

See where repair time goes.

Start the trial and run your repairs as work orders. On Pro and Max, Reporting shows Admins MTTR for reactive work, and the Time to complete card splits it by status, so the waiting shows.

30-day free trial. No credit card.